wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Ms. NHUNG. CUTE. MAP - SCIENCE PARK

Total questions: 6

Worksheet time: 3mins

Name
Class
Date
1.

The maps provide a clear and detail description about the................. made to a science park dating back to 2008

a)

modernization

b)

difference

c)

change

d)

alteration

2.

In general, it is readily apparent that the park has been ............to include more areas for research, ........... and improved accessibility

a)

enlarge / educating

b)

expanded /education

c)

widen / educate

d)

extend/education

3.

Considering initially the northern end of the park, in 2008 there was considerable untouched ............. that has now been replaced with a research and development center (the reception area was also removed in favor of a university hub, while the adjacent offices remain the same)

a)

natural areas

b)

natural land

c)

natural lands

d)

natural landed

4.

South of these ............., the car park has reduced in size, the business units are unchanged, and, most significantly, the cyber security building has been enlarged, overtaking previously undeveloped land.

a)

new facility

b)

old facilities

c)

new facilities

d)

new infrastructures

5.

In the southern section of the park, the circular IT centre has been............. into an innovation centre and there is a new train station on the southernmost tracks with walkways branching off to various facilities

a)

transformed

b)

transform

c)

erected

d)

build

6.

Finally, there are additional ............along an eastern road and running through the centre of the park past the car park and new buildings as well as a bus stop on the eastern side of campus.

a)

cycle route

b)

biking road

c)

biking route

d)

biking routes