Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

SAP Cert 1/4

Total questions: 87

Worksheet time: 3hrs 54mins

Name
Class
Date
1.

Which requirements do occasional users usually have concerning their UI?

a)

It should be browser-based

b)

It should be back-end-oriented

c)

It should be simple

d)

It should have many functions

2.

How do you call the field in an SAP GUI where you can enter a transaction code to start a transaction?

a)

SAP Fiori Launchpad

b)

Command field

c)

SAP Easy Access Favorite

d)

Menu bar

3.

Which organizational unit in financial accounting represents a legal entity and an independent accounting unit in the system?

(a)  

4.

Which organizational unit represents a purchasing department?

(a)  

5.

Which organizational unit is the central unit within the logistics?

(a)  

6.

Whitin a plant, material storage can be divide up according to various locations or rooms. Which organizational unit represents such a location or room?

(a)  

7.

The purchasing group must be assigned to which organizational units?

(a)  

8.

In the subcontracting process, a supplier provides you with material that you store, but are not required to pay for immediately

a)

True

b)

False

9.

How are organizational levels in a company structured from the top down?

a)

Company code - Client - Plant - Storage Location

b)

Client - Plant - Company Code - Storage Location

c)

Client - Company Code - Plant - Storage Location

d)

Plant - Client - Company Code - Storage Location

10.

A purchasing organization can be assigned only to one company code

a)

True

b)

False

11.

A purchasing organization can only be responsible for plants of one company code

a)

True

b)

False

12.

The key of a storage location is unique within which organizational unit?

a)

Client

b)

Company Code

c)

Plant

d)

Purchasing organization

13.

Which of the following are SAP Fiori apps that are used for the basic procurement process?

a)

Confirm Production Order

b)

Manage Purchase Orders

c)

Create Supplier invoice

d)

Post Goods Receipt for Purchasing Document

14.

Which documents can you refer to when creating a purchase order?

a)

Production order

b)

Purchase order

c)

Supplier invoice

d)

Contract

15.

Which of the following predefined item categories exist in purchasing?

a)

Subcontracting

b)

Standard

c)

Reversal

d)

Third party

16.

Which documents are created with a valuated goods recepit?

a)

Confirmation document

b)

Material document

c)

Accounting document

d)

Reversal document

17.

A movement type is always required for posting a goods movement.

a)

True

b)

False

18.

Which documents are created with an invoice posting?

a)

Invoice document

b)

Confirmation document

c)

Accounting document

d)

Reversal document

19.

Which of the following objects are represented by business partner master data?

a)

MRP Area

b)

Supplier

c)

Storage Location

d)

Customer

20.

Which organizational levels are relevant in the maintenance of a business partner with the supplier and FI vendor roles?

a)

Purchasing Organization

b)

Storage Location

c)

Purchasing Group

d)

Company Code

21.

Which of the following views can be created in a material master record?

a)

Purchasing organization data

b)

Accounting

c)

Sales

d)

Source of supply

e)

Forecasting

22.

When creating a material master record, you have to specify a material type. What does the material type control?

a)

The type of number assignment

b)

The permissible length of the material short text

c)

Whether a material may be ordered

d)

Which views can be maintained

e)

Whether a material may only be purchased from certain suppliers

23.

If you want to add a view to a material master record, you must take a change to the material master record.

a)

True

b)

False

24.

What kind of data is a purchasing info record?

a)

Transaction Data

b)

Customizing setting

c)

Master data

d)

Reporting Data

25.

Which of the following organizational levels are relevant for purchasing info records?

a)

Client

b)

Company Code

c)

Plant

d)

Storage Location

e)

Purchasing organization

26.

Which of the following statements about the valuation calss are correct?

a)

The valuation class is used to determine which stock account is updated during the goods movements of a material

b)

The valuation class is grouping key that controls the procedure used to valuate a material

c)

Your choice of valuation class determines whether purchasing conditions at plant level are allowed for a material

d)

The valuation class enables you to manage the stocks of several materials in one stock account

27.

If a raw material is transferred within one plant, what kind of posting is done in Financial Accounting?

a)

Price difference posting is made

b)

No posting is made

c)

Only accounting documents are updated

d)

A new account is created

28.

You have ordered a material for the warehouse that is valuated at the standard price (Price control S). If you now post the goods receipt for this purchase order, which of the following things happen?

a)

If the purchase order (PO) price differs from the standard price, this difference is directly posted to the stock account

b)

The inventory posting is carried out at the standard price defined in the material master record

c)

The standard price in the material master record is adjusted to the purchase order price.

d)

The total stock in the material master record is increased by the goods receipt quantity.

29.

You have ordered a material for the warehouse that is valuated at the moving average price (price control V). If you now post the goods receipt for this purchase order, which of the following things happen?

a)

The inventory posting is carried out at the purchase order price

b)

The total stock in the material master record is increased by the goods receipt quantity

c)

The moving average price in the material master records is recalculated based on the new stock value and the new total stock.

d)

The moving average price is calculated according to the formula: Total Stock / Total Value

30.

Which of the following data is necessary in a purchase order item if you want to purchase material directly for consumption?

a)

Account Assignment Category

b)

Material Number

c)

G/L Account

d)

Material Short Text

e)

Storage Location

31.

Which factor in a material master record control whether an account assignment category must be specified in a purchase order for this material?

a)

Material Group

b)

Industry sector

c)

Material Type

d)

Field selection

32.

How can purchase requisitions be created automatically?

a)

During material master data maintenance

b)

When canceling a sales order

c)

When saving production orders

d)

During material requirements planning

33.

When you create a purchase requisition item, you must always enter the valuations price manually

a)

True

b)

False

34.

Which source of supply is an outline agreement?

a)

Purchasing info record

b)

Scheduling agreement

c)

Production version

d)

Contract

35.

You want to purchase material to replenish the warehouse stock. Which ent4ries are required for this in a purchase order item?

a)

Account Assignment Category

b)

Material Number

c)

Goods Receipt Indicator

d)

Invoice Receipt Indocator

36.

In a purchase order item for consumable material, the Goods Receipt and Invoice Receipt checkboxes are selected. Now you post the goods receipt for this PO item. Which G/L Account are posted to at goods receipts?

a)

GR/IR account

b)

Vendor account

c)

Stock account

d)

Consumption Account

37.

In a purchase order item for consumable material, only the invoice receipt checkbox is selected. Now you post the supplier invoice for this PO item. Which G/L accounts are posted to an invoice receipt?

a)

GR/IR account

b)

Vendor account

c)

Stock account

d)

Consumption account

38.

Which of the following data must you specify when creating a quantity contract?

a)

Supplier

b)

Total Value

c)

Agreement type MK

d)

Delivery date + Plant + Release documentation

e)

Purchasing Organization

39.

Which indicators can you find in the source list?

a)

Automatic purchase order allowed

b)

Fixed Supply source

c)

Source list requirement

d)

Used in materials planning (MRP)

40.

How can you maintain a source list?

a)

Manually, per material and plant

b)

When creating or changing a purchase order item

c)

Automatically by the system

41.

Which screen areas ar differentiated in the single-screen transaction Create Purchase Requisition (ME51N)

a)

Initial Data

b)

Header

c)

Footer

d)

Document overview

e)

Item overview

42.

The single-screen transaction create purchase order (ME21N) is divided into the same screen areas as the transaction Create Purchase Requisition (ME51N)

a)

True

b)

False

43.

Which documents can you display in the document overview in transaction ME51N?

a)

Purchase orders

b)

Contracts

c)

Accounting documents

d)

Material documents

e)

Purchase requisitions

44.

What do you specify using the breakdown in the document overview of transaction ME21N?

a)

The values for selecting the documents

b)

The criteria to be used for sorting the selected documents

c)

The data to be displayed for a selected document

45.

Which prerequisites must be fulfilled for the automatic conversion of purchase requisitions into purchase orders?

a)

The purchase requisition header must have a valid source of supply assgined to it

b)

In the material master record, the Automatic PO indicator must be selected

c)

The purchase requisition item must have a valid source of supply assigned to it

d)

In the supplier master record, the Automatic PO indicator must be selected

46.

As in the document overview of transaction ME21N (Create purchase Order), you can use a selection in the overview tree of transaction MIGO (Goods Movements) to decide which documents are displayed.

a)

True

b)

False

47.

You want to post a goods receipt for a purchase order with the single-screen transaction for goods movements (MIGO). Which values have to be specified before you enter the purchase order number?

a)

Transaction

b)

Plant and storage location

c)

Movement Type

d)

Type of reference document

e)

Default values for your user

48.

Which different stock types exist?

a)

Unrestricted-use stock

b)

Restricted-use stock

c)

Blocked stock

d)

Quality inspection stock

49.

Which transactions can be entered with the single-screen transaction Enter Invoice (MIRO)

a)

Subsequent delivery

b)

Invoice

c)

Subsequent adjustment

d)

Subsequent debit

e)

Credit memo

50.

What do you indicate and imply when you select the Booking OK indicator for an item in the invoice?

a)

The item has been checked

b)

The item will be selected for the invoice posting

c)

The item has ben processed

d)

The item requires a manual booking confirmation when posting.

51.

Which of the following options can you specify per company code?

a)

Chart of accounts

b)

Order currency

c)

Local currency

d)

Divisions

52.

Which of the following assignments is mandatory for creating purchase orders?

a)

Company Code - Purchasing Organization

b)

Reference Purchasing Organization - Purchasing Organization

c)

Plant - Purchasing organization

d)

Standard purchasing organization - Plant

53.

For which processes do you need a standard purchasing orgnization?

a)

Subcontracting

b)

Consignment

c)

Third Party

d)

Pipeline

54.

On which organizational level do you define purchasing groups?

a)

Company code

b)

Plant

c)

Client

d)

Purchasing organization

55.

Which of the following can you define as valuation levels?

a)

Client

b)

Plant

c)

Company Code

d)

Storage Location

56.

Which of the following functions can be executed at plant level?

a)

Quantity-based inventory management

b)

Value-based inventory management

c)

Materials requirement planning

d)

Invoice verification

57.

Which of the following functions are executed at the storage level?

a)

Forecasting

b)

Physical inventory

c)

Capacity planning

d)

Maintenance planning

58.

Which of the following MRP elements can be created for a material procured externally by a requirements planning run?

a)

Production Order

b)

Scheduling agreement schedule lines

c)

Sales order

d)

Purchase requisition

e)

Purchase order and outline agreement

59.

Which of the following factors influence the type of procurement proposals that are created by the MRP run?

a)

The procurement type of a material

b)

The MRP procedure of a material

c)

The plant parameters

d)

The method to run MRP

60.

In demand driven planning, planned requirement quantities trigger requirements calculation

a)

True

b)

False

61.

Consumption-based planning methods are usually based only on past material usage.

a)

True

b)

False

62.

In forecast-based planning, you can consider external requirements.

a)

True

b)

False

63.

MRP areas can only be specified within a plant

a)

True

b)

False

64.

How many subcontractors can be included in a subcontractor type MRP area?

a)

0

b)

1

c)

2

d)

unlimitied

65.

Receipt elements (planned orders, purchase requisitions) containing a storage location that belongs to an MRP area are assigned to this MRP automatically

a)

True

b)

False

66.

Select the possible types of MRP area for planning

a)

Company code

b)

Plant

c)

Warehouse

d)

Storage location

e)

Subcontractor

67.

Which field in the material master record controls whether a material is planned consumption-based or demand-based?

a)

The MRP profile

b)

The MRP type

c)

the MRP group

d)

The MRP controller

68.

On which organizational levels can MRP relevant fields like lost-sizing procedure or MRP type be maintained in a material master record?

a)

Plant

b)

Storage location

c)

MRP area

d)

Client

69.

Which of the following statements apply to the MRP type?

a)

The MRP type is assigned to a material and controls the MRP procedure

b)

A material can have different MRP types per plant and even per MRP area

c)

The MRP types are delivered by SAP and cannot be changed

d)

Allow MRP types are defined per material type

70.

What are the lot sizing procedure categories?

a)

Static

b)

Period

c)

Exact

d)

Optimizing

e)

Dynamic

71.

The replenishment lead time of a material is the sum of the purchasing department processing time, planned delivery time and goods receipt processing time. These three elements can be maintained in the material master record.

a)

True

b)

False

72.

The following describes the individual sub-processes of a planning run: Check the planning file, net requirements calculation, lot size calculation, scheduling, and type of procurement proposal determination. With the corresponding settings, the system determines a source of supply during a planning run for externally procured materials, and assigns them directly to the procurement proposal.

a)

True

b)

False

73.

The low-level code is the lowest level at which a material appears within a bill of material (BOM)

a)

True

b)

False

74.

Te low-level code that is used during the MRP run is automatically determined and is displayer in the planning file.

a)

True

b)

False

75.

In the reorder point planning MRP procedures, procurement is triggered when the sum of plant stock and fixed receipts falls short of the reorder point. The reorder point should include the expected average material requirements during the replenishment lead time, plus a safely stock to safeguard against uncertainties.

a)

True

b)

False

76.

During net requirements calculation of a material planned with reorder point planning, the warehouse stock available for MRP includes the plant stock and the on-order stock. Which of the following elements belong to on-order stock?

a)

Purchase requisitions

b)

Purchase orders

c)

Sales orders

d)

Firm planned orders & fixed purchase requisitions

e)

Planned orders

77.

During backward scheduling for a material planned with reorder point planning, the system defines the date on which the material will be available, starting from the date of the planning run. Starting with today's date, the availability date is calculated by adding the purchasing department processing time (in working days), the planned delivery time (in calendar days), and the GR processing time (in working days).

a)

True

b)

False

78.

The MRP group is assigned to the relevant master record according to the material type.

a)

True

b)

False

79.

How many processing keys for the planning run are available?

a)

one

b)

two

c)

three

d)

four

80.

The creation indicator for MRP lists determines if and when the planning run should create MRP lists.

a)

True

b)

False

81.

What is the correct processing key to use if you want to trigger regenerative planning.

a)

NETCH

b)

NEUPL

82.

Plant parameters have higher priority than MRP group parameters

a)

True

b)

False

83.

With MRP live you can flexibly define the scope of planning; for example, you can decide to plan a range of materials that are the responsibility of certain MRP controllers in selected plants.

a)

True

b)

False

84.

What are the options for converting a planned order into a purchase requisition?

a)

Individual conversion

b)

Collective conversion

c)

Conversion by storage location

d)

Conversion by purchasing group

85.

The MRP list always displays the stock/requirements situation at the time of the last planning run, and also provides a work basis for the MRP controller.

a)

True

b)

False

86.

Any number of transaction call can be defined in a navigation profile.

a)

True

b)

False

87.

Exception messages are created during the planning run for situations that need to be checked by the MRP controller.

a)

True

b)

False