Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

SITE PLANNING PRINCIPLES AND FACTORS pt.4

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

The hard, solid rock beneath surface material such as soil and gravel. It is a consolidated rock, meaning it is solid and tightly bound.

a)

Igneous rock

b)

Sedimentary rock

c)

Metamorphosed rock

d)

Bedrock

2.

Which of the following is the usual problem to consider in a flat slope site?

a)

landslide

b)

soil erosion

c)

surface flooding

d)

existing wildlife

3.

Which of the following is not a problem to consider in a steep slope site?

a)

landslide

b)

soil erosion

c)

surface flooding

d)

existing wildlife

4.

What is the optimum slope for a playground?

a)

1%

b)

2%

c)

3%

d)

4%

5.

What is the optimum slope for a housing site?

a)

1%

b)

2%

c)

3%

d)

4%

6.

It is a permeable geological stratum or formation that can both store and transit groundwater in significant quantities.

a)

Water table

b)

Aquifer

c)

Watershed

d)

Wetlands

7.

The knowledge of water boundaries is critical to the water quality and storm water management since, it is also called as drainage basin. It is any area of land where precipitation collects and drain off into a common outlet, such as into river, bay or other body of water.

a)

Water table

b)

Aquifer

c)

Watershed

d)

Wetlands

8.

When it comes to urban land use, I-1, I-2, I-3 are color coded in

a)

Yellow

b)

Red

c)

Violet

d)

Blue

9.

When it comes to urban land use, TZ are color coded in

a)

Aqua

b)

Orange

c)

Dark Green

d)

Green

10.

In a commercial development, what should be the priority in choosing a site?

a)

Visibility

b)

Lot size

c)

Lot shape

d)

density and zoning

11.

Which of the following lot type is not ideal or least desirable for a public school?

a)

Inside lot

b)

Corner through lot

c)

corner lot

d)

through lot

12.

Which of the following site location is least desirable for a high-end restaurant?

a)

inside a casino establishment

b)

in a CBD

c)

beside a church

d)

across a of a public school

13.

This is important to determine the existing availability on site in terms of adequacy and efficiency.

a)

Utilities

b)

Power supply

c)

waste disposal

d)

Wifi

14.

When the site is located in Palawan and has a view of a beach what should be delimited?

a)

outdoor dining

b)

balcony

c)

terrace

d)

sunbaffles

15.

When the site is located in Palawan and has a view of a beach what should be maximized?

a)

view

b)

population

c)

marketability

d)

buildable area