A group of two or more Architects duly registered with the SEC and then with the Board of Architecture.
architectural company
architectural corporation
architectural venture
architectural partnership
A structure for the purpose and function of habitation and other uses.
building
house
condominium
multi-purpose units
Physical planning at site, community or urban level by an Architect.
contract documents
plans
planning
model
A person professionally and academically qualified, registered and licensed under
R.A.9266 with the certificate of registration and professional identification card issued by the Professional Board of Architecture and the Profession Regulation Commission and
who is responsible for the advocating the fair and sustainable development, welfare and
cultural expression of society’s habitat in terms of space, forms and historical context.
architect of record
architect
architect in charge of construction
consulting architect
A group of professionals in architecture and allied profession, incorporated with architects for the purpose of delivering professional service in architecture and allied professionals.
architectural company
architectural corporation
architectural venture
architectural partnership
A registered and licensed architect, who is academically and professionally qualified and with exceptional or recognized expertise or specialization in any branch of architecture.
architect of record
architect
architect in charge of construction
consulting architect
An architect who is not a Filipino citizen nor an architect registered and licensed in the Philippines, but who is duly registered and licensed in his/her home country as an architect.
foreign architect
Filipino overseas architect
American architect
associate architect
Physical and systematic design undertaken by the architect on a community and urban plane, more comprehensive than, and an extension of the architecture of buildings, spaces between buildings, entourage, utilities and movement systems.
urban planning
urban development
urban design
urban redevelopment
An individual architect practicing and delivering architectural services, duly registered with DTI, BOA, and the PRC.
associates
sole proprietorship
mentor
architect
A person whose name and registration/professional license number is entered in the PRC registry book and computerized data base as one legally to practice his profession.
architect
contractor
professional
board member
The architect who design and advocated the Geodesic Dome for the cities of tomorrow was.
Louis Khan
Buckminster Fuller
Le Corbusier
Mies Van De Rohe
Through the history of human race, what is considered the mother of all arts.
Fine Arts
Music
Painting
Architecture
In Egyptian architecture, the tomb of Pharaoh was the
Ziggurat
Mastaba
Pyramid
Stupa
The mineral of greatest importance to Greek architecture of which Greece and her domains had ample supplies of was
Pozzolana
Marble
Clay
Limestone
Greek architecture was essentially
Arch and Vault
Buttressed and Dome
Columnar and Trabeated
Forming the imposing entrance to the acropolis and erected by architect Minescicles is the
Propylaea
Erectheion
Poseidon
Agora
Which of the orders was added by the Romans to the orders used by the Greeks.
Ionic
Composite
Corinthian
Doric
The finest example and remaining example of Byzantine Architecture is
S. Irene, Constantinople
S. Sophia, Constantinople
S. Mark, Venice
S. Peter, Vatican
The greatest patron of Romanesque architecture is the
Churches
Private Buildings
Civil Government
Gathering Place
An ornate architectural style which developed during the latter part renaissance period is called
Baroque
Byzantine
Romanesque
Palladian
Monumental gateway of Egyptian temple is
Pylon
Propylaea
Torana
Agora
The monumental architecture of Egypt is essentially
Buttress and Dome Style
Arch and Vault Style
Columnar and Trabeated Style
The most important and distinctive characteristics or nature of Spanish Romanesque architecture was the
Horseshoe arch
Lancet
Parabolic
True radiating arch
The architectural character of Romanesque style is
Sober and Dignified
Grotesque
Flamboyant and Decorative
Creative and Detailed
In the early years of city planning, who advocated the principles of neighborhood planning.
James Howard
Clarence Perry
Charles Abraham
Doxiadis
The law to enhance the mobility of disabled person is also known as;
PD957
BP220
BP344
PD1096
Under PD1096, parking areas for disabled person shall be how many meters from the facility being served.
35m
40m
50m
60m
Under accessibility law, walk way should have a gradient of not more than
1:12
1:20
1:18
1:100
Accessible parking slots should have a min width of
3.50m
3.00m
3.70m
4.00m
The min. width of ramp for disabled person should be
1.50m
1.20m
1.00m
2.00m
The maximum gradient of ramp shall be
1:12
1:20
1:18
1:100
The min. width of door for disabled person shall be
0.90m
0.75m
0.80m
1.00m
The accessible water closet stall shall have a min. area of
1.50 x 1.60m
2.00 x 1.50m
1.70 x 1.80m
1.10 x 1.40m
The required turning space for accessible water closet shall be
2.25sqm
2.50sqm
2.75sqm
1.50sqm
The min. width of curb cut-out for disabled person shall be
1.20m
1.00m
0.90m
0.80m
A professional services in which the architect act as the agent of the client.
Regular Services
Comprehensive Architectural Services
Pre-design Services
UAP Doc 202 is also known as
Pre-Design
Design Services
Code of Ethics
If the project abandoned or suspended, in whole or in part of, the Architect is to be paid by the owner for the services rendered equivalent to how many percent oh his MBF.
50%
75%
85%
95%
Under Post Construction Services, Bldg. and equipment maintenance is also known as
Clerk of Work
In-House Architect
Total Quality Management
Under construction services, the compensation of the architect as a full time supervisor shall be
2-3% of PCC
1 1/2-3% of PCC
1- 1 1/2% of PCC
1-5% of PCC
Instructions that supplement or modify drawings, specs, & general conditions of the contract.
Special Provisions
Supplementary Specs
Written Notice
Bid Bulletin
Addt’l info issued as an addition or amendment to provisions of specs.
Special Provisions
Supplementary Specs
Written Notice
Bid Bulletin
Info, advice or notification pertinent to the project
Special Provisions
Supplementary Specs
Written Notice
Bid Bulletin
Additional information on contract documents
Special Provisions
Supplementary Specs
Written Notice
Bid Bulletin
Shall mean “purchase and/or fabricate and deliver to the jobsite”
Provide
Furnish
Install
Fabricate
Shall mean, build in, mount in positions, connect or apply
Provide
Furnish
Install
Fabricate
Approved form of security furnished by the contractor as a guarantee to execute work in accordance with terms of the contract.
Payment Bond
Guarantee Bond
Performance Bond
Approved form of security furnished by the contractor as guarantee to pay all obligations arising from the contract
Payment Bond
Guarantee Bond
Performance Bond
Approved form of security furnished by the contractor to guarantee to the quality of materials and workmanship performed.
Payment Bond
Guarantee Bond
Performance Bond
Owner shall furnish contractor ______of drawings and specs for free.
2 sets
3 sets
5 sets
Contractor shall prepare at his own expense and submit _______ of all shop drawings to the architect, who will make the necessary corrections, and file the corrected copies.
2 sets
3 sets
5 sets
Drawings shall be accompanied by a letter of transmittal _________ containing name of project, contractor, number of drawings, titles and other pertinent data.
2 sets
3 sets
5 sets
_________will secure the occupancy permit.
Architect
Owner
Contractor
________is responsible for establishment of boundaries made by a licensed surveyor.
Architect
Owner
Contractor
Contractor shall furnish ________ of complete catalogue data for every item of equipment.
2 copies
3 copies
5 copies
A room of approx. ____ shall be provided for the use of the architect as office.
6 sqm
12 sqm
18 sqm
Plants needed to be transplanted within _________ must be done at the expense of the contractor.
50m
60m
70m
The supervisor must be a licensed engineer or architect who will work personally and inspect at least
Once a month
Once a week
Once every 2 weeks
Stakes, benchmarks placed by contractor shall be gradually preserved and maintained by the __________.
If such are displaced or damage due to neglect, it must be replace them at his own expense.
Architect
Owner
Contractor
The architect may examine work already completed before final acceptance. If work is found defective due to contractor’s fault, he shall defray all the expenses of such examination and satisfactory reconstruction. If work is found to be satisfactory, actual cost of labor and materials in examination plus ____ shall be allowed the contractor and granted extension time on account of additional work.
10%
15%
20%
30%
Adjustment of drawings to suit field conditions may be necessary during construction. The contract recognizes the essence of this as long as resulting overruns and underruns do not exceed _____ Discrepancies shall be submitted immediately to the architect before adjustments
15%
10%
5%
20%
Value of extra work shall be determined by unit prices stipulated in contract provided that the extra does not exceed _____ of the original contract details.or Actual direct cost plus 15% for contractor’s profit, overhead and contractor’s tax.
10%
15%
20%
30%
Claim of adjustment must be asserted within ________ from date of the order of change unless architect will extend the time.
7 days
10 days
15 days
30 days
If any instructions in drawings involve extra cost, the contractor will inform the architect through written notice within _______ after the receipt of such instruction
7 days
10 days
15 days
30 days
If delays incur in mobilization of work, the contractor must give the architect a written notice within ________ after recognition of delay and proceed to claim the extra cost.
7 days
10 days
15 days
30 days
The contractor shall execute at his own expense all work necessary for making good of known defects within the period of _______ after the issuance of the certificate of completion
30 days
10 days
15 days
60 days
Contractor will be allowed an extension based on the delay due to the employees of the owner and the owner himself, act of god or force majeure, delay by the architect pending arbitration, the contractor shall within ______ from the occurrence of such delay file the necessary request of extension for the approval of the architect.
30 days
10 days
15 days
60 days
Contractor shall submit written notice to the architect at least 10 days prior to beginning, suspending or resuming the work to the end that the architect may make preparations for inspection without delaying the work. All delays resulting from failure of the contractor are the contractor’s risk. All extra costs due to such delay will be deducted from the final payment.
30 days
10 days
15 days
60 days
The contractor shall, within 15 days from receipt of notice to proceed, submit a complete breakdown of work and corresponding value for approval and will be used as basis for all requests for payment.
30 days
10 days
15 days
60 days
Contractor shall complete all the work contracted in the time stated. Computation of the contract time shall commence on the ______ from receipt of the notice to proceed.
5th day
6th day
7th day
The contractor shall submit a request for payment for work done, not more than once each month. Each request shall be computed from the work completed on all items listed in the breakdown of work, less 10% retention.
2%
5%
7%
10%
When _____ of the contract has been accomplished, no retention shall be made.
10%
40%
50%
60%
Photograph size shall be ______. Four exposures shall be taken (2 copies for each exposure = 8), a total of 8 prints to be delivered to the architect, and all negatives bearing the date of exposure and name of work
4"x6"
6"x8"
6'x8'
4'x6'
______ upon receipt of the request for payment, the architect shall either issue a certificate of payment or withhold the request and inform the contractor in writing the reasons for withholding it. The certificate of payment shall include the value of work accomplished during the period of time covered by the certificate
15 days
10 days
7 days
Within ______ from the date of approval of a request for payment and issuance of certificate of payment, the owner shall pay the amount as certified, or such other amount he deems is due the contractor informing both the contractor and architect in writing his reasons for paying the amended amount.
15 days
10 days
7 days
No payments shall be made in excess of _______ of the contract price unless a notarized statement is submitted by the contractor to the effect that all bills for labor, other than current wages, and bills for materials have been paid.
85%
75%
65%
50%
Guarantee bond equivalent to ______ of the contract price covering a period of 1 year after the final acceptance of the work shall be issued by the contractor
15%
30%
50%
The amount retained by the owner shall be released ______s after the date of the final payment.
1 month
2 months
3 months
The contractor may suspend or terminate work upon ______ written notice to the owner and architect for the following:
Order of court or public authority caused the work to stop or suspension for 90 days through no act of the contractor and employees.
If architect fails to act upon request for payment within 15 days after presented.
If owner fails to act upon request for payment within 15 days after presented.
If owner fails to pay the contractor within 30 days after its award by arbitration.
7 days
15 days
30 days
A small elevator used to convey food or other goods from one floor of a building to another floor.
Sidewalk Elevator
Freight Elevator
Dumbwaiter
Inclined Elevator