Quarry operational plan

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is the name of the Quarry operational plan?

a)

QOP

b)

Albion park Quarry extension

c)

Albion park Bypass

d)

Nowra Bridge

2.

Where is the location of the Quarry?

a)

Port kembla office

b)

Home

c)

sand Quarry

d)

East west link road

3.

What stages of the quarry does the document refer to?

a)

3&4

b)

2&3

c)

4

d)

1

4.

what is the PROJECT NOISE EMISSION LIMITS for stage 3&4 on the The Hill” residence (Dunster premises)?

a)

40

b)

38

c)

45

d)

30

5.

What is the Operating Hours for weekdays?

a)

6am-4pm

b)

7am-5.30pm

c)

7.30am-5.30pm

d)

6.30am-4.30pm

6.

Within how many days of detecting an exceedance of a noise limit,

the exceedance is to be reported to EPA, the Secretary of the DPE and the

owner of the property?

a)

7days

b)

5days

c)

4days

d)

3days

7.

In the event of any exceedance of relevant criteria, the matter will immediately be brought to attention of who?

a)

Safety officer

b)

blasting subcontractor

c)

Your mate

d)

the attention of the Quarry Production Manager

8.

All acoustic instrumentation employed throughout the noise monitoring programme will be designed to

comply with the requirements of ...?

a)

AS 1259.2-1990

b)

Handbook

c)

Quarry safety procedure

d)

Toolbox

9.

Meteorological measurements will be measured at what intervals?

a)

10mins

b)

15mins

c)

20mins

d)

30mins

10.

what are the Best Environmental Management Practices?

a)

Siting high noise generating plant and equipment at remote locations.

b)

Scheduling high noise generating operations to occur during late morning and afternoon only

c)

Monitoring, reporting and community liaison programmes

d)

All above