wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Assessment 1

Total questions: 15

Worksheet time: 3mins

Name
Class
Date
1.

For the resistance of cement against temperature change, the test essentially done is soundness.

a)

True

b)

False

2.

To obtain cement dry powder, limestones and shales or their slurry, burnt in a rotary kiln at a temperature between 1100 °C – 1200 °C.

a)

True

b)

False

3.

After casting, an ordinary cement concrete on drying expands.

a)

True

b)

False

4.

Gypsum in cement decreases the setting time.

a)

True

b)

False

5.

Hydration of cement is due to chemical action of water with dicalcium silicate and tricalcium aluminate.

a)

True

b)

False

6.

Vicat apparatus is used for soundness test.

a)

True

b)

False

7.

The commonly used material in the manufacture of cement is graphite.

a)

True

b)

False

8.

For road pavements, the cement generally used is rapid hardening cement.

a)

True

b)

False

9.

Hardening of cement occurs at uniform rate throughout its age.

a)

True

b)

False

10.

Kerosene is used as fuel in the production of cement.

a)

True

b)

False

11.

Reasons for testing materials. (Select all that apply)

a)

Research

b)

Quality assurance and quality control

c)

Failure Analysis

d)

Design Analysis

12.

What property of Portland cement is determined using the Vicat apparatus? (Select all that apply)

a)

Normal Consistency

b)

Soundness

c)

Time Setting

d)

Fineness

13.

It is the measure of correct amount of water added to a specific quantity of cement to form a workable cement paste.

a)

Normal Consistency

b)

Soundness

c)

Time Setting

d)

Fineness

14.

Test performed by a company receiving new supplies to make certain that the shipment meet the standard called for in the order.

a)

Quality Assurance

b)

Failure Analysis

c)

Quality Control

d)

Design Analysis

15.

Test done by a company on their own products prior to shipment to ensure that the product meets the manufacturer's standard.

a)

Quality Assurance

b)

Failure Analysis

c)

Quality Control

d)

Design Analysis