WorksheetsLO3 - Lean production and Outsourcing
Total questions: 8
Worksheet time: 10mins
Name
Class
Date
1.
What does the T stand for in JIT
a)
Topic
b)
Together
c)
Time
d)
TV
2.
What is lean production?
4 lines
3.
Which one of the following is NOT a method of lean production?
a)
Kaizen
b)
JIT
c)
Cell Production
d)
Outsourcing
4.
Outsourcing is an agreement where one company _____ ________ _______ to be responsible for a planned or existing activity.
(a)
5.
What operations might a school choose to outsource?
4 lines
6.
Which area is it the most important for businesses to utilise waste minimisation. Be prepared to explain your answer.
a)
Costs
b)
Time
c)
Raw Materials
d)
Production
7.
What does the term Kaizen mean?
4 lines
8.
Cell production is (a) down the production process into smaller stages.
100 %
