Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

JIT / Kaizen

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

JIT means

a)

Just in time

b)

Just in case

c)

Joined instruction time

d)

Join in case

2.

JIC means

a)

Just in time

b)

Just in case

c)

Joined instruction time

d)

Join in case

3.

Which car manufacturer pioneered JIT and Kaizen?

a)

Toyota

b)

Ford

c)

VW

d)

Nissan

4.

Which of these are continuous improvement steps?

a)

Plan

b)

Act

c)

Review

d)

Identify

e)

Delete

5.

Kaizen is Japanese Term in which “Kai” refers to .....

a)

Good

b)

Change

c)

Improve

d)

None of Above

6.

Kaizen refers to......

a)

Doing Good Things

b)

Continuous Improvement

c)

Start Improvement

d)

Stop Improvement

7.

The Japanese Engineer ,Who developed lean /kaizen procedures was

a)

Taiichi Ohno

b)

Elton Mayo

c)

Henry Fayol

d)

Henry Gantt

8.

What are the benefits of Lean Manufacturing to the company?

a)

Improved quality.

b)

Reduced cost.

c)

Demotivates the workforce.

d)

Higher saleries for the managers.

9.

Which leading manufacturer is considered to be the founder of LEAN manufacturing.

a)

Coca-Coka

b)

Toyota

c)

Adidas

d)

Apple

10.

The term for the amount of time to make and item to fulfil and order is?

a)

Takt

b)

Tikt

c)

Tikky

d)

Takky