NEW
Font size
WorksheetsBldg Laws & Professional Practice of Architecture
Total questions: 40
Worksheet time: 24mins
Minimum size for habitable rooms (PD 1096)
14 sq.m.
6 sq.m.
12 sq.m.
4 sq.m.
Minimum width of doors (BP 344)
800 mm
900 mm
1000 mm
600 mm
In an architectural design competition, the Jury should not exceed _____ people. 4 of them shall be Architects.
5
6
7
8
Recommended Professional Fee (RPF) of a Group 1 Project
6% of PPC
10% of PPC
5.5% of PPC
5% of PPC
Housing project involving the construction of several residential units on a single site is under what Group/Project Classification?
Group 7
Group 10
Group 6
Group 11
Timeline of imprisonment of a person illegally practicing architecture in the Philippines
1 year and a half
5 months to 11 years
6 months to 1 year
6 months to 6 years
SPP Document 204-B
Professional Consultation
Fulltime Supervision
Construction Management
Post-Construction
Verifications and certifications of lines and levels from a licensed surveyor shall certified to the architect within ___ hours from discovery (UAP DOC 301)
16 hrs
42 hrs
24 hrs
64 hrs
Within ___ days, the building owner must have a written explanation after the receipt of notice about any building code violations from authorities (OBO)
10 days
5 days
6 days
4 days
Start of contract time after receipt of NTP (UAP Doc 301)
1 day
7 days
10 days
15 days
Certificate of Occupancy must be issued ______ after final inspection
30 days
60 days
4 months
3 days
Contractor is responsible for all defects caused by faulty materials and workmanship within _____
2 years
60 days
6 months
1 year
The occupant load of a classroom as based on PD 1096
1.80 sqm/person
1.90 sqm/person
4.60 sqm/person
3.25 sqm/person
The occupant load of a classroom as based on RA 9514
1.80 sqm/person
1.90 sqm/person
11.10 sqm/person
28 sqm/person
Based on Rule 8 of NBC, under Table 8.G.1 Easement Along Bodies/Way by Location, what is the minimum width of easement required for agricultural areas?
3m wide
11m wide
20m wide
30m wide
The maximum height to be allowed for buildings/structures based on their proposed use or occupancy
Building Height Limit
Building Height Limitation
Building Height Restriction
Building Height Standard
What is the Minimum Required Parking Slot for a motel
1 car slot for every 2 units
1 car slot for every 20 beds
1 car slot for every 5 rooms
1 car slot for every unit
Formula in getting for the GFA of the building
GFA = TLA x PSO
GFA = TLA / FLAR
GFA = TLA x FLAR
GFA = TLA x multiplier
the width of the yard
USA
setback
buffer
dimension
Minimum lot area for a single-detached unit under Socialized Housing
64 sqm
72 sqm
46 sqm
27 sqm
How are you?
If left open for more than ____, excavations will result in grave violations
120 days
100 days
365 days
10 days
SPP Document 204-A
FULLTIME SUPERVISION
CONSTRUCTION MANAGEMENT
SPECIALIZED ARCHITECTURAL SERVICES
DESIGN-BUILD
Release of Retention after the date of final payment
30 days
3 days
3 months
3 weeks
How much the number of people can possibly occupy an office with an area of 200sq.m. and 2.4m ceiling height?
200 persons
100 persons
50 persons
40 persons
Open space requirement for interior lot.
10% of lot area
50% of Lot area
20% of lot area
60% of lot area
Open space requirement for a corner lot or through lot.
50% of lot area
30% of lot area
20% of lot area
10% of lot area
Minimum width of a passageway connecting a street and a court. (PD 1096)
1.20 mts.
1.10 mts.
1.25 mts.
1.26 mts.
Minimum Dimension of a kitchen. (PD 1096)
3 sqm
3 mts.
1.50 mts.
1.50 sqm
Bounded on all sides or around its periphery by building lines.
setback
yard
open space
inner court
According to the compensation guidelines, how much of the architect’s fee is for the civil liability for the design mandated by Article 1723 of the Civil Code?
15%
10%
5%
Not specified in the guidelines
What is the standard progress of payment for an Architect’s fee based on project phase?
5%-10%-35%-85%-95%-100%
5%-15%-35%-85%-95%-100%
5%-20%-40%-90%-100%
5%-15%-35%-85%-100%
A Client is very happy with the Plans his Architect made for his house. He decided that he will use the same Design/Plans for his son’s house. How much will the Client pay the Architect for this 2nd house?
90% of RPF
80% of RPF
70% of RPF
50% of RPF
For a simple residential project, how much of the Project Cost will you allocate for Material Costs?
70%
60%
55%
65%
In a two (2)-stage architectural design competition, who is eligible to receive an honorarium?
A competitor who placed seventh in the overall competition rankings
A competitor who was shortlisted for the second stage of the competition
A competitor who submitted a highly detailed scale model of his/her design
A competitor who reluctantly joined at the request of the owner
What is the minimum width of door for RA 9514?
800mm
800mm
815mm
710mm
What is the maximum riser of stairs for BP 220?
200mm
300mm
250mm
150mm
What is the maximum cross slope ratio on-ramp for RA 9514?
1:48
1:50
1:45
1:60
What is the occupant load (area per person) for children's nurseries for PD 1096?
1.80 sqm
3.25 sqm
0.50 sqm
2.60 sqm
What is the maximum length of dead ends for BP 344?
2.50m
1.50m
3.50m
5.50m
