Testing - The Synapxe Way!

Total questions: 15

Worksheet time: 10mins

Name
Class
Date
1.

What is the purpose of Test Guideline?

a)

Test Guideline dictates the testing types and related activities that need to be carried out based on the project risk.

b)

Test Guideline provides guidance on how to conduct various types of testing.

c)

Test Guideline provides guidance on environments to be planned.

d)

Test Guideline ensures detailed test planning.

2.

A Test Framework is a set of:

a)

Concepts

b)

Assumptions

c)

Guidelines

d)

Practices

3.

What kind of test assessment tools are provided as part of the Test Guideline?

a)

Test Calculator and Cost Calculator

b)

Risk Calculator and Environment Planner

c)

Environment Planner and Cost Calculator

d)

Risk Calculator and Test Calculator

4.

The Test Initiation phase involves the following activities except:

a)

Understanding of test requirements

b)

Estimating resources and time required

c)

Testing by testers

d)

All of the above

5.

The following delivery methodologies doesn't require a Test Plan:

a)

Sequential (Waterfall, V-Model)

b)

Agile (Scrum, DevOps)

c)

Hybrid (Demand-Supply, SAFe)

d)

None of the above

6.

Which of the following would not normally form part of a Test Plan?

a)

Features to be tested

b)

Defects Summary

c)

Features not to be tested

d)

Schedule

7.

Which of the following is not part of the inputs required in the Test Analysis and Design phase?

a)

Test Readiness Review (TRR)

b)

Functional Requirements

c)

Technical Requirements

d)

Requirements Traceability Matrix

8.

Which of the following best represents a Test Exit Report?

a)

Stakeholders are not involved.

b)

Stakeholders evaluate the quality of the tested product and stops the project if the quality is bad.

c)

Stakeholders evaluate the quality of the tested product and make an informed decision to proceed or not to proceed to the next phase.

d)

Stakeholders evaluate the quality of the tested product, extends the duration of the test phase and decides to proceed forward.

9.

What you can't do with the Test QA checklists?

a)

Identify gaps and fix them proactively

b)

Perform test audits

c)

Define test execution plan

d)

Assess the health of various test activities/phases

10.

Which phase of the Test Framework involves providing feedback, improving the test delivery?

a)

Test Analysis and Design

b)

Test Execution

c)

Test Closure

d)

Test Planning

11.

For large scale projects, which test governance role is critical under the test governance layer?

a)

Test Lead/Manager

b)

Test PD

c)

PMO

d)

EXCO

12.

What are the DON'TS when it comes to Test Planning?

a)

Underestimate test phase(s)

b)

Establish R&R

c)

Overlook risk(s)

d)

Provision test environments

13.

What are the DON'TS when it comes to Test Analysis and Design?

a)

Skip review of test scenarios/cases

b)

Determine Test Coverage

c)

Ensure correct sizing and configuration of test environment

d)

Ignore negative and alternate test flows

14.

Test Productivity can be increased by

a)

Leveraging the existing test assets

b)

Integration of people, processes and tools

c)

Analysing and understanding specific test requirements

d)

Static Testing

15.

TES portfolio offers

a)

Functional Testing

b)

Specialised Testing

c)

Test Management & Governance

d)

Testing Tools for non-TES staff