WorksheetsLesson 4 Quiz
Total questions: 10
Worksheet time: 4mins
1. What is used for work that is nonroutine, with a unique set of objectives to be accomplished in a limited time frame?
. Project
Job Shop
Batch
Fixed Position Layout
1. What layouts are designed to process items or provide services that involve a variety of processing requirements. The variety of jobs that are processed requires frequent adjustments to equipment?
Batch
Job shop
project
Process Layouts
1. What layouts are designed when the item being worked on remains stationary, and workers, materials, and equipment are moved about as needed?
Job shop
Fixed Position Layouts
Batch
Project
1. What process is used when higher volumes of more standardized goods or services are needed?
Continuous
Batch
Repetitive
Project
1. What system is used when a very high volume of nondiscrete, highly standardized output is desired?
Continuous
Job Shop
Repetitive
Project
1. What are used to achieve a smooth and rapid flow of large volumes of goods or customers through a system?
Process Layouts
Product Layouts
Project
Batch
1. Usually operates on a relatively small scale. It is used when a low volume of high-variety goods or services will be needed.
Job Shop
Batch
Fixed Position Laouts
Project
1. Used when a moderate volume of goods or services is desired, and it can handle a moderate variety in products or services.
Batch
Job Shop
Project
Continuous
1. Machinery that has sensing and control devices that enable it to operate automatically.
Automation
Service Layouts
Product Layouts
Process Layouts
1. Often be categorized as product, process, or fixed-position layouts.
Service Layouts
Process Layouts
Product Layouts
Fixed- Position Layouts
