LEED Process & Project Surroundings | BD+C

Total questions: 57

Worksheet time: 47mins

Name
Class
Date
1.

A LEED Project is pursuing the following credits: SS Credit Places of Respite, SS Credit Direct Exterior Access, MR Credit PBT Source Reduction – Mercury and MR Credit Design for Flexibility. Which of the following project adaptations under BD+C does this project fall?

a)

Core and Shell

b)

New Construction

c)

Healthcare

d)

Hospitality

e)

Schools

2.

What options within LEED Credits address different geographic and climactic regions while providing solutions to challenges faced by projects at a regional level?

a)

Innovation credits

b)

Alternative Compliance Paths (ACPs)

c)

Integrative Process

d)

Minimum program requirements (MPRs)

e)

CIRs

3.

How many RP Credits are identified for every location?

a)

6

b)

5

c)

3

d)

4

4.

Which of the following may earn a project IN Credit Innovation under Option 1 – Innovation? (Choose 2)

a)

Designing and implementing a green education program

b)

A closed pilot credit

c)

Designing and implementing a green housekeeping program

d)

Corporate a carpool program

e)

Achieving LEED Certification under two different rating systems

5.

What best defines the LEED Project Boundary?

a)

Portion of the project site submitted for LEED Certification

b)

Total area within the platted property line not including any non-constructed areas

c)

Total area within the platted property line not including any constructed areas

d)

Platted property line of the project defining land and water within it

e)

Total area within the platted property line including any constructed areas and non-constructed areas

6.

Which of the following project strategies would earn an exemplary performance point under IN Credit Innovation Option 3 Additional Strategies? (Choose 2)

a)

Achieve a HVAC background noise level of 35 dBA or less

b)

Doubling the highest transit service point threshold for alternative transportation

c)

Achieve SS Credit Heat Island Reduction Option 1 Non-Roof and Roof and SS Credit Heat Island Reduction and Option 2 Parking Under Cover and place 75% of parking under cover

d)

Achieve a 55% energy savings

e)

Use 100% non-potable water for cooling tower

7.

The project team for a potential LEED Project in Phoenix, Arizona submits a summary of early design stage submittal materials for GBCI review to pursue LEED Pre-Certification. Which of the following statements must be true of the project?

a)

The project must be registered under Core and Shell

b)

The project must be registered under New Construction

c)

The project can only apply for Pre-Certification after the completion of detailed design documents

d)

The project can only apply for Pre-Certification after the completion construction

8.

A project team is exploring a full range of innovative opportunities in their project building by referring to the online innovation database for examples of successful innovation credits. Which of the following actions should the project team take if the project team seeks formal pre-approval of an innovation strategy?

a)

Wait until the project is complete to document the innovation credit and submit the documentation via LEED online

b)

Submit a CIR

c)

Review the LEED Reference Guide

d)

Use the Feedback Button on LEED Online

e)

Contact LEED Technical Support

9.

A potential School Project team is considering LEED Certification for their new school building. Which of the following credits must the project implement in order to earn LEED Platinum Level Certification? (Choose 3)

a)

EA Prerequisite Building Level Energy Metering

b)

EQ Credit Acoustic Performance

c)

EQ Prerequisite Minimum Acoustic Performance

d)

MR Prerequisite Storage and Collection of Recyclables

e)

Earn all innovation (ID) and regional priority (RP) credits

10.

A project is Oklahoma is analysing various credits for exemplary performance. Which of the following credits would qualify for the project to earn an exemplary performance point under IN Credit Innovation Option 3 Additional Strategies? (Choose 2)

a)

EA Credit Enhanced Refrigerant Management

b)

LT Credit Access to Quality Transit

c)

LT Credit Surrounding Density and Diverse Uses

d)

EA Prerequisite Minimum Energy Performance

e)

SS Credit Rainwater Management

11.

Which of the following fees is only applicable for LEED Core and Shell Projects?

a)

Construction Review Fees

b)

Pre-Certification Fees

c)

Design Review Fees

d)

Re-Certification fees

e)

Registration Fees

12.

After careful research, a project team identified two innovative ideas for successful innovation credits that were implemented in past LEED projects and awarded innovative credits. Which of the following actions should the project team take for successful implementation of the innovative ideas?

a)

Contact the LEED project to learn more on implementing the ideas

b)

Seek formal pre-approval from USGBC by submitting a CIR

c)

Implement the innovative ideas and document them just like other credits

d)

Wait until the project is complete to document the innovation credit and submit the documentation via LEED online

e)

Review the LEED Reference Guide

13.

The project team for a mixed use project located in Washington D.C. has more than 50% of its space for retail and a remaining 40% or less for office space. How should the project team decide which rating system to use?

a)

The project should use the 40/60 rule to decide on a rating system

b)

The project should choose the rating system that will result in the lowest certification costs

c)

The project should choose office space since that occupies 40%

d)

The project should choose BD+C: Retail since that occupies the majority

e)

The project should submit a CIR

14.

A LEED Project integrated team is iteratively testing many strategies as part of pursuing LEED Credit Integrative Process. Which of the following strategies is an example of an overlapping benefit that a project team might find during the ongoing discovery phase of energy and water systems?

a)

Deciding to increase ventilation by 30% for the project

b)

Deciding to perform water budget

c)

Deciding to perform energy modelling

d)

Selecting one paint over another for aesthetic reasons

e)

Utilizing waste heat from a mechanical system to heat hot water in the building

15.

Which design decision can earn a project IN Credit Option 1 Innovation in a new construction project?

a)

Implementing a Closed Pilot Credit

b)

Providing 10% on-site renewable energy

c)

Providing 100% of a project’s electricity using green power

d)

Implementing a credit from LEED O+M

e)

Providing 15% on-site renewable energy

16.

A LEED Core and Shell project team in New York City, New York is preparing a green housekeeping program to earn an innovation point. Which of the following should the project team do to earn the credit?

a)

The base building management should implement the green housekeeping program in base building first before implementing it in tenant spaces

b)

The base building management should control cleaning of the base building and request tenants to implement their own green house keeping program

c)

The base building management must control the cleaning of both the base building and tenant spaces

d)

The base building management must control the cleaning of all Core and Shell portions of the project

17.

A project in Seattle is analysing various credits for exemplary performance. Which project strategy would earn an exemplary performance point under IN Credit Innovation Option 3 Additional Strategies?

a)

Locate the building’s main entrance within 1/4 mile walking distance of ten or more diverse uses

b)

Locate 100% of parking under cover

c)

Manage 100% of rainwater that falls within the project boundary

d)

Design and implement a green education program

e)

Reduce water usage by 40% as compared to baseline

18.

Which of the following variables affect LEED Registration Cost? (Choose 2)

a)

Location of the Project – U.S. or Outside U.S

b)

Project’s size

c)

Time when the project team decides to register

d)

Substantial completion of the project

e)

Project’s rating system

19.

Which of the following credits would be applicable to a Healthcare Project pursuing LEED Certification?

a)

SS Credit Site Master Plan, SS Credit Site Assessment, EQ Credit Acoustic Performance

b)

MR Credit Building Life-Cycle Impact Reduction, LT Credit High Priority Site, SS Credit Site Master Plan

c)

SS Credit Direct Exterior Access, EQ Credit Quality Views, SS Credit Joint Use of Facilities

d)

SS Credit Places of Respite, SS Credit Direct Exterior Access, MR Credit PBT Source Reduction – Mercury

20.

Which of the following credits are only applicable for LEED BD+C Core and Shell Projects?

a)

SS Credit Tenant Design and Construction Guidelines

b)

LT Credit Green Vehicles

c)

LT Credit Bicycle Facilities

d)

SS Credit Site Master Plan

e)

SS Credit Light Pollution Reduction

21.

What more should a project do to submit and document RP Credits for LEED Certification?

a)

Projects should implement RP credit first and wait until project completion to document them

b)

Submit with construction submittals

c)

No additional documentation is required to earn Regional Priority Credits

d)

Submit separate documentation through LEED Online

22.

Which of the following are perks for a company that receives LEED Platinum awards for its HQ project?

a)

LEED Plaque

b)

Government rebates

c)

Branding and public relations (PR)

d)

The company could now become a LEED Reviewer

23.

How does USGBC encourage project teams to focus on their local environmental priorities in the project’s region?

a)

Awarding grants to projects to support local environmental causes

b)

Requiring projects to adhere to all local building codes

c)

Regional Priority Credits

d)

Granting innovation points for projects supporting local initiatives

24.

How many points can a project earn under innovation?

a)

6

b)

4

c)

3

d)

2

25.

A project is pursuing a split review process for LEED Certification. The team has received GBCI review for design credits and has started construction. The main person managing LEED Documentation gets pulled into another project and is unable to complete the construction documentation submission. How long can the project team wait to submit the construction phase review?

a)

No later than partial project occupancy

b)

No later than 6 months after the project is substantially completed

c)

No later than 24 months years after the project is substantially completed

d)

No later than 6 months after any new version of LEED is released

e)

No later than 12 months after the project is substantially completed

26.

A project in Raleigh, North Carolina was originally registered under BD+C: New Construction. Later during the pre-design stage, the owner finds three tenants to occupy the building space upon completion and hence wants to change the rating system to Core and Shell. Which action should be taken by the project team?

a)

Contact LEED technical customer service

b)

Submit the issue via the feedback button within LEED Online

c)

Submit a LEED interpretation

d)

Submit a project CIR

27.

Which of the following defines substantial project completion for LEED Certification?

a)

Date on which the building receives a certificate of occupancy or similar official indication that it is fit and ready for use.

b)

After building commissioning

c)

10 months after partial occupancy

d)

After building commissioning and building flush-out or air testing

e)

Partial occupancy

28.

Which design decision can earn a project IN Credit Option 1 Innovation in a new construction project?

a)

Providing 10% on-site renewable energy

b)

Providing 15% on-site renewable energy

c)

Green housekeeping program

d)

Implementing a Closed Pilot Credit

e)

Providing 100% of a project’s electricity using green power

29.

A Healthcare Project must meet the requirements of which of the following?

a)

SS Credit Joint Use of Facilities

b)

MR Credit Design for Flexibility

c)

MR Prerequisite PBT Source Reduction – Mercury

d)

MR Credit Furniture and Medical Furnishings

e)

SS Credit Places of Respite

30.

Who is responsible for identifying Regional Priority Credits for LEED Projects? (Choose 2)

a)

USGBC Member Companies

b)

Volunteers from LEED International Roundtable

c)

LEED Accredited Professionals

d)

LEED TAGs

e)

Volunteers from USGBC Local Chapters

31.

A project pursuing split review process for LEED Certification receives notification from GBCI when the preliminary review is complete for design submittal. The review consists of clarifications and technical advice on a few design credits. Which of the following should the project team or LEED Administrator do?

a)

The project team should respond to the technical advice and clarification through an email

b)

The project team should update the narrative of the credit and resubmit it for another design review

c)

The project team should respond to the technical advice and clarification after project completion

d)

The project team should respond to the technical advice and clarification through LEED online and re-submit credits if required

e)

The project does not have to do anything

32.

The LEED Reviewer response from a preliminary review indicates a project will be one point short of LEED Platinum. What should the project team do if they still want to pursue LEED Platinum?

a)

Exclude 10% of the gross floor area to try to improve the project’s energy performance

b)

See if the project can be certified under a different rating system

c)

Install extra bicycle racks to earn exemplary performance for LT Credit Bicycle Facilities

d)

Submit new or revised documentation for credits that were denied or require more information, or attempt additional credits before submitting the final review

33.

The project team for a core and shell building in India is considering a composting program. Which statement is true regarding the IN Credit Innovation for a composting program?

a)

GBCI Review would reject this submission unless the program is comprehensive and address the base building

b)

IN Credit Innovation for Core and Shell can only be earned if all occupants including tenants of the building are allowed to participate in the program.

c)

The project team should have a waste management plan in addition to the composting plan in order to meet the IN Credit Requirements.

d)

If another project in India earns the same IN Credit Innovation for implementing a composting program, then this project will also earn the credit.

34.

A project team is evaluating different project locations and sites for a potential LEED ND Project. Which of the following must be true in order for the site to qualify for LEED Certification under the LEED ND Rating System? (Choose 2)

a)

The site should be at least 1500 acres

b)

The site should be no larger than 1500 acres

c)

The site should be at least 100 acres

d)

The site should have at least ten habitable buildings

e)

The site should have at least two habitable buildings

35.

Which of the following actions should the project team take if the project boundary is not clear?

a)

Review the MPR

b)

Use a boundary that best serves the project

c)

Submit a CIR

d)

Ask the project owner which boundary to use

e)

Review the LEED Reference Guide

36.

Which of the following is true about Credit Interpretation Requests (CIRs)?

a)

Product vendors can access all CIRs to meet any updated credit requirements.

b)

Potential LEED Projects can access all CIRS and submit new

c)

Only LEED Projects can access CIRS

d)

CIRs can only be submitted during the construction phase of a project.

e)

USGBC company members, LEED registered project team members, and workshop attendees have access to view CIRs

37.

Which of the following is true about Credit Interpretation Requests (CIRs)?

a)

CIRs can be submitted for prerequisites

b)

Points are awarded by the CIR process

c)

Potential LEED Projects can access all CIRS and submit new

d)

CIRs can be submitted for credit appeals

38.

Which of the following project strategies would earn an exemplary performance point under IN Credit Innovation Option 3 Additional Strategies? (Choose 2)

a)

Achieve a 50% parking reduction from the base ratios for LT Credit Reduced Parking Footprint – Case 1

b)

Locate a brownfield project on an infill location in a historic district and perform remediation to the satisfaction of the authority that has jurisdiction

c)

Double the bicycle storage requirements

d)

Use 100% low-emitting materials

39.

Which of the following elements of the LEED v4 development cycle is utilized for streamlining the approach to unique needs, constraints, and opportunities of different project types?

a)

LEED Technical Advisory Group (TAG)

b)

Adaptations

c)

Recertification

d)

Interpretations

e)

LEED Online

40.

Which of the following special considerations would be part of the LEED Project Scope? (Choose 2)

a)

Underground parking

b)

Energy modelling of energy and water systems

c)

An off-site facility or amenity

d)

Bicycle network and green vehicles

e)

A shared facility that may be used by the project occupants

41.

The LEED Project Boundary may not include land that is not owned by the project owner unless:

a)

The land will be included in the next phase of LEED Certification

b)

The land will be purchased by the project owner after project completion

c)

The land is part of a larger campus project such as school, university or military campus

d)

The land is associated with the LEED Project and supports its normal building operations

42.

Which of the following is true for innovations that are not addressed by existing LEED credits? (Choose 3)

a)

The project should research all exemplary credit options

b)

Points can also be earned by achieving selected credits from other LEED rating systems

c)

The strategy must be significantly better than standard sustainable design practices

d)

The project must demonstrate a qualitative improvement in environmental performance by identifying or establishing a baseline of standard performance

e)

The project must demonstrate a quantitative improvement in environmental performance by identifying or establishing a baseline of standard performance

43.

Which of the following variables affect LEED Certification cost? (Choose 3)

a)

Project’s rating system

b)

Project’s Occupancy

c)

Substantial completion of the project

d)

Time when the project team submits documentation for review in LEED Online

44.

A Core and Shell Project in Santa Monica, California is pursuing Regional Priority Credits and is searching the USGBC Database to explore the six available credits to choose four credits. Which RP group should the project download?

a)

RP Credits applicable for O+M Projects

b)

RP Credits applicable for BD+C Projects

c)

RP Credits applicable for New Construction

d)

RP Credits applicable for Core and Shell Project Types

e)

RP Credits applicable for ID+C Projects

45.

A hospitality project team member finds an area not addressed in the LEED Reference Guide regarding WE Credit Outdoor Water Use Reduction. The team implements the credit and submits a suggested approach for the credit during the preliminary LEED Review Process. Which of the following is true regarding this project team’s approach?

a)

The approach will be rejected because it is outside the scope of the review process

b)

The project team will receive a determination in the review comments at the discretion of the USGBC or GBCI reviewer assigned to the project.

c)

The project should submit a CIR along with credit documentation

d)

The approach will be rejected and a Project CIR will need to be submitted instead

46.

How is the LEED Boundary determined for multi-building development especially when each building in the property will be a separate LEED Project?

a)

The project team divides the land equally among the LEED Projects

b)

The project team should determine the LEED Boundary for each LEED Project

c)

The project team contacts LEED Technical Resources

d)

The project team submits a CIR

e)

The project team uses the same boundary for all of the LEED Projects

47.

A project team for a potential new construction project under the BD+C Rating System is analysing various sites eligible for LEED Certification. Which of the following must be true of the project site, location and size in order to be eligible for LEED Certification? (Choose 3)

a)

The project building should be a minimum of 1,500 SF

b)

The project building should be a minimum of 1,000 SF

c)

The project boundary must include all contiguous land that is associated with the project and supports its typical operation

d)

The project should be constructed and operated on a permanent location on existing land

e)

The project should have a LEED Administrator

48.

Which of the following resources should be used to identify RP Credits for a project?

a)

USGBC Website RP Credit Library

b)

LEED Online RP Credit Library

c)

CIR

d)

RP Credits are automatically assigned at the time of project registration

49.

A project team is conducting a project life cycle (PLC) analysis for a new Core and Shell project in Washington D.C. Which building elements are covered under the LEED BD+C: Core and Shell Rating System? (Choose 3)

a)

Building Envelope

b)

Base Building HVAC system

c)

Furniture, furnishings, and equipment (FF&E)

d)

Base Building Structure

e)

Tenant fit-out

50.

How many points can a project earn for RP credits?

a)

3

b)

4

c)

5

d)

6

51.

A project team in Houston, Texas is preparing for a design charrette and a goal setting workshop to identify and use opportunities to achieve synergies across disciplines and building systems as well as meet the requirements for IP Credit Integrative process. In addition, the project team performed various analyses to evaluate energy and water related systems for the project. Which of the following should the project team do to document for IP Credit Integrative Process?

a)

Perform a preliminary “simple box” energy modelling analysis

b)

Document how the analysis informed design and building form decisions in the project’s OPR and BOD and the eventual design of the project

c)

Document the project schedule for energy and water systems

d)

Document the costs associated with energy modelling

52.

You are registering an office project in Hiawatha, Iowa under the LEED BD+C rating system. Which of the following design decisions would you not recommend for LEED Certification?

a)

The new building is located on a campus certified under LEED v4

b)

The area of the building will be 1500 square feet

c)

The building will be three stories high

d)

One of the modular offices will be moved to another location after project completion

e)

The building will be located 75 feet away from a lake

53.

A project team member is very active in his community. He is working with the owner to devise a program that fosters the growth of green buildings by showcasing the project building as an example. Which of the following instructional initiatives would satisfy the requirements of an education program for innovation for IN Credit Innovation? (Choose 2)

a)

An educational webinar recorded on a CD and distributed to all building visitors

b)

A comprehensive signage program throughout the project to educate occupants and visitors about the benefits of sustainable buildings

c)

A press release at project completion announcing the project certification

d)

Weekly guided tours on sustainability and building green using the project as an example

54.

Which of the following defines the LEED Boundary for a single building development? (Choose 2)

a)

The portion of project site submitted for LEED Certification

b)

The entire project scope, generally limited to the site boundary

c)

The edge of the development footprint minus the building footprint

d)

The edge of the development footprint

55.

A LEED Project is pursuing the following credits: SS Credit Places of Respite, SS Credit Site Master Plan, Building Product Disclosure and Optimization – Material Ingredients, and IEQ Prerequisite Minimum Acoustic Performance. Which of the following project BD+C adaptations does this project fall under?

a)

Hospitality

b)

New Construction

c)

Core and Shell

d)

Healthcare

e)

Schools

56.

The project team for an NC office building in Dubai is considering different innovative strategies for IN Credit Innovation. Which of the following criteria should be met for the IN Credit? (Choose 3)

a)

Strategies must demonstrate a quantitative improvement

b)

Strategies should be qualitative

c)

Strategies should be comprehensive

d)

The strategy must be significantly better than standard sustainable design practices

e)

The strategy must have been implemented in previous LEED Projects

57.

A new construction project was registered in December of 2013. In May 2014, USGBC published addenda for a credit the project team is pursuing. What statements are true regarding this project? (Choose 2)

a)

The project team can choose to follow any addenda published prior to December 2013

b)

The project team can choose to follow any addenda published after May 2014

c)

Submit a CIR for clarification

d)

The project team must follow any addenda published prior to December 2013

e)

The project team must follow any addenda published in May 2014