WorksheetsTechnical Specifications
Total questions: 10
Worksheet time: 5mins
The ________ shall be a licensed architect or engineer with at least five (5) years relevant experience on similar and comparable projects in different locations. The ________ should have a proven record of managerial capability through the directing/managing of major civil engineering works, including projects of a similar magnitude.
Project Manager
Materials Engineer
Project Architect
Project Engineer
comprises the data on technical development, processes, and design linked to the requirements it describes. Such a document offers information to stakeholders and developers on business internal standards, best practices, and requirements.
Technical Documentation
Specifications
Technical Specifications
Specifications Documentation
The _______ is responsible in the execution of the work activities that are required for the completion of the project. The roles and responsibilities of _______ manifest themselves in various aspects of the project for instance project planning, management, monitoring, construction site safety, and legal issues.
Foreman
Engineer
Architect
Contractor
Defined as Work that involves in any material respect any roof, load-bearing wall, structural beams, columns, supports, foundation or any other structural element.
Metal Works
Structural Works
Architectural Works
Mechanical Works
Government Procurement Reform Act
RA 9186
RA 9184
RA9148
RA 9146
Shall consist of installation of connections within the building.
Electronics and Communication Works
Plumbing Works
Electrical Works
Mechanical Works
_______must be an accredited safety practitioner by the Department of Labor and Employment (DOLE) and has undergone the prescribed 40- hour Construction Safety and Health Training (COSH).
Sanitary Engineer
Safety Officer
Safety Engineer
Sanitary Officer
_______formulate the blueprint for the project being built.
Technical Documentation
Technical Specifications
Specifications Documentation
Specifications
Shall consist of furnishing all materials, tools, equipment, and fixtures required as shown on the plans for the satisfactory performance of the entire plumbing system including installation in accordance with the latest edition of the National Plumbing Code.
Plumbing Works
Structural Works
Mechanical Works
Architectural Works
This section includes the key professionals and their respective qualifications.
Selection of Contractor
Construction Personnel
Construction Phase
Mode of Payment