1.

Which of the following describes the scope of Phase 1 or Phase 2 Environmental Site Assessment?

a)

Determining the likelihood of contamination

b)

Determining the likelihood of contamination and identifying potential contaminants on the site

c)

Identifying potential contaminants on the site

d)

Remediating a site with contamination

2.

The project team designs the development footprint such that it does not overlap with the sensitive habitat area and is not within 50 feet (15 meters) of the wetland. The project team provides an impervious pedestrian pathway within the wetland buffer that meets the credit requirements. Which of the following credits might the project earn? (Choose 3)

a)

LT Credit LEED for Neighbourhood Development Location

b)

LT Credit Sensitive Land Protection

c)

SS Credit Site Development—Protect or Restore Habitat

d)

LT Credit Reduced Parking Footprint

e)

SS Credit Site Assessment

3.

A project that may achieve LT Credit High Priority Site through Option 1 Infill site may earn which of the following credits? (Choose 2)

a)

LT Credit Surrounding Density and Diverse Uses

b)

SS Credit Heat Island Reduction

c)

LT Credit Access to Quality Transit

d)

LT Credit Green Vehicles

4.

A lighting manufacturer company has decided to build their headquarters in Phoenix, Arizona. Which of the following sites should they consider to help the projects LEED Certification?

a)

Land that is 95 feet from a water body

b)

Developed site 60 feet from a fishing stream

c)

Locate the site outside any floodplain subject to a 20% or greater chance of flooding in any given year

d)

Developed land that is 41 feet from a stream

5.

A new construction project team cannot determine the number of dwelling units in the surrounding land, and hence, is using the combined density calculation. The project has a combined density of 25,000 SF per acre of buildable land. What is the minimum density needed for the project to earn two points under this credit?

a)

40,000 SF per acre of buildable land

b)

35,000 SF per acre of buildable land

c)

30,000 SF per acre of buildable land

d)

25,000 SF per acre of buildable land

6.

A healthcare project team decides to pursue LT Credit Sensitive Land Protection. The team wants to check the improvements to wetlands and water bodies that are allowable. As a LEED AP, which among the following improvements would you suggest as allowable per the credit requirements? (Choose 3)

a)

Removal of all trees

b)

Grade changes to ensure public access

c)

Grade changes to ensure private access

d)

Bicycle and Pedestrian Pathways 12 feet wide or fewer with 8 feet of impervious surface or fewer

e)

Activities to maintain or restore natural communities

7.

Correct: If part of the site is found to have contamination, then the entire area within the LEED Project Boundary is considered a contaminated site.

This also applies to Option 2 Priority Designation, a project site qualifies even if only a portion is in the high priority designated area.

a)

The project should submit a CIR

b)

At least 50% of the site must be contaminated in order to qualify as brownfield site for LT Credit High Priority Credit Option 3

c)

The entire site must be contaminated in order to qualify as brownfield site for LT Credit High Priority Credit Option 3

d)

The project qualifies for LT Credit High Priority Site Option 3

8.

A missionary centre is planning for a new school in downtown Boston. They were able to get a site which was a former landfill. What should be the project team’s next step?

a)

Locate another site since this site is ineligible for LEED Certification

b)

Remediate the site to meet local, state, or federal EPA region residential standards, whichever is more stringent

c)

Conduct a Phase II Environmental Site Assessment of the site

d)

Conduct a Phase I Environmental Site Assessment of the site

9.

A project is in the process of establishing the existence (location) and physical limits (size) of a wetland for the purposes of federal, state, and local regulations. Which of the following resources must be used for wetland delineation?

a)

NRCS

b)

U.S. Army Corps of Engineers’ Wetlands Delineation Manual

c)

US EPA

d)

Rain Forest Alliance

10.

Which of the following resources must a project use while conducting a Phase 1 or Phase 2 Environmental Site Assessment?

a)

ASTM E1527–05 and ASTM E1903–11

b)

Brownfield

c)

ASTM E1903–11

d)

U.S Army Corps of Engineer’s Manual

11.

Which among the following sites will qualify for Priority Designation under Option 2 for LT Credit High Priority Site?

a)

A Department of the Treasury Community Development Financial Institutions Fund Qualified Low-Income Community

b)

A Federal Empowerment Zone site

c)

A Federal Brownfield site

d)

A site listed by the EPA National Priorities List

e)

A Federal Renewal Community site

12.

A project located in a high density urban development chose to pursue LT Credit Reduced Parking Capacity using Case 2 – Dense and/or Transit-Served Location. The project designed its parking to achieve a 40% reduction from the base ratios. Which of the following credits must have already been earned by the project? (Choose 2)

a)

LT Credit Surrounding Density and Diverse Uses

b)

LT Credit Green Vehicles

c)

LT Credit Access to Quality Transit

d)

SS Credit Heat Island Reduction

13.

An international project is in question in determining which local laws and regulations are the most equivalent to U.S. measures in scope and rigour for LT Credit Sensitive Land Protection and is seeking a qualified ecological or biological specialist. Which of the following defines a qualified ecological or biological specialist? (Choose 3)

a)

Is a LEED Green Associate

b)

Holds a degree in biology, ecology, or a related subject

c)

Holds a LEED AP Accreditation in BD+C

d)

Understands how construction and the built environment affect ecology and can make recommendations for ecological protection, enhancement, and mitigation measures

e)

Is a practising biologist or ecologist with a minimum of three years’ experience in, for example, ecological impact assessments, habitat surveys, and habitat restoration

14.

A project team is working on a public library project in a neighbourhood of density 60,000 SF/acre. The project team wants to earn a point for community connectivity. Can the library count itself as a basic service in the calculation?

a)

Yes, because the library is located in a dense neighbourhood

b)

Yes, because the project is a library

c)

No, a project cannot consider itself a service

d)

No, because neighbourhood should have a minimum density of 65,000 SF/acre

15.

Which of the following can be no more than 1/4 mile from the functional entrance of a project? (Choose 3)

a)

Existing or planned commuter rail stations

b)

Existing or planned rideshare stops

c)

Existing or planned commuter ferry terminals

d)

Existing or planned streetcar stops

e)

Existing or planned bus stop

16.

Which of the following is true regarding brownfield remediation and LT Credit Sensitive Land Protection?

a)

Brownfield remediation activities are not considered minor improvements within the wetland and water body buffers

b)

None of the above

c)

Brownfield remediation activities are considered minor improvements within the wetland and water body buffers

d)

Brownfield remediation activities are not part of LT Credit Sensitive Land Protection but LT credit High Priority Site

17.

The project team for a new construction project in downtown Portland is analysing transit services in order to earn LT Credit Access to Quality Transit. Which of the following must be true for transit services? (Choose 4)

a)

For each qualifying transit route, only trips in one direction are counted towards the threshold

b)

For each qualifying transit route, trips in both directions are counted towards the threshold

c)

Qualifying transit routes must have paired route service or service in opposite directions

d)

Planned stops and stations may count if they are sited, funded, and under construction by the date of the certificate of occupancy and are complete within 24 months of that date

e)

Both weekday and weekend trip minimums must be met

18.

A retail project is currently analysing various sites for its new project. One of the sites the team is considering is a brownfield site where soil or groundwater contamination has been identified, and where the local and state authority requires its remediation. Which of the following must be true in order for the project to earn two points under the LT credit High Priority Site under Option 3 Brownfield Remediation?

a)

Perform remediation to the satisfaction of GBCI

b)

Perform remediation to the satisfaction of local and state authority, whichever has jurisdiction

c)

Perform remediation to the satisfaction of USGBC and GBCI

d)

Perform remediation to the satisfaction of local and state authority whichever has jurisdiction and GBCI

19.

A project located in downtown Washington, D.C is pursuing LT Credit Reduced Parking Footprint. As a LEED AP on the project, which among the following transportation demand management strategies would you recommend to successfully implement this credit?

a)

Residential units rented or sold separately from parking

b)

Telecommuting

c)

Transit subsidy

d)

Provide shuttle service between transit stops and/or commercial and residential centers

e)

All of the above

20.

Which of the following can be described as water bodies? (Choose 2)

a)

Marshes

b)

Arroyo

c)

Swamps

d)

Estuary

e)

Irrigation ditches

21.

A project team is in the process of determining location of a threatened or endangered species habitat. Which of the following resources might the team find useful?

a)

FEMA website

b)

NRCS website

c)

LEED Online

d)

NatureServe website

22.

Which of the following are the criteria for sensitive land? (Choose 2)

a)

Areas on or within 100 feet (30 meters) of a wetland, except for minor improvements

b)

Areas on or within 100 feet (30 meters) of a water body, except for minor improvements

c)

Areas on or within 50 feet (15 meters) of a wetland, except for minor improvements

d)

Areas on or within 50 feet (15 meters) of a water body, except for minor improvements

23.

Which of the following resources must a project in the U.S use while determining location of flood hazard areas?

a)

FEMA

b)

NRCS

c)

Determine the flood hazard area with a qualified professional

d)

FEMA and NRCS

24.

Which of the following water bodies do not have to meet the 50 ft setback criteria to satisfy LT Credit Sensitive Site Protection? (Choose 2)

a)

Ponds

b)

Man-made fire suppression ponds

c)

Man-made storm-water retention ponds

d)

Wetlands

e)

Streams

25.

A school project is attempting to earn LT Credit Surrounding Density and Diversity uses through Option 2 Diversity Uses. Which of the following types of spaces are not included when discussing diverse uses on a school project? (Choose 3)

a)

Playing Fields

b)

Physical Education Spaces that are part of the project site

c)

Bicycle Parking Area

d)

Concession Stands

e)

Parking Area for Low-e vehicles

26.

For a new construction project of an administrative building, a previously graded site in a suburban area has been chosen as the project site. It is planned to restore 10% of the total site area. The open space for the site will exceed the local zoning requirements by 10%. 50% of the sidewalk will be shaded within five years. The building area is located within a 100 year flood plain. Based on this information alone, what credit could this project earn?

a)

SS Credit – Heat Island Reduction

b)

LT Credit – Sensitive Land Protection

c)

LT Credit – Reduced Parking Footprint

d)

LT Credit – High Priority Site

e)

SS Credit – Site Development – Protect of Restore Habitat

27.

A project pursuing LT Credit Sensitive Land Protection is considering removing trees under 40% condition rating. The condition rating must be based on which of the following?

a)

Species or ecological communities classified by NatureServe as GH (possibly extinct)

b)

U.S. Endangered Species Act or the state’s Endangered Species Act

c)

An assessment by an arborist certified by NatureServe

d)

An assessment by an arborist certified by the International Society of Arboriculture (ISA) using ISA standard measures, or local equivalent for projects outside the U.S.

28.

It is necessary to consult the U.S. Code of Federal Regulations (CFR) to check if the site meets which of the following criteria? (Choose 2)

a)

Habitat of endangered species

b)

Prime farmland

c)

Wetland

d)

Brownfield

29.

A Warehouse/ Distribution Centre project is attempting to earn LT Credit Surrounding Density and Diversity Uses. Which among the following should be true for the project to earn two points? (Choose 3)

a)

Project is within a 15 mile driving distance of a seaport

b)

Project is within a 10 mile driving distance of an airport

c)

The site is within a 1 mile driving distance of an on/off ramp to a highway

d)

The site is within a 1 mile driving distance of an access point to an active freight rail line

30.

A school project has surrounding existing density (combined) of 35,000 Square Feet per acre of buildable land within a 1/4 mile (400-meter) radius of the project boundary. The school was built on a previously developed site and is located near one commuter rail line. Based on this information alone, what credits could this project earn? (Choose 2)

a)

o    LT Credit Sensitive Land Protection

b)

LT Credit Surrounding Density & Diverse Uses

c)

LT Credit – Access to Quality Transit

d)

SS Credit Open Space

e)

o    LT Credit – High Priority Site

31.

Which of the following should a project team consult when working on restoring a habitat under the LT Credit Sensitive Land Protection? (Choose 2)

a)

USDA

b)

   NatureServe

c)

   US Endangered Species List

d)

International Society of Arboriculture (ISA)

32.

A BD+C Project (Core and Shell) Brownfield site is pursuing LT Credit High Priority Site. What is the maximum number of points that the project can earn for this credit including exemplary points?

a)

2

b)

3

c)

5

d)

4

e)

1

33.

A project team for a project outside the U.S wants to research and analyse endangered species or protected habitats to determine what imperilled species might occur in the area. Which of the following should the project engage in? (Choose 2)

a)

Utilize U.S. fish and wildlife agency or Natural Heritage Program

b)

Utilize International Union for Conservation of Nature Red List

c)

All of the above

d)

Engage a qualified local biologist or ecologist to conduct a biological survey

34.

A software company is building a new office project in Toronto, Canada. The project team has identified previously developed land. The proposed development footprint extends to land that has not been previously developed plain. Based on this information alone, what else needs to be done to earn LT Credit Sensitive Land Protection? (Choose 4)

a)

The project should determine location of high-priority site

b)

    The project should determine location of prime farmland

c)

The project should determine location of flood hazard areas

d)

The project should determine location of threatened or endangered species habitat

e)

The project should determine location of wetlands and water bodies

35.

A project is pursuing SS credit Reduced Parking Foot Print. In addition, if the project reduced the building foot print, which other credits might this help?

a)

LT Credit High-Priority Site

b)

LT Credit Surrounding Density and Diverse Uses

c)

LT Credit Access to Quality Transit

d)

LT Credit Sensitive Land Protection

36.

A BD+C project team determines that an adjacent wetland extends across the project boundary and also finds a small habitat area for an endangered species within the project boundary. Which of the following improvements within the wetland and water body buffers are considered minor and may be undertaken to enhance appreciation of them? (Choose 3)

a)

Plan two single-story structure per 300 linear feet (90 linear meters)

b)

Grade changes necessary to ensure public access

c)

Engage activities to maintain or restore native natural communities and/or natural hydrology

d)

600 square feet clearing

e)

o    The projects plans on bicycle and pedestrian pathways that are 11 feet wide (3.5 meters), of which 6 feet (2.5 meters) is impervious

37.

Which of the following credits if attempted a project is ineligible to attempt any other credits under that category?

a)

LT Credit LEED for Neighbourhood Development Location

b)

LT Credit Surrounding Density and Diverse Uses

c)

LT Credit Sensitive Land Protection

d)

LT Credit High Priority Site

e)

LT Credit Reduced Parking Footprint

38.

A new construction project is served by multiple transit types (bus, streetcar, rail, or ferry). Which of the following are minimum transit frequency requirements? (Choose 2)

a)

Have 144 week day multiple transit trips

b)

Have 36 weekend multiple transit trips

c)

Have 40 weekend multiple transit trips

d)

Have 72 week day multiple transit trips

e)

Have 80 weekend multiple transit trips

39.

What is the requirement for a courthouse project location to earn LT Access to Quality Transit? (Choose 2)

a)

Within a 1/2 mile walking distance of existing or planned bus rapid transit stops, light or heavy rail stations, commuter rail stations, or commuter ferry terminals

b)

   Within a 1/4 mile walking distance of existing or planned bus rapid transit stops, light or heavy rail stations, commuter rail stations, or commuter ferry terminals

c)

It should be located within a 1/2 mile walking distance of existing or planned bus, streetcar, or rideshare stops

d)

It should be located within a 1/4 mile walking distance of existing or planned bus, streetcar, or rideshare stops

40.

A project is pursuing LT Credit Surrounding Density and Diverse Uses and LT Credit Access to Quality Transit. Which of the following must the project do to earn LT Credit Reduced Parking Foot Print?

a)

Project should further reduce parking to achieve LT Credit Reduced Parking Foot Print

b)

Project is likely to achieve LT Credit Reduced Parking Foot Print without doing anything

c)

The project cannot achieve LT Credit Reduced Parking Foot Print

d)

The project should allocate preferred parking spots to earn LT Credit Reduced Parking Foot Print

41.

Which of the following must be true for a site without legally adopted flood hazard maps or legal designations?

a)

The project should be located on a site that is entirely outside any floodplain subject to a 1% or greater chance of flooding in any given year.

b)

o    The project should be located on a site that is entirely outside any floodplain subject to a 5% or greater chance of flooding in any given year.

c)

o    The project should be located on a site that is entirely outside any floodplain subject to a 10% or greater chance of flooding in any given year.

d)

The project should consult local authority and build on a safe spot

42.

Which of the following sites would help a new construction project, that has a building area of 42,135 SF, achieve LT Credit Surrounding Density and Diversity Uses?

a)

Site surrounded by a variety of residential, non-residential, and mixed use buildings within a 1/4 mile radius of the project boundary – Residential density of 12 DU/acre and Non-residential density of .59 FAR

b)

o    Site surrounded by a variety of residential, non-residential, and mixed use buildings within a 1/4 mile radius of the project boundary

c)

Site surrounded by a variety of residential, non-residential, and mixed use buildings within a 1/4 mile radius of the project boundary – Residential density of 7 DU/acre and Non-residential density of .4 FAR

d)

Site surrounded by a variety of residential, non-residential, and mixed use buildings within a 1/4 mile radius of the project boundary – Residential density of 4 DU/acre and Non-residential density of .5 FAR

43.

A project team has successfully implemented LT Credit Sensitive Land Protection using Option 2. Which of the following documentation requirements should be satisfied to earn the credit?

a)

Photographs of the site

b)

Description of how the project team verified prime farmland and sensitive habit criteria

c)

Explanation of the previous development on the site

d)

The site plan

44.

A warehouse project is pursuing Option 2- Reduced Truck Idling to earn LT Credit Green Vehicles. The project must do which of the following to earn LT Credit Green Vehicles using Option 2?

a)

Provide an electrical connection for at least 100% of all dock door locations to limit truck idling at the dock

b)

  Provide an electrical connection for at least 50% of all dock door locations to limit truck idling at the dock.

c)

Provide an on-site fleet with at least one yard tractor that is powered by electricity, propane, or natural gas

d)

Provide on-site charging or refuelling stations for the vehicles

45.

A project pursuing LT Credit Sensitive Land Protection using Option 2 has decided to leave the previously undeveloped land on the project undisturbed. Which of the following credits may the project earn by doing this? (Choose 2)

a)

LT Credit High Priority Site

b)

Location and Transportation Credit Green Vehicles

c)

SS Credit Site Development – Protect or Restore Habitat

d)

SS Credit Rainwater Management

46.

A project team is trying to earn LT Credit Surrounding Density and Diversity Uses for their new administrative building project. Which of the following factors should be considered for the credit compliance?

a)

Development Density  

b)

Density Radius

c)

Driving Distance

d)

Walking Distance

47.

Which of the following should a project team located in the U.S consult while determining location of wetlands and water bodies under LT Credit Sensitive Land Protection?

a)

  NRCS Soil Survey

b)

U.S. Code of Federal Regulations

c)

U.S. Army Corps of Engineers’ Wetlands Delineation Manual

d)

U.S. Natural Heritage Program or the state wildlife agency

48.

A project team is trying to locate a site that complies with LT Credit – Surrounding Density and Diversity Uses – Option 2 for their new administrative building. Which site should they select?

a)

A site such that the building’s main entrance is within a 1/2 mile walking distance of the main entrance of at least seven operational and publicly accessible uses

b)

A site within 1/4 mile of two different metro bus lines

c)

  A previously developed site with a project density and surrounding development density of 60,000 SF/acre net

d)

   A previously developed site within 1/2 mile of a residential area with an average density of 10 units per acre net

49.

A project achieves 20% reduction in parking as compared to base ratio. As part of many transportation management strategies, the project provided shuttle service between transit stops and/or commercial and residential centres. Which among the following credits might benefit by providing shuttles besides LT Credit Reduced Parking Footprint?

a)

LT Credit Surrounding Density and Diverse Uses

b)

LT Credit Access to Quality Transit

c)

None

d)

  LT Credit High Priority Site

50.

A BD+C Project (Core and Shell) team determines the number of dwelling units in the surrounding land as 10 and Non-residential Density (FAR) as .5. The project has a combined density of 25,000 SF per acre of buildable land. How many points would the project earn for LT credit Surrounding Density and Diversity Uses?

a)

4

b)

 3

c)

2

d)

1

51.

A LEED New Construction Project in Austin is planning to locate the project within the boundary of a development certified under LEED for Neighbourhood Development (ND) (Certified Plan or Certified Project under the LEED v4 rating system). The total number of points the project in Austin can earn under LT Credit LEED for Neighbourhood Development Location depends on which of the following?

a)

o    The certification level that the LEED ND Project plans to achieve or has already achieved

b)

The certification level of the parent LEED ND Project

c)

The number of LT Credits the project attempts

d)

The number of LT Credits the project has achieved

52.

In addition to reducing parking capacity, projects should provide preferred parking for carpools for 5% of the total parking spaces after reductions are made from the base ratios. Preferred parking is not required if no off-street parking is provided.

a)

The project should add five more spaces for preferred parking for carpool

b)

The project should reduce parking capacity by 40% as compared to base ratio

c)

The project need not do any thing to earn the credit. The project already qualifies for the credit

d)

The project should add ten more spaces for preferred parking for carpool

53.

A residential project with one hundred regular occupants and fifty units is planning bicycle storage spaces as part of meeting the requirement for LT Credit Bicycle Facilities. What is the minimum number of long term bicycle storage spaces that the project should provide in order to earn the credit?

a)

25

b)

50

c)

30

d)

100

54.

Which of the following must a project do in addition to providing 5% preferred parking for LT Credit Green vehicles to meet the requirements for LEED LT Credit Green Vehicles?

a)

Install electrical vehicle supply equipment (EVSE) in 5% of all parking spaces used by the project

b)

Install electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project

c)

Install battery switching station for at least 5% of all parking spaces

d)

Install liquid or gas alternative fuelling facilities for at least 5% of all parking spacesInstall liquid or gas alternative fuelling facilities for at least 5% of all parking spaces

55.

A school project is providing 5% preferred parking for green vehicles. The project is also installing electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project to earn LT Credit Green Vehicles. In addition, the project must do which of the following to earn LT Credit Green Vehicles?

a)

Develop and implement a plan for every bus serving the school to meet emissions standards per credit requirements within seven years of the building certificate of occupancy

b)

Develop and implement a plan for 100% of all other (non-bus) vehicles owned or leased to serve the school to begreen vehicles

c)

Develop and implement a plan for every bus serving the school to meet emissions standards per credit requirements within five years of the building certificate of occupancy

d)

Nothing

56.

A LEED Project Building in downtown Houston has fifty regular occupants and an average of ten visitors per day. The projects ability to earn LT Credit Bicycle Facilities is best reflected in which of the following statements? (Choose 4)

a)

Bicycle storage is within a 200 yard walking distance or bicycling distance from a bicycle network that connects to at least ten diverse uses

b)

Bicycle storage is within a 200 yard walking distance or bicycling distance from a bicycle network that connects to at least seven diverse uses

c)

Provide one on-site shower with changing facility

d)

 Bicycle storage is within a 200 yard walking distance or bicycling distance from a bicycle network that connects to a bus rapid transit stop, light or heavy rail station, commuter rail station, or ferry terminal

e)

Provide four storage spaces each for short-term and long-term bicycle storage.

57.

A healthcare project is attempting LT Credit Sensitive Land Protection. How many points must the project earn for pursuing the LT Credit Sensitive Land Protection?

a)

Zero – The project is required to earn this credit

b)

Zero – The Project is not required to earn this credit

c)

Two Points

d)

One Point

58.

Which of the following qualifies a vehicle as Green Vehicle for to meet the requirements for LEED LT Credit Green Vehicles?

a)

 Green vehicles must achieve a minimum green score of 45 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide

b)

Green vehicles must achieve a minimum green score of 65 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide

c)

Green vehicles must achieve a minimum green score of 95 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide

d)

A discounted parking rate of at least 20% for green vehicles that achieve a minimum green score of 35 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide

59.

A LEED CS Project was able to locate its site within the boundary of a development certified platinum under LEED for Neighbourhood Development. Which of the following should be submitted for credit documentation? (Choose 2)

a)

The LEED ND Project Access ID Number

b)

Vicinity base map with LEED Project Boundary and LEED ND Certified Neighbourhood or plan boundary

c)

Vicinity base map with LEED Project Boundary

d)

LEED ND Project Information (name, ID number, rating system and version, certification level, and certification date)

60.

Which of the following is true for a BD+C Project attempting LT Credit Quality Transit Access if an existing transit service is temporarily rerouted outside the required distances for less than two years?

a)

None of the above

b)

The project may not meet the requirements even if the local transit agency has committed to restoring the routes with service

c)

The project may meet the requirements, provided the local transit agency has committed to restoring the routes with service at or above the prior level

d)

The project will earn the requirements irrespective of what the local authority commits

Incorrect

61.

The Location and Transportation Category encourages which of the following projects? (Choose 4)

a)

Compact Development

b)

Storm-water Management

c)

Brownfield Remediation

d)

Alternative Transportation

e)

Connection to basic amenities or diversity uses

62.

A healthcare project has successfully met all the requirements for LT Credit Access to Quality Transit. Which among the following must be collected in order for credit documentation via LEED Online? (Choose 4)

a)

o    If applicable, documentation of planned transit or restoration of temporarily rerouted service

b)

Map showing project, project boundary, transit stop locations, and walking routes and distances to those stops

c)

Total weekday trips

d)

Timetables or other service level documentation

e)

Total weekday trips and average weekend trips

63.

All of the following are part of the intent of LT Credit Sensitive Land Protection except: (Choose 2)

a)

To conserve existing natural areas

b)

To avoid the development of environmentally sensitive lands

c)

To restore damaged areas to provide habitat and promote biodiversity

d)

To reduce the environmental impact from the location of a building on a site

64.

Which of the following is true for the Bicycle network requirement for LT Credit Bicycle Facilities?

a)

Planned bicycle trails or lanes may be counted if they are fully funded by the date of the certificate of occupancy and are scheduled for completion within one year of that date

b)

Planned bicycle trails or lanes may be counted if they are fully funded by the date of the certificate of occupancy and are scheduled for completion within 24 months or 2 years of that date

c)

Planned bicycle trails or lanes may be counted if they are scheduled for completion within one year of that date

d)

All of the Above

65.

A project located in downtown Seattle is pursuing LT Credit Reduced Parking Footprint. The project was able to reduce parking capacity by 40%, since the project would earn one point under LT Credit Access to Quality Transit in addition to providing 5% preferred parking for carpools. As a LEED AP on the project, which among the following measures are required to document the credit via LEED Online? (Choose 3)

a)

Documentation showing compliance of LT Credit Access to Quality Transit

b)

Calculations demonstrating threshold achievement

c)

Drawings or photographs of signage or pavement markings indicating reserved status of preferred parking areas

d)

Site plan indicating parking areas and preferred parking spaces

e)

Vicinity Map of the Project Showing Public Transportation Access

66.

Which of the following can help a BD+C Project earn an additional point for LT Credit Access to Quality Transit? (Choose 2)

a)

o    No one route provides more than 60% of the documented levels

b)

No one route provides more than 50% of the documented levels

c)

Project should be served by two or more transit types

d)

Project should be served by two or more transit routes

e)

No one route provides more than 40% of the documented levels

67.

The project team for a community centre project is analysing various sites for LT Credit High Priority Site under Option 1 – Historic District. Which of the following must be true for the site in order to qualify for Option 1 – Historic District?

a)

Project Site should be within a historic district

b)

Project Site should be on an infill location

c)

Project Site should be on an infill location in a historic district

d)

Project Site should be on an infill location outside a historic district

e)

Project Site should be not on an infill location and outside a historic district

68.

A LEED CS Project was able to locate its site within the boundary of a development certified platinum under LEED for Neighbourhood Development. However, the project was unable to provide a vicinity plan showing the LEED ND Project Boundary. Which of the following information might help the project complete the LEED Online form to complete the credit documentation?

a)

The project is not eligible to earn this credit

b)

The certification level of the parent LEED ND Project

c)

A licensed professional exception certificate

d)

o    A narrative describing the circumstances limiting the project team’s ability to provide the vicinity plan if the plan is not available

69.

A LEED School Project in New Hampshire has one hundred regular occupants, excluding students. Which of the following must be true to earn the LT Credit Bicycle Facilities? (Choose 4)

a)

Provide one on-site shower with changing facility

b)

Bicycle storage is within a 200 yard walking distance or bicycling distance from a bicycle network that connects to at least ten diverse uses

c)

Bicycle storage is within a 200 yard walking distance or bicycling distance from a bicycle network that connects to at least seven diverse uses

d)

Provide five storage spaces long-term bicycle storage

e)

o     Provide dedicated bicycle lanes that extend at least to the end of the school property with no barriers (e.g., fences) on school property

70.

A school project is pursuing Option 2 – green buses and school owned vehicles to earn LT Credit Green Vehicles. The project must do which of the following to earn LT Credit Green Vehicles using Option 2?

a)

Develop and implement a plan for every bus serving the school to meet emissions standards per credit requirements within five years of the building certificate of occupancy

b)

Develop and implement a plan for every bus serving the school to meet emissions standards per credit requirements within seven years of the building certificate of occupancy

c)

Develop and implement a plan for 50% of all other (non-bus) vehicles owned or leased to serve the school to be green vehicles

d)

Develop and implement a plan for 100% of all other (non-bus) vehicles owned or leased to serve the school to be green vehicles

71.

An office project has three hundred parking spaces. What are the required number of preferred parkingspaces and fuel stations that the project should provide earn LT Credit Green Vehicles using Option 1?

a)

Thirty Preferred Parking Spaces and six fuelling stations

b)

Fifteen Preferred Parking Spaces and three fuelling stations

c)

Fifteen Preferred Parking Spaces and six fuelling stations

d)

Twenty Preferred Parking Spaces and ten fuelling stations

72.

A Core and Shell Project is served by projects with commuter rail or ferry service only. Which of the following are minimum transit frequency requirements to earn one point? (Choose 2)

a)

Have 40 week day multiple transit trips

b)

Have 6 weekend multiple transit trips

c)

Have 12 weekend multiple transit trips

d)

Have 40 weekend multiple transit trips

e)

Have 24 week day multiple transit trips

73.

A LEED project building with 200 FTE occupants is in a previously developed site. All the parking will be under cover. The project location will be within 1/4 mile (400 meter) walking distance of existing or planned bus, streetcar, or rideshare stops. In addition, the project will have thirty bike storage spaces and achieve a 40% reduction in parking capacity as compared to base ratio and provide 5% preferred parking for carpools. Based on this information alone, what credit can this project achieve? (Choose 2)

a)

LT Credit Access to Quality Transit

b)

LT Credit Bicycle Facilities

c)

LT Credit Reduced Parking Footprint

d)

SS Credit – Heat Island Effect – Non-roof

e)

LT Credit Sensitive Land Protection

74.

A project is unable to designate 5% of all parking spaces used by the project as preferred parking for green vehicles. Which of the following is an acceptable substitute for preferred parking spaces?

a)

A discounted parking rate of at least 20% for green vehicles

b)

A discounted parking rate of at least 30% for green vehicles

c)

A discounted parking rate of at least 20% for green vehicles – permanently available to every qualifying vehicle.

d)

A discounted parking rate of at least 30% for green vehicles – permanently available to every qualifying vehicle.

75.

A project is providing 5% preferred parking for green vehicles. The project is also installing ESVE. Which of the following is true about installing electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project to earn LT Credit Green Vehicles? (Choose 3)

a)

EVSE parking spaces must be provided in addition to preferred parking spaces for green vehicles.

b)

ESVE must be networked or internet addressable and be capable of participating in a demand-response program

c)

Provide a Level 1 charging capacity

d)

Provide a Level 2 charging capacity (208 – 240 volts) or greater

76.

A BD+C Project qualifies for one or more points under LT Credit Surrounding Density and Diverse or LT Credit Access to Quality Transit. During one of the design meetings, the project team decided to minimize the building footprint and, as a result, they added underground parking thereby achieving 20% reduction below the base ratios recommended by the Parking Consultants Council. This decision can earn the project which credit?

a)

None of the above

b)

LT Credit High Priority Site

c)

LT Credit Sensitive Land Protection

d)

LT Credit Bicycle Facilities

e)

LT Credit Reduced Parking Footprint

77.

Which of the following improvements with respect to tree removal is considered minor for LT credit Sensitive Land Protection? (Choose 3)

a)

Trees under 40% condition rating

b)

Up to 20% of trees more than 6 inches (150 millimeters) diameter at breast height with a condition rating of 40% or higher.

c)

Trees greater than 6 inches (150 millimeters) diameter at breast height

d)

Hazardous trees, up to 75% of dead trees

e)

Removal of hazardous trees and tress greater than 6″ diameter at breast height