Integrative Strategies | LEED Green Associate

Total questions: 36

Worksheet time: 23mins

Name
Class
Date
1.

A LEED NC Project is pursuing Credit Integrative Process. As part of discovery phase of energy related research, which of the following elements should the team not include?

a)

Local climate

b)

Site conditions

c)

Potential building features

d)

Local Rainfall data

2.

Reducing external light pollution will result in synergies between what LEED Credit Categories? (Choose 2)

a)

Energy and Atmosphere

b)

Sustainable Sites

c)

Indoor Environmental Quality

d)

Innovation

3.

Which of the following factors is a fundamental evaluation criterion for the prerequisite Integrative Project Planning and Design?

a)

Sensitive Land

b)

Human health

c)

Strategies that have bigger impact on project energy usage

d)

Cost-effective adoption of green design and construction strategies

4.

Reducing the heat island effect by installing paving materials with a high SRI can have an impact on credits in what LEED Categories? (Choose 2)

a)

Indoor Environmental Quality

b)

Sustainable Sites

c)

Materials and Resources

d)

Water Efficiency

e)

Energy and Atmosphere

5.

A project in Phoenix, Arizona is required to conduct a four hour integrated design charrette to optimize the integration of green strategies. Which of the following rating systems suits for the project?

a)

LEED BD+C: New Construction

b)

LEED BD+C: Healthcare

c)

LEED BD+C: Homes

d)

LEED BD+C: Schools

6.

Designing a building with a natural ventilation system will impact what credit categories? (Choose 2)

a)

Indoor Environmental Quality

b)

Energy and Atmosphere

c)

Sustainable Sites

d)

Materials and Resources

7.

The project team is identifying at least one on-site, non-potable water source that could be used to offset water demand. Which of the following credits are they working on?

a)

We Credit Indoor Water Use Reduction

b)

WE Prerequisite Outdoor Water Use Reduction

c)

Integrative Process

d)

WE Prerequisite Indoor Water Use Reduction

8.

Which of the following must be true for a health care project to earn LEED Certification?

a)

The project should earn a minimum of forty points

b)

The project should develop a health mission statement and incorporate it in the Owner’s Project Requirements

c)

The project should comply with Integrative Project Planning and Design

d)

The project should earn Integrative Process Credit

9.

A project team is removing cisterns from a project design and will install a green roof instead. What project area would this change impact? (Choose 2)

a)

On-site Renewable Energy

b)

Rainwater Management

c)

Heat Island Reduction

d)

Construction Waste Management

10.

A project team has completed all the steps required to meet the Integrative Process credit. Which of the following describes their last step to successfully document the credit?

a)

Energy and Water Analysis Reports

b)

Water Budget Analysis

c)

Energy Modelling Reports

d)

Integrative Process worksheet (energy and water analysis tabs)

11.

Which of the following documents outline the owner’s vision about the project?

a)

OPR

b)

BOD

c)

Project Specifications

d)

Design Documents

12.

The owner’s representative is identifying team members for the integrative design team. How many members should he identify at a minimum?

a)

Seven more

b)

Four more

c)

Five more

d)

   Three more

13.

Which of the following data should be collected as part of discovery – preliminary data collection? (Choose 3)

a)

Indoor Water Demand

b)

Microclimate, utility providers, and potential financial incentives

c)

Location (distance from site), capacity, and type and level of treatment for the sewage system serving the site

d)

Location, capacity, and type of water sources serving the site, such as reservoirs, aquifers, wells, lakes,etc.

e)

Outdoor Water demand

14.

A project team has decided to modify a low SRI roof design to include a vegetated roof to help with rainwater management. What other credit would this decision help with?

a)

Green Power

b)

Recycled Materials

c)

Water Use Reduction

d)

Heat Island Reduction

15.

Which of the following elements should be part of the health mission statement? (Choose 3)

a)

Triple bottom line values

b)

Health of building occupants

c)

Collaboration with neighbouring buildings

d)

LEED Scorecard

e)

Local community and global environment

16.

Which of the following is the most important phase of the integrative process?

a)

Construction

b)

Implementation Phase

c)

Discovery Phase

d)

Detailed Design Phase

17.

A Healthcare project in Houston is assembling an integrative design team. Who among the following must be included in the integrative design team apart from the Owner, Designer and Builder? (Choose 2)

a)

Landscape Architect

b)

Healthcare equipment vendor

c)

Healthcare Facility Staff

d)

Construction Manager

e)

Project Manager

18.

The use of open grid pavement can help a project achieve points in what LEED areas? (Choose 2)

a)

Rainwater Management

b)

Surrounding Density and Diverse Uses

c)

Indoor Water Use Reduction

d)

Heat Island Reduction

19.

Which of the following factors are taken into account while performing a water budget under Discovery Phase – Water Related Systems? (Choose 3)

a)

The on-site supply sources

b)

Understand Demand Response

c)

Metering Indoor and Outdoor water

d)

Indoor & Outdoor Water Demand

e)

Process Water Demand

20.

Which of the following should a project team do to meet the requirements of IP Prerequisite Integrative Project Planning & Design? (Choose 3)

a)

Assemble an integrated project team

b)

Create LEED Project Budget

c)

Create Preliminary Rating Goals

d)

Assemble an integrated project team with minimum of four stakeholders apart from project owner and conduct a design charrette

e)

Develop a health mission statement and incorporate it in the Owners Project Requirements (OPR)

21.

Where does integrative process fall within the life cycle of a LEED project?

a)

Construction

b)

Throughout the life cycle of the project

c)

Design

d)

Pre-design

22.

How long should an integrative charette be for a healthcare project?

a)

Six hours

b)

Two hours

c)

Four hours

d)

No minimum requirement

23.

A project team in Seattle, Washington is having an integrative design charrette for a new hospital to discuss the budget, schedule, and functional programmatic requirements as required for IP Prerequisite Integrative Project Planning and Design. Which of the following reference documents will assist the project team in this regard?

a)

ANSI Consensus National Standard Guide 2.0 for Design and Construction of Sustainable Buildings and Communities

b)

ANSI/ASHRAE/IESNA Standard 90.1–2010

c)

International Standard ISO 14040–2006, Environmental management

d)

USGBC LEED BD+C Reference Guide

24.

Which of the following are benefits of collaboration on a LEED Project? (Choose 3)

a)

Increase scope of work

b)

LEED Platinum certification

c)

Reduce Costs

d)

Map the process with milestones

e)

Use resources efficiently

25.

Which of the following defines an iterative process?

a)

An interdisciplinary method for the design and operation of sustainable build environments.

b)

A process based on repetition of steps and procedures

c)

Total amount of energy used to harvest or extract, manufacture, transport, install, and use a product across its life cycle

d)

The built environment is understood as a series of relationships in which each part affects many other parts

e)

An intensive workshop in which various stakeholders and experts are brought together to address a particular design issue.

26.

An energy modeller is assisting a project team with performing a simple box energy model in order to meet the requirements of Integrative Process Credit. Which of the following documents should be referred to engage this initial early research and analysis?

a)

ASHRAE 55

b)

ASHRAE 90.1.2010 Appendix G

c)

ANSI Consensus National Standard Guide 2.0for Design and Construction of Sustainable Buildings and Communities

d)

ASHRAE AEDG

27.

A healthcare project integrative design has developed a health mission statement and incorporated it in the OPR. Which of the following must the health mission statement address? (Choose 3)

a)

The local community

b)

LEED Registration Details

c)

LEED Credits to meet the targeted certification level

d)

Health of building occupants

e)

The global environment

28.

A project that uses 100% green power can earn credit in what LEED Categories? (Choose 2)

a)

Sustainable Sites

b)

Innovation

c)

Energy and Atmosphere

d)

Water Efficiency

29.

What is Prius Effect?

a)

Self-reinforcing loops in which a stimulus causes an effect and the loop produces more of that effect.

b)

Central heating/cooling system that pumps heat to or from the ground

c)

Delivering real time energy information by installing meters

d)

Increase in air temperature in a developed area compared with an undeveloped area

30.

How does the analyses from the integrative process credit assist projects?

a)

The analyses inform the owners project requirements (OPR), and basis of design or BOD

b)

 The analyses inform the owners project requirements (OPR), basis of design or BOD, design documents, and construction documents

c)

The analyses assist team members get a good grasp of project scope, budget and goals

d)

The analyses inform design documents, and construction documents

31.

Which of the following documents are prepared by designers to address Owner’s Project Requirements?

a)

Design Documents

b)

Project Specifications

c)

BOD

d)

OPR

32.

Which of the following should a project team do with respect to discovery phase for water systems

a)

Identify at least one on-site non-potable water source that could supply a portion of at least 4 demand components

b)

Identify at least two on-site non-potable water source that could supply a portion of at least two demand components

c)

Identify at least one on-site non-potable water source that could supply a portion of at least two demand components

d)

Identify at least two on-site non-potable water source that could supply a portion of at least 4 demand components

33.

Including which of the following project team members into MR Prerequisite Construction and Demolition Waste Management Planning early in the design phase will help later with earning the related credit MR Credit Construction and Demolition Waste Management?

a)

Facility Manager

b)

Occupants

c)

Waste Manager

d)

Owner

e)

Contractor

34.

In the integrative process, when is energy systems researched and analysed in comparison with water related systems?

a)

Water Systems are researched first

b)

The energy and water systems should be analysed at the same time.

c)

There is no particular order, the LEED Project Team may decide

d)

Water Systems are researched and analysed first

e)

Energy Systems are researched and analysed first

35.

Which of the following documents is helpful for a contractor to understand LEED scope, owner’s project requirements and his/her responsibilities and deliverables?

a)

OPR

b)

BOD

c)

Project Specifications

d)

Design Documents

36.

 Collecting and using rainwater to replace potable water use in flush fixtures helps with what project areas? (Choose 2)

a)

Rainwater management

b)

Reducing heat islands

c)

Water use reduction

d)

Reducing the development footprint