wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Professional Practice 2 UE Final Examination

Total questions: 20

Worksheet time: 15mins

Name
Class
Date
1.

The Standards of Professional Practice (SPP) is a required

document under Sec. 11 of A. No. 9266 (The Architecture Act of

2004) and its Implementing Rules and Regulations (IRR).

a)

TRUE

b)

FALSE

2.

The ________ acts as the Owner’s/ Client's/ Proponent’s Adviser and/or Representative. He translates the Owner's needs and requirements to spaces and forms in the best manner of professional service

a)

Contractor

b)

Consultant

c)

Architect

d)

Construction

Manager

3.

The Specialized Architectural Services deals with specific expertise for further

enhancement of the architectural interior and exterior components of a project

a)

SPP No. 203

b)

SPP No. 202

c)

SPP No. 201

d)

SPP No. 204

4.

The services of a multi-disciplinary professional who can perform a wide range or functions for the efficient and economical operation and maintenance of a building, facility or a complex.

a)

SPP No. 205

b)

SPP No. 204A

c)

SPP No. 204B

d)

SPP No. 206

5.

Simplifies and expedites the process of project delivery while providing creative

cost-effective solutions.

a)

SPP No. 207

b)

SPP No. 206

c)

SPP No. 205

d)

SPP No. 204

6.

A Firm is a for -profit business organization, such as a corporation,

limited liability company or partnership that provides professional services.

a)

TRUE

b)

FALSE

7.

A business that legally has no separate existence from its

owner.

a)

Sole

Proprietorship

b)

Partnership

c)

Associates

d)

Corporation

8.

a legal entity that is separate and distinct from its

owners.

a)

Corporation

b)

Sole

Proprietorship

c)

Partnership

d)

Joint

Venture

9.

Two or more persons who have agreed to share the profits of a

business which they run together.

a)

Partnership

b)

Corporation

c)

Single

Proprietorship

d)

Joint

Venture

10.

They are in charge of managing different aspects of the projects.

a)

Project

Manager

b)

Senior

Architect

c)

Construction

Manager

d)

Architect

11.

Design Expertise represents the defining principles of good design in the 21st century.

a)

TRUE

b)

FALSE

12.

a global organization that works to provide the standardization of array products and companies.

a)

International

Organization

for

Standardization

b)

Global

Organization for

Standardization

c)

Design

Excellence

Standardization

d)

Global

Organization for

Excellence

13.

Model For Quality Assurance In Design, Development, Production, Installation And Servicing.

a)

Design

Excellenece

b)

Quality

System

c)

Quality

Control

d)

Quality

Standardization

14.

Monitor, measure, analyze, and evaluate QMS performance.

a)

Operations

b)

Planning

c)

Evaluation

d)

Leadership

15.

Enhance the suitability, adequacy, and effectiveness of your QMS.

a)

Leadership

b)

Innovation

c)

Support

d)

Improvement

16.

A Design Project, sometimes referred to just as a ‘project’, is the organized process of constructing, renovating, refurbishing, remodelling or demolishing a building, structure or item of infrastructure.

a)

TRUE

b)

FALSE

17.

College classroom buildings, convention halls, detention facilities, extended care projects, gymnasiums, laboratories, medical offices.

a)

Group 1

b)

Group 2

c)

Group 3

d)

Group 4

18.

the first phase of a project’s life cycle. It is at this point where the opportunity or reason for the project is identified and a project is developed to take advantage of that opportunity.

a)

Design

Phase

b)

Project

Initiation

c)

Planning

Phase

d)

Pre-Design

Phase

19.

the longest phase of the project management life cycle and is when the project team develops the product or service and presents the final product to the customer.

a)

Planning

Phase

b)

Execution

Phase

c)

Monitoring

Phase

d)

Closing

Phase

20.

They are incharge to keep projects from slipping away from the planned budget, timeline, and overall objectives, a project manager must monitor and control the project from start to finish.

a)

Construction

Management

b)

Project

Management

c)

Design

Management

d)

Design-Build

Management