______involves management activities over and above the normal architectural and engineering (A&E) services carried out during the pre-design, design, and construction phase.
project risk
project process
project management
lump sum
During the progress of work, the Owner shall furnish the Architect with a copy of the records of expenses being incurred on the construction
% Of Construction cost
Cost record
Project construction cost
professional fee
If the Owner continuously makes changes, what method of compensation should the Architect employ?
Cost Method
Lump-Sum
Percentage of Construction Cost
referred to as the means the cost of the completed building to the Owner, including the structure, plumbing/sanitary and electrical fixtures and etc.
Multiple of Direct Personnel Expenses
Professional Fee Plus Expenses
Project construction cost
Lump Sum or Fixed Fee
Percentage fee if the Owner gets all Contract Documents.
75%
85%
100%
90%
____shall refer only to an RLA who may also be a separately Registered and Licensed Professional (RLP).
design-build
construction manager (CM)
Term consulting architect
Mixed method of compensation
Architects in business are usually involved in?
Design-build
teaching
real statement development
design consultancy
How is the Architect remunerated for basic services?
Percent of construction cost
Multiple of Direct Personnel Expenses
Professional Fee Plus Expenses
Lump-Sum or Fixed Fee
The SPP provides for more than one method of compensation on a project.
Mixed method of compensation
Lump-Sum or Fixed Fee
Per Diem, Honorarium Plus Reimbursable Expenses
Professional Fee Plus Expenses
_______responsible to the Owner only for administrative matters.
Construction supervision group (CSG)
Construction Phase
Coordination and Supervision
Construction manager