BLT141-MIDTERM EXAMINATION

Total questions: 35

Worksheet time: 26mins

Name
Class
Date
1.

The having a slight arc or bend induced in a beam.

a)

deflection

b)

camber

c)

tilt-up

2.

Concrete is mixed and poured directly into a mold on-site.

a)

cast-in-place

b)

pre- cast

c)

wall panel

3.

The main reason why do we need to vibrate a freshly poured concrete?

a)

To level the surface.

b)

To avoid honeycomb

c)

To harden the concrete

4.

  A precedent of wall panel systems and a type of building masonry construction that uses stones and mortar.

a)

Stone Masonry Walls

b)

Stone Pavements

c)

Stone finished wall

5.

The system of structural components which separate the stories of a building.

a)

Columns

b)

Floor systems

c)

Beams

6.

A type of floor system that is made up of wide band beams running between columns with narrow ribs.

a)

Ribbed Slab

b)

Waffle Slab        

c)

Span stess

7.

A two-way reinforced concrete slab that the load is transferred directly to the supporting concrete columns and does not have beams and girders.

a)

Slab on grade

b)

Flat plate

c)

Flat slab

8.

A type of floor system that has a thin topping slab and narrow ribs spanning in both directions between column heads or band beams.

a)

Waffle Slab        

b)

Ribbed Slab

c)

Span stress

9.

It is a one- or two-way system usually supported directly on columns or load bearing walls.  

a)

Flat plate

b)

Flat slab

c)

Girders

10.

It increases the shear capacity and the stiffness of the floor system under vertical loads; it also acts as T-beams over the supports.

a)

Girders

b)

Drop panel

c)

Beams

11.

The main reason why we need to provide a drop panel or column capital when using a flat slab floor system.

a)

Columns tends to punch-though the floor.

b)

Columns tend to be raptured.

c)

Columns tend to be twisted

12.

A floor system that enables continuous, non-interrupted, cast-in-place flawless /no joints concrete structures.

a)

Slip form

b)

Flat Slab

c)

Span Stress

13.

A type of floor system that the floor is casted on top of the previous slab and then raising the slab up with hydraulic jacks.

a)

Lift-slab method

b)

Tilt-up method

c)

Slip-form

14.

A single piece of material, usually flat and cut into a rectangular shape, that serves as the visible and exposed covering.

a)

Wall

b)

Wall system     

c)

Floor system     

15.

A type of wall system that uses a metal composite material. Commonly used for offices and commercial establishments.

a)

Flat type

b)

Ribbed type       

c)

Wall type

16.

  It is also known as Curtain wall?

a)

Window type    

b)

Wall type

c)

Flat type

17.

What is CHB stands for?

a)

Concrete Hollow Blocks

b)

Concrete Hallow Blocks

c)

Concrete Hollow Bricks

18.

Span stress floor system is also called?

a)

Pre-cast floor

b)

Steel floor system.

c)

Steel wall system.

19.

It is one of the most extensively used walling materials in the Philippines.

a)

CHB

b)

Dry walls

c)

Masonry Walls

20.

The process of hardening a poured concrete.

a)

Curing

b)

Settling

c)

Strengthening

21.

Concrete is made in a plant and shipped to a construction site as individual units. Commonly used for buildings with typical floors.

a)

Pre-cast

b)

cast-in-place     

c)

Wall panel

22.

What is the height of the CHB in centimetres?

a)

20

b)

25

c)

30

23.

A type of wall panel precedents using woodframe and plywood as materials for partition?

a)

Drywall

b)

Thin wall

c)

Flat wall

24.

What is the size of a plywood in centimetres?

a)

120 x 240

b)

125 x 145

c)

125 x 250

25.

What is the length of a CHB in centimetres?

a)

30

b)

40

c)

45

26.

Identify the wall system used. (2pts.)

4 lines
27.

Identify the wall system used. (2pts.)

4 lines
28.

Identify the wall system used. (2pts.)

4 lines
29.

Identify the wall system used. (2pts.)

4 lines
30.

Identify the wall system used. (2pts.)

4 lines
31.

Identify the floor system used. (2pts.)

4 lines
32.

Identify the floor system used. (2pts.)

4 lines
33.

Identify the floor system used. (2pts.)

4 lines
34.

Identify the floor system used. (2pts.)

4 lines
35.

Identify the floor system used. (2pts.)

4 lines