WorksheetsConcrete and masonry; Types of Construction
Total questions: 30
Worksheet time: 15mins
It is a continuous reinforcing bar having a seismic hook at one end and a hook not less than 90-degree hooks with at least six-diameter extension at the other end. The hooks shall engage peripheral longitudinal bars. the 90-degree hooks of two successive crossties engaging the same longitudinal bars shall be alternated end for end.
Reinforcing Steel Bars
Stirrups
Lateral Ties
Crosstie
The normal weight of concrete is 2400kg/m3. This is equivalent to ____ in lb/ft3.
100
150
200
250
A slight curve used in long spans such as beam, girder or truss with a purpose of counteracting deflection due to load.
Deflection
Elastic Curve
Camber
Arch
The following are structures like a beam, except:
Girt
Joist
Purlin
Corbel
A wall of treated timber, masonry, or concrete for holding in place a mass of earth.
Shear Wall
Bearing Wall
Retaining Wall
CHB Wall
Planted Column is considered in design as:
Dead Load
Concentrated Load
Live Load
Uniformly Distributed Load
Which among the following activities takes 21 days before Formwork Removal is implemented?
Removal of soffit formwork to beams and slabs
Removal of props to beams spanning up to 6m
Removal of props to beams spanning over 6m
Removal of props to slabs spanning up to 4.5m
When laying concrete, it is sometimes not possible to pour in one setting. It can be due to weather, time constraints, lack of materials or even by design. Hence, there will be a separation between old and newly poured concrete once concrete pouring resumes. What do you call this?
Expansion Joint
Contraction Joint
Construction Joint
Cold Joint
Slump test is done in fresh concrete in order primarily to determine:
Workability & Consistency
Water Content
Elasticity
Rigidity
It is the stress caused by an applied loads that tend to twist the structure.
Shear stress
Torsional Stress
Normal Stress
Compressive Stress
Property that enables deformity upon application of force and recovers after removing such force
Ductility
Elasticity
Yield Strength
Rupture Strength
The minimum thickness of a solid non-prestressed concrete slab allowed by code (NSCP) is:
75mm
100mm
125mm
150mm
What is the minimum concrete cover of cast-in-place beams exposed to weather considering 20mm dia. bars?
40mm
20mm
50mm
75mm
Identify the picture.
Braced Construction
Diagrid Construction
Trussed Construction
Latticed Construction
What area is not recommended to use capillary membrane waterproofing?
Cistern
2nd Floor Balcony
Storage Tank
Elevator Pit
A manual method of squaring the corners of a building lines in building layout, is the use of?
2-3-4 multiples with the use of transit
3-4-5 multiples with the use of steel tape measure
4-5-4 multiples and strings
1-2-3 multiples with the use of plastic hose
Identify the picture.
Single Tees
Double Tees
Solid Flat Slab
Hollow Core Slab
The time required for the removal of a form works of a concrete footing?
24 hours
36 hours
48 hours
12 hours
Curing period for the removal of forms in beams and girder bottom form up to 14"?
7 days
12 days
14 days
21 days
Curing period for the removal of forms in beams and girder side form?
2 days
3 days
6 days
7 days
Curing period for the removal of forms in slab over 7 feet in span?
12 days
14 days
21 days
7 days
A technique of constructing multistory buildings in which all horizontal slabs are cast at ground level and, when cured are raised into position by hydraulic jacks?
Tilt-up construction
Modular Construction
Lift-slab Construction
Hydraulic Construction
A method of casting reinforced concrete wall panels on site in a horizontal position, then tilting them up into their final position.
Tilt-up Construction
Tilted Construction
Tilting Construction
Horizontal Tilt-up Construction
The architect should expect the subfloor to sustain some damage during the construction process.
True
False
Maybe
I don't know
Is prepared by grinding pozzolanic clinker with Portland cement. It is also produced by adding pozzolana with the addition of gypsum or calcium sulfate or by intimately and uniformly blending portland cement and fine pozzolana.
Ord. Portland Cement
Portland Pozzolana Cement
Rapid Hardening Cement
Low Heat Cement
Is prepared by maintaining the percentage of tricalcium aluminate below 6% by increasing the proportion of C2S. This makes the concrete to produce low heat of hydration and thus is used in mass concrete construction like gravity dams, as the low heat of hydration prevents the cracking of concrete due to heat.
Ord. Portland Cement
Portland Pozzolana Cement
Rapid Hardening Cement
Low Heat Cement
Is used to reduce the risk of sulphate attack on concrete and thus is used in construction of foundations where soil has high sulphate content. This cement has reduced contents of c3A and c4AF.
White Cement
Air Entraining Cement
Sulfates Resisting Cement
High Alumina Cement
It is produced by mixing 5-10% mineral pigments with ordinary cement. They are widely used for decorative works in floors.
White Cement
Air Entraining Cement
Red Cement
Colored Cement
It is most widely used type of cement which is suitable for all general concrete construction. It is most widely produced and used type of cement around the world with annual global production of around 3.8 million cubic meters per year. This cement is suitable for all type of concrete construction.
Ord. Portland Cement
Portland Pozzolana Cement
Quick Setting Cement
Blast Furnace Cement
A stair constructed without risers is generally called a?
No-riser stair
Closed-riser stair
Open-riser stair
Hollow stair