1.

It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc.

a)

Architectural programming

b)

Space programming

c)

Space planning

d)

Consultation

2.

The architect was asked to analyze the site's potentials, the context of the site as well as its surroundings. Which service was rendered?

a)

Architectural programming

b)

Site utilization and land-use studies

c)

Site selection and analysis

d)

Consultation

3.

In comparative selection, during which step does the selection committee visit buildings designed by the architect?

a)

Invitation

b)

Pre-qualification

c)

Interview

d)

Verification

4.

Which is NOT true of architectural design competitions?

a)

They may be expensive

b)

They are open only to architects and not architectural firms

c)

They may be time-consuming

d)

All of these are true

5.

Which selection method is appropriate for civic projects?

a)

Direct selection

b)

Comparative selection

c)

Architectural design competition

d)

Bidding

6.

What service is rendered when the architect attends conferences upon the client's request?

a)

Architectural research

b)

Promotional services

c)

Representation

d)

Consultation

7.

In comparative selection, during which step does the client issue the ToR for the project?

a)

Invitation

b)

Interview

c)

Verification

d)

Evaluation

8.

In direct selection, which should NOT be a basis of the client for selecting an architect?

a)

Architect's reputation

b)

Recommendation of a friend

c)

Recommendation of another architect

d)

Sketches submitted by the architect for the contemplated project

9.

Which term does not belong?

a)

Contractor

b)

General Contractor

c)

Manufacturer 

d)

Builder

10.

This technique is applied in the cost management process to minimize the negative effect of simplified operations associated with many cost-reduction programs.

a)

Cost management

b)

Value management

c)

Value engineering

d)

Cost engineering

11.

Which term does not belong?

a)

Client

b)

Consultant

c)

Project Proponent

d)

All of these terms belong to this list

12.

In this service, the architect determines the adequate size and appropriate configuration for a proposed project considering the use, allocation, and interface of spaces for given activities.

a)

Space management studies

b)

Space planning

c)

Architectural programming

d)

Site utilization studies

13.

In comparative selection, this is the step where the selection committee may visit past projects of a prospective architect and check with references such as past clients and/or financial institutions.

a)

Interview

b)

Prequalification

c)

Verification

d)

Evaluation and ranking

14.

Which method of selection is appropriate for monumental projects?

a)

Bidding

b)

Competition

c)

Direct selection

d)

Either B or C

15.

They represent the architect’s initial assessment of a project’s soundness generally using researched, processed, and validated secondary data.

a)

Pre-feasibility study

b)

Appraisal

c)

Business plan preparation

d)

Feasibility study

16.

In this phase of the regular design service, the architect prepares the initial line drawings representing design studies that will lead to a recommended solution

a)

Project definition phase

b)

Schematic design phase

c)

Design development phase

d)

Pre-design phase

17.

Is it the duty of the architect to review the contractor’s billings and issue Certificates of Payment during the regular design service?

a)

Yes, this is part of the regular design service

b)

No, this is not part of the regular design service

c)

Only if the architect will be hired to perform construction management services as well.

d)

Both B and C

18.

How many sets of drawings should the architect give to the client as part of the regular design service?

a)

3 sets

b)

5 sets

c)

7 sets

d)

9 sets

19.

Once the architect has completed the detailed design and contract documents phase, the architect is entitled to collect how much of his fee?

a)

100%

b)

90%

c)

85%

d)

70%

20.

In which phase of the regular design service does the architect prepare the outline specifications?

a)

Design development

b)

Contract documentation

c)

Schematic design

d)

Project definition

21.

In which phase of the regular design service does the architect prepare the technical specifications?

a)

Design development

b)

Contract documentation

c)

Schematic design

d)

Predesign

22.

Which entities do the standards in SPP Doc. 202 apply to?

a)

A licensed architect

b)

An architectural partnership fully compliant with Sec. 37 of RA 9266

c)

An architectural corporation fully compliant with Sec. 37 of RA 9266

d)

All of the above

23.

In this phase, the architect consults with the owner to ascertain the conceptual framework and related requirements of the project and confirms such requirements with him.

a)

Predesign phase

b)

Project definition phase

c)

Schematic design phase

d)

Conceptual design phase

24.

In this phase, the architect prepares the initial line drawings representing design studies leading to a recommended solution, including a general description of the project for approval by the Owner.

a)

Predesign phase

b)

Consultation phase

c)

Schematic design phase

d)

Conceptual design phase

25.

In which phase are diagrammatic layouts of construction systems prepared?

a)

Predesign phase

b)

Schematic design phase

c)

Design development phase

d)

Both B and C

26.

In which phase are the technical specifications prepared and issued?

a)

Schematic design phase

b)

Design development phase

c)

Contract document phase

d)

Bidding phase

27.

In which phase are the outline specifications prepared and issued?

a)

Schematic design phase

b)

Design development phase

c)

Contract document phase

d)

Bidding phase

28.

Which is NOT a duty of the architect in the regular design service?

a)

Assisting the owner in filing the required documents to secure approval of government authorities

b)

Gathering and turning over to the owner written guarantees required of the contractor and Sub-contractors

c)

Describing the type and quality of materials, finish, manner of construction and the general conditions under which the project is to

d)

All of these are duties of the architect in the regular design service

29.

What is the extent of site visits the architect must conduct in the course of rendering the regular design service?

a)

Periodic

b)

Once a week

c)

Twice a week

d)

Twice a month

30.

In which phase/s is the architect not expected to update the SPPCC?

a)

Schematic design phase

b)

Design development phase

c)

Bidding phase

d)

Both C and D

31.

Building classifications in SPP 202, identify:

"PARKING BUILDING"

a)

Group 1

b)

Group 2

c)

Group 3

32.

Building classifications in SPP 202, identify:

"CONVENT"

a)

Group 1

b)

Group 2

c)

Group 3

33.

Building classifications in SPP 202, identify:

"MUSEUM"

a)

Group 3

b)

Group 4

c)

Group 5

34.

Building classifications in SPP 202, identify:

"WAREHOUSE"

a)

Group 1

b)

Group 2

c)

Group 3

35.

Building classifications in SPP 202, identify:

"STADIUM"

a)

Group 1

b)

Group 2

c)

Group 3