A percentage of his fee an architect is entitled to receive when the owner fails to implement the plans and documents for construction as prepared by the architect is:
50%
85%
90%
One of the activities that fall under post construction services is:
promotional services
building and equipment maintenance
contract document phase
The amount paid by the contractor to the owner for every day of delay in construction time is known as:
Liquidated damages
Credit memo
contract document phase
Specifications are part of the:
Schematic design
contract documents
General conditions
special provisions
An outline specifications enumerating the type or trade names of materials to be used is known as:
Supplementary specifications
Schedule of materials and finishes
Special provisions
Instruction to contractor
What percentage of an architect’s work is liability under the civil code?
5%
15%
10%
20%
The fee of the architect for design build services on a guaranteed maximum cost aside from his fee for regular design service is:
5%
10%
7%
20%
Additional information on contract documents issued to bidders before date of bidding is:
Proposal
Bid bulletin
Instruction to bidders
Specifications
A complaint for unethical and unprofessional conduct of architects is brought before.
Bldg. Official
Court
PRC
Board of Architecture
Specialized Allied Services include:
Interior design
Economic feasibility
Pre-design
Market study