WorksheetsMOC PRAC REFRESHER P1
Total questions: 50
Worksheet time: 25mins
Under RA 8293 prescribing the Intellectual property Code, under what chapter will you find that Architectural works are Original Works and are protected from the moment of their creation.
Chapter I
Chapter II
Chapter III
Chapter IV
If an architect is hired to design a supermarket with construction cost of 40M pesos, how much should he/she charge as Recommended Professional Fee under a DAEDS (Detailed Architectural and Engineering Design Services) arrangement?
5%
6%
7%
8%
Why does an Architect need an Accountant?
To know if he/she is financially stable
To keep his books and accounts in order
To hide his income
To prepare his/her SALN
If the owner requests additional work (e.g. revisions in construction drawings) from the architect due to change orders, what method of compensation should the Architect employ?
Cost Method
Lump Sum
Percentage of Construction Cost
Time-based method like MDPE
The material specified in the contract is not readily available in the market and waiting for it will incur a substantial delay and consequently losses. Who can have it replaced by a suitable material?
Contractor
Architect-In-Charge of Construction
Architect-of-Record
Owner
An Architect makes a miniature model of the project for his own design study. Who should pay for it?
Architect
Project Manager
Contractor
Owner
According to the compensation guidelines, how much of the architect’s fee is for the civil liability for the design mandated by Article 1723 of the Civil Code?
15%
10%
5%
Not specified in the guidelines
What is the standard progress of payment for an Architect’s fee based on project phase?
5%-10%-35%-85%-95%-100%
5%-15%-35%-85%-95%-100%
5%-20%-40%-90%-100%
5%-15%-35%-85%-100%
Which is NOT a standard method of payment for Pre-Design Services?
Multiple of Direct Personnel Expenses
Professional Fee Plus Expenses
Percentage of Project Construction Cost
Lump Sum or Fixed Fee
After the initial meeting/conversation/correspondence with the Client, the Architect must now submit his proposal for pre-design services which does not include:
Scope of Works
Manner of Payment
Owner’s Responsibilities
Project Construction Cost
Who is responsible for the compensation of specialized architectural services (e.g. architectural interiors, acoustic design, etc.)?
Architect
Owner
Contractor
Sub-Contractor
A Client hires an Architect to prepare the Plans and corresponding Documents for his project. However, after the completion of all Plans and Documents and eventual submission/acceptance, the Client changes his mind and decided not to implement the Plans for construction. How much is the Architect compensated?
85%
60%
75%
90%
A Client is very happy with the Plans his Architect made for his house. He decided that he will use the same Design/Plans for his son’s house. How much will the Client pay the Architect for this 2nd house.
90% of RPF
80% of RPF
70% of RPF
50% of RPF
Who is responsible for the fee of an additional Full-time Supervisor at the Project?
Architect
Owner
Contractor
Sub-contractor
A full-time supervisor hired by the Owner should report technical matters to the
Architect
Owner
Contractor
No one. He is the supervisor.
A full-time supervisor hired by the Owner on behalf of the Architect-of-Record is called
Site Architect
Site Inspector
Project Representative
Project Engineer
If an Architect is hired as a Facilities Manager, how is he compensated?
Lump Sum
Salary
Gross Rental %
Retainer Fee
For a simple residential project, how much of the Project Cost will you allocate for Material Cost?
70%
60% - for general project
55%
65%
For a simple residential project, how much of the Project Cost will you allocate for Labor Cost?
30%
40% - for general project
25%
35%
For a simple residential project, how much of the Project Cost will you allocate for Contingencies?
5%
10%
15%
20%
When the architect’s fee is a percentage of the construction cost, the fee should ultimately be a percentage of which?
Probable Project Construction Cost
Awarded Project Construction Cost
Final Project Construction Cost
Estimated Project Construction Cost
When the architect is hired to prepare a physical plan for a project 5 hectares in area, how much is the Recommended Professional Fee?
PHP 120K
PHP 150K
PHP 180K
PHP 250K
In a design-build arrangement, who pays for the cost of permits and required licenses for construction?
The architect
The owner
The excavation contractor
The project manager
In architectural design competitions, the professional advisor is a licensed architect whose main function is to organize the competition for the owner. How is the professional advisor remunerated?
He receives a retainer fee
He receives a monthly honorarium
He receives a percentage of the amount of the first prize
None, because being a professional advisor is pro bono work
In a two (2)-stage architectural design competition, who is eligible to receive an honorarium?
A competitor who placed seventh in the overall competition rankings
A competitor who was shortlisted for the second stage of the competition
A competitor who submitted a highly detailed scale model of his/her design
A competitor who reluctantly joined at the request of the owner
Architect A advised her Client C that payments must be made on time because otherwise, an interest will be imposed. When is a payment considered late?
If the client does not make a payment within 7 days of receipt of billing
If the client does not make a payment within 15 days of receipt of billing
If the client does not make a payment within 30 days of receipt of billing
If the client does not make a payment within 3 months of receipt of billing
After the Owner and Architect agree on the Plans and other Drawings, what is next?
Collect 5% Proposal Fee
Service Agreement
Memorandum of Understanding
Memorandum of Agreement
It is a group creativity technique by which efforts are made to find a solution for a specific problems through the exchange of ideas spontaneously contributed by its participants.
Discussion
Conceptualization
Meeting
Brainstorming
An architect needs to show his client the entirety of the project in full 3D and realistic form, what is the best way to do this?
Animation
Scale Model
Perspective
SketcheS
A low-budget presentation
Animation
Scale Mode
Sketches
Blueprints
If the Project’s budget is constrained, what means should be used to achieve 3D understanding of the project?
Manual Sketch
Scale Model
Animation
Blueprints
Which is NOT part of Pre-Design Services (SPP Doc 201)?
Feasibility Studies
Equipment Evaluation
Consultation
Site Selection and Analysis
Which is NOT part of Pre-Design Services (SPP Doc 201)?
Space Planning
Space Management
Architectural Research
Schematic Design
Architectural Programming, Research, Site Selection and Analysis, Feasibility Studies, Space Planning, Space Management and Value Management, etc are part of what services?
Specialized Architectural Services
Pre-Design Services
Comprehensive Arch’l Services
Fulltime Services
Which is NOT part of Pre-Design Services (SPP Doc. 201)?
Site Selection and Analysis
Site Utilization and Land-use Studies
Urban Planning
Space Management Studies
The detailed analysis of the site that involves the identification of a site’s development potentials through the proper utilization of land. It covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs.
Feasibility Study
Site Selection and Analysis
Environmental Impact Study
Site Utilization & Land-Use Study
What type of architectural service is provided for site utilization and feasibility studies?
Regular Design Services
Pre-Design Services
Specialized Architectural Service
Pre-Construction Services
Which is NOT part of Specialized Architectural Services (SPP Doc. 203)?
Architectural Interiors
Acoustic Design
Site Development Planning
Site Utilization
Under Regular Design Services (SPP Doc 202), what comes next after Design Development Phase?
Contract Document Phase
Bidding Negotiation Phase
Construction Phase
Project Definition Phase
Which is NOT part of Regular Design Services (SPP Doc 202)?
Design Development
Architectural Programming
Contract Document
Schematic Design
When must the Architect properly locate/site a building with respect to the Road Right-of-Way (RROW), legal easement and the like?
Answer not among the choices
At the Schematic Design Phases of the work
During Contract Documentation
Sometime during Design Development
When must the Architect apply the pertinent principles and techniques of orienting a building in the Philippine setting?
During Contract Documentation
Sometime during Design Development
At the Schematic Design Phase of the work
Answer not among the choices
When must the Architect properly locate/ site a building with respect to natural and man-made hazards that may be found or proximate to the site and like consideration?
Answer not among the choices
During Contract Documentation
Sometime during Design Development
At the Schematic Design Phase of the work
When must the Architect properly apply the pertinent principles and techniques of Tropical Design to match the hot-humid tropical environment in the Philippines?
Sometime during Design Development
During Contract Documentation
At the Schematic Design phases of the work
Answer not among the choices
When must the Architect properly locate/site a building with respect to the topography of a site, natural drainage characteristics of a site and the like?
Answer not among the choices
During Contract Documentation
At the Schematic phase of the work
Sometime during Design Development
At what stage does the provisions for the Fire Code Requirement adopted?
Schematic
Project Definition
Design Development
Contract Document
During what stage are the provisions of BP 344 adopted?
Schematic
Project Definition
Design Development
Contract Document
During which stage are the provisions of the National Building Code incorporated into the design?
Schematic
Project Definition
Design Development
Contract Document
Where does Planning Services fall?
Regular Services
Special (Allied) Services
Specialized Architectural Services
Design and Planning Services
What Architectural Service/Phase is the part where the Architect and Client are choosing the Contractor?
Contract Document Phase
Construction Phase
Design Development Phase
Bidding or Negotiation Phase