1.

One of the duties of the Materials Engineer is to:

a)

Check the geometric control of the project

b)

Recommend to the Project Engineer remedial measures for the corrections of unsatisfactory conditions of materials

c)

Prepare As-Built-Plans

d)

To check the required equipment needed in the project

2.

Which of the following is a physical test of asphalt?

a)

Ductility Test

b)

Field Density Test

c)

Triaxial Test

d)

Abrasion Test

3.

Which of the following is not a manufactured asphalt?

a)

Blown Asphalt

b)

Liquid Asphalt

c)

Rock Asphalt

d)

Asphalt Cement

4.

The mineral filler which is used in the bituminous mix passes sieve number:

a)

60

b)

40

c)

200

d)

100

5.

Determines the effect of water on the cohesion of the bituminous mixture:

a)

Marshall Test

b)

Immersion-Compression Test

c)

Extraction Test

d)

Mechanical Size Analysis of Extracted Aggregates

6.

VMA means what?

a)

Voids in Material Aggregates

b)

Voids in Mineral Air

c)

Voids in Mineral Asphalt

d)

Voids in Mineral Aggregates

7.

The mixing temperature of bituminous mix is what?

a)

165°C

b)

163°C

c)

170°C

d)

100°C

8.

The average individual strength requirement of load bearing concrete masonry units is 5.5 MPa (800 psi). What is its average strength requirement?

a)

3.45 MPa (500 psi)

b)

5.5 MPa (800 psi)

c)

9.9 MPa (1440 psi)

d)

6.9 MPa (1000 psi)

9.

There are two layers in performing sampling of beam samples. How many number of blows are required per layer?

a)

25 blows

b)

75 blows

c)

63 blows

d)

50 blows

10.

The Materials Engineer of the contractor is directly under the supervision of the:

a)

Materials Engineer of the DPWH

b)

Project Engineer of the Consultant

c)

Project Engineer of the Contractor

d)

Head of Implementing Office