wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

SPP DOC 203-205

Total questions: 35

Worksheet time: 18mins

Name
Class
Date
1.

As a result of the pandemic, a developer's office building has lost nearly 50% of its tenants. The management hired an architect to come up with schemes to appeal to a different tenant demographic and increase building occupancy. What service is the architect rendering?

a)

A specialized allied service

b)

A specialized architectural service

c)

A post-construction service

d)

Both C and D

2.

All of the following are part of the scope of the full-time supervision service except for:

a)

Quality Control

b)

Evaluation of construction work

c)

Preparation of daily inspection reports

d)

Cost and time control

3.

SPP Document 205 contains the standards for:

a)

Specialized allied services

b)

Regular design services

c)

Post-construction services

d)

Specialized architectural services

4.

 

SPP Document 203 contains the standards for:

a)

Specialized allied services

b)

Regular design services

c)

Post-design services

d)

Specialized architectural services

5.

The construction management service is covered by which SPP Document?

a)

SPP 202

b)

SPP 204a

c)

SPP 204b

d)

Both B and C

6.

The detailed planning and design to control sound transmission for compatibility with the architectural design concept is

a)

Predesign service

b)

Post-construction service

c)

A specialized allied service

d)

A specialized architectural services

7.

Business development or business management includes billing the tenants for rentals and utilities (electricity, water, telephone, cable, gas and other/ related dues). Which SPP Document covers this service?

a)

SPP DOC 203

b)

SPP DOC 205

c)

SPP DOC 204b

d)

SPP DOC 204a

8.

The detailed planning and design of the indoor areas of any proposed building, including retrofit, renovation, rehabilitation or expansion work, including the architectural laying out of all building engineering systems

a)

Architectural Interiors

b)

Space Management studies

c)

Space Planning

d)

Regular design service

9.

Who normally recommends the construction supervision group (CSG)?

a)

Architect

b)

Contractor

c)

Owner

d)

Project Manager

10.

The orderly arrangement within a piece of land on which vertical structures such as buildings, monuments and the like, as well as horizontal developments such as rights-of-way, open spaces, and activity spaces are to be proposed

a)

Site Planning

b)

Comprehensive Planning

c)

Physical Planning

d)

Planned unit development

11.

Which of the following is not part of the scope of services for construction management?

a)

Quality control

b)

Evaluation of construction work

c)

Building and Facilities administration

d)

Filing of Documents

12.

Which SPP Document covers services that deal with specific expertise for the further enhancement of the architectural interior and exterior components of a project?

a)

SPP Doc 201

b)

SPP Doc 202

c)

SPP Doc 203

d)

SPP 205

13.

In this service, the architect prescribes space plans, stacking diagrams/sections and computations of areas for the different activities and spaces to be integrated in a building project.

a)

Regular Design Service

b)

Space Planning

c)

Architectural Programming

d)

Architectural Interiors

14.

Which is not a specialized architectural service?

a)

  Preparation of the drawings and specifications for acoustic design and treatment, sound control and reinforcement, sound absorption, reflectance, insulation, etc.

b)

Producing and coordinating the additional activities necessary for promotional activities in order to develop and generate financial support for and acceptance of the project from governing agencies or from the general public

15.

An architect who is also a landscape architect is especially suited for which specialized architectural service?

a)

Site development planning

b)

Site and Physical Planning

c)

Comprehensive development planning

d)

Site selection and analysis

16.

Construction in a building involving changes in the materials used, partitioning, locations/sizes of openings, structural parts, existing utilities and equipment without increasing the overall area.

a)

Alteration

b)

Renovation

c)

Slum Upgrading

d)

Redecoration

17.

The transfer of buildings or portions thereof from an original location to another, either within the same lot or to a different one.

a)

Evacuation

b)

Reassembly

c)

Moving

d)

Disaster Displacement

18.

Any physical change made on a building/ structure to increase its value, utility and/ or to improve its aesthetic quality

a)

Slum upgrading

b)

Renovation

c)

Interior Design

d)

Architectural Interiors

19.

This term refers to any new construction which increases the height or area of an existing building.

a)

Addition

b)

Alteration

c)

Renovation

d)

Conversion

20.

Which is not a scope of services on SPP Doc 204 A

a)

Quality control

b)

Building maintenance

c)

Preparation of Daily Inspection Reports

d)

Filing of Documents

21.

Which is not a scope of services on SPP Doc 205

a)

Grounds and Landscaping Supervision

b)

Building Equipment Maintenance

c)

Evaluation of Construction Work

d)

Business Development and Management

22.

Which is not an architect’s duty when he functions as a construction manager?

a)

Quality control of work (QC)

b)

Keeping of records for the project

c)

Design Revisions

d)

Cost and time control

23.

Forensic architecture is a

a)

Regular design services

b)

Specialized allied servicesd

c)

Specialized architectural service

d)

Specialized predesign service

24.

Which SPP document covers Construction Management (CM) services?

a)

SPP 203

b)

SPP 204A

c)

SPP 204B

d)

SPP 205

25.

Upon moving in to your new condominium building, you discovered that your friend who is an RLA works in your building and collects condo dues from the residents. Your friend is probably rendering

a)

Specialized Architectural Services

b)

Specialized Allied Services

c)

Comprehensive Architectural services

d)

Post-Construction Services

26.

The orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments and the like, as well as horizontal developments like RROWs are going to be built

a)

Site Planning

b)

Physical Planning

c)

Master Development Panning

d)

Comprehensive Planning

27.

For cases where the client requests an architect to do work that will require his personal time, what is recommended to be charged to the client?

a)

Per Diem

b)

Honorarium

c)

Reimbursible Expenses

d)

All of the Above

28.

When there is a continuing relationship with the owner involving a series of projects, which method of compensation is recommended?

a)

Lump Sum

b)

Multiple of Direct personnel expense

c)

Honorarium

d)

Professional Fee plus Expenses

29.

In the multiple of direct personnel expenses, what is added to the “Fee” to get the total cost charged to the client?

a)

The consultant's fee

b)

Reimbursible

c)

Income taxes

d)

Healthcard

30.

For the multiple of direct personnel expense method of compensation, what is the multiplier recommended by the SPP?

a)

1.0-2.0

b)

1.5-2.5

c)

3.5-5.0

d)

5.0-7.5

31.

   When construction is suspended for a period of 8 months, what happens to the architect’s fee for the remaining works?

a)

It is withheld by the owner until completion of the project

b)

It is withheld by the owner until the issues on-site are resolved

c)

It is doubled

d)

Nothing. It stays the same

32.

The architect’s fee is a

a)

Net Amount

b)

Immune to all forms of taxes

c)

Incomplete amount

d)

Both A and B

33.

Which is not part of the PCC?

a)

Cost of electrical fixtures

b)

Cost of the air-conditioning system

c)

Cost of acquiring the lot

d)

All of these are not part of the PCC

34.

Which is the largest amount?

a)

PCC

b)

PDC

c)

The Architect's Fee

d)

Both A and B

35.

This planning service places heavy emphasis on the non-physical and non-engineering components of the master development plan

a)

Site Planning

b)

Physical Planning

c)

Master Planning

d)

Comprehensive Development Planning