How do you compensate a "project-hire" Painter?
Per Hour
Per Day
Per Square Meter
Lump Sum
How much is the Architect compensated after he completed all plans and documents for construction?
65%
75%
80%
90%
Under specialized services, what involves the detailed planning and design control sound transmission for compatibility with the architectural design concept?
Architectural Interior
Acoustic Interior
Acoustic Design Services
Electrical and Sound System
Who approves the PERT CPM Chart
Owner
Architect
Project Engineer
Contractor
What is the preferred design for a stair considering users of crutches?
Slanted Nosing
Projected Nosing
Open Riser Stairs
Right Angle Stairs
What is the preferable height of lighting switches?
1.50m
0.90m
1.20m to 1.30m
1.30 to 1.40m
Height for convenience outlet
0.30m
0.20m
0.40m
0.50m
As per BP 220, Minor roads shall have a minimum RROW of
5.00m
5.50m
6.00m
6.50m
Under BP 220, cul-de-sac shall have a max length of
80.00m
100.00m
120.00m
150.00m
Under PD 957, open market and medium cost subdivision having 1,500 lots is required to have the following except:
Multi-Purpose Hall
Convenience Store
Tricycle Terminal
High School
To get a replacement of PRC ID, you need to pay Php 250.00 and present your________?
Special Power of Attorney
4 pcs. 2 x 2 picture
Affidavit of Loss
Community Tax Certificate
What is the common penalty for delays in time completion of project, which is usually provided for in an Owner-Contractor Agreement?
1/30 of 1% of contract price for every day of delay
1/10 of 1% of contract price for every day of delay
1% of contract price per day of delay
10% of contract price
In RA 9266, it refers to an actor behavior that gravely violates the sentiment or accepted standards of the community?
Moral authority
Moral behavior
Moral turpitude
NOTA
What is the maximum height of water fountain
0.75m
0.80m
0.85m
0.90m
A releasing device installed in Fire Exit Doors that causes the door latch to open the door in the direction of exit travel once a force of no more than seven kilograms is applied
Self-Closing Device
Fire Door Closer
Panic Bar
Auto-Release Lock
For a 3-storey structure or less, the exit enclosure shall be protected by a separation with a Fire resistance rating of
1 hr
1.50 hrs
2.00 hrs
4 hrs
A 6" filled CHB wall has a fire rating of
1 hr
2 hrs
3 hrs
4 hrs
What do you call the space in another building provided just after a horizontal exit on approximately the same level
Fire Lane
Egress
Area of refugee
Safety Exit
What agency has jurisdiction over the quality of effluent from septic tanks
DENR
Local Gov't
DOH
CENRO
How long is the validity of a Special/Temporary Permit given to Foreign Architects?
One Year
Two Years
Co-terminus with the Project
Depends on the permit applied for
Wrote the virtues of an architect?
Le Corbusier
Marcus Vitruvius Pollio
Antonio Gaudi
Hippodamus
A rule that certain kinds of contracts are enforceable unless signed and in writing or unless there is a written memorandum of their terms signed by the party to be charged
Bonds
Written Contracts
Statue of Frauds
General Conditions
Which of the following is not included in the basic physical planning requirements under PD 957
Accessibility
Usability
Reacheability
Availability
Minimum Floor are of Socialized single-occupancy condominium
18 sqm
36 sqm
22 sqm
24 sqm
Under BP 220, Minimum collector road
8.00m
6.50m
6.00m