MOC PRAC REFRESHER P1

Total questions: 50

Worksheet time: 25mins

Name
Class
Date
1.

Under RA 8293 prescribing the Intellectual property Code, under what chapter will you find that Architectural works are Original Works and are protected from the moment of their creation.

a)

Chapter I

b)

Chapter II

c)

Chapter III

d)

Chapter IV

2.

If an architect is hired to design a supermarket with construction cost of 40M pesos, how much should he/she charge as Recommended Professional Fee under a DAEDS (Detailed Architectural and Engineering Design Services) arrangement?

a)

5%

b)

6%

c)

7%

d)

8%

3.

Why does an Architect need an Accountant?

a)

To know if he/she is financially stable

b)

To keep his books and accounts in order

c)

To hide his income

d)

To prepare his/her SALN

4.

If the owner requests additional work (e.g. revisions in construction drawings) from the architect due to change orders, what method of compensation should the Architect employ?

a)

Cost Method

b)

Lump Sum

c)

Percentage of Construction Cost

d)

Time-based method like MDPE

5.

The material specified in the contract is not readily available in the market and waiting for it will incur a substantial delay and consequently losses. Who can have it replaced by a suitable material?

a)

Contractor

b)

Architect-In-Charge of Construction

c)

Architect-of-Record

d)

Owner

6.

An Architect makes a miniature model of the project for his own design study.  Who should pay for it?

a)

Architect

b)

Project Manager

c)

Contractor

d)

Owner

7.

According to the compensation guidelines, how much of the architect’s fee is for the civil liability for the design mandated by Article 1723 of the Civil Code?

a)

15%

b)

10%

c)

5%

d)

Not specified in the guidelines

8.

What is the standard progress of payment for an Architect’s fee based on project phase?

a)

 5%-10%-35%-85%-95%-100%

b)

 5%-15%-35%-85%-95%-100%

c)

5%-20%-40%-90%-100%

d)

5%-15%-35%-85%-100%

9.

Which is NOT a standard method of payment for Pre-Design Services?

a)

Multiple of Direct Personnel Expenses

b)

Professional Fee Plus Expenses

c)

Percentage of Project Construction Cost

d)

Lump Sum or Fixed Fee

10.

After the initial meeting/conversation/correspondence with the Client, the Architect must now submit his proposal for pre-design services which does not include:

a)

Scope of Works

b)

Manner of Payment

c)

Owner’s Responsibilities

d)

Project Construction Cost

11.

Who is responsible for the compensation of specialized architectural services (e.g. architectural interiors, acoustic design, etc.)?

a)

Architect

b)

Owner

c)

Contractor

d)

Sub-Contractor

12.

A Client hires an Architect to prepare the Plans and corresponding Documents for his project. However, after the completion of all Plans and Documents and eventual submission/acceptance, the Client changes his mind and decided not to implement the Plans for construction. How much is the Architect compensated?

a)

85%

b)

60%

c)

75%

d)

90%

13.

A Client is very happy with the Plans his Architect made for his house. He decided that he will use the same Design/Plans for his son’s house. How much will the Client pay the Architect for this 2nd house.

a)

90% of RPF

b)

80% of RPF

c)

70% of RPF

d)

50% of RPF

14.

Who is responsible for the fee of an additional Full-time Supervisor at the Project?

a)

Architect

b)

Owner

c)

Contractor

d)

Sub-contractor

15.

A full-time supervisor hired by the Owner should report technical matters to the

a)

Architect

b)

Owner

c)

Contractor

d)

No one. He is the supervisor.

16.

A full-time supervisor hired by the Owner on behalf of the Architect-of-Record is called

a)

Site Architect

b)

Site Inspector

c)

Project Representative

d)

Project Engineer

17.

If an Architect is hired as a Facilities Manager, how is he compensated?

a)

Lump Sum

b)

Salary

c)

Gross Rental %

d)

Retainer Fee

18.

 For a simple residential project, how much of the Project Cost will you allocate for Material Cost?

a)

70%

b)

60% - for general project

c)

55%

d)

65%

19.

For a simple residential project, how much of the Project Cost will you allocate for Labor Cost?

a)

30%

b)

 40% - for general project

c)

25%

d)

 35%

20.

For a simple residential project, how much of the Project Cost will you allocate for Contingencies?

a)

 5%

b)

10%

c)

15%

d)

 20%

21.

When the architect’s fee is a percentage of the construction cost, the fee should ultimately be a percentage of which?

a)

Probable Project Construction Cost

b)

Awarded Project Construction Cost

c)

 Final Project Construction Cost

d)

Estimated Project Construction Cost

22.

When the architect is hired to prepare a physical plan for a project 5 hectares in area, how much is the Recommended Professional Fee?

a)

PHP 120K

b)

PHP 150K

c)

PHP 180K

d)

PHP 250K

23.

In a design-build arrangement, who pays for the cost of permits and required licenses for construction?

a)

The architect

b)

The owner

c)

The excavation contractor

d)

The project manager

24.

In architectural design competitions, the professional advisor is a licensed architect whose main function is to organize the competition for the owner. How is the professional advisor remunerated?

a)

He receives a retainer fee

b)

He receives a monthly honorarium

c)

He receives a percentage of the amount of the first prize

d)

None, because being a professional advisor is pro bono work

25.

In a two (2)-stage architectural design competition, who is eligible to receive an honorarium?

a)

A competitor who placed seventh in the overall competition rankings

b)

A competitor who was shortlisted for the second stage of the competition

c)

A competitor who submitted a highly detailed scale model of his/her design

d)

A competitor who reluctantly joined at the request of the owner

26.

Architect A advised her Client C that payments must be made on time because otherwise, an interest will be imposed. When is a payment considered late?

a)

If the client does not make a payment within 7 days of receipt of billing

b)

If the client does not make a payment within 15 days of receipt of billing

c)

If the client does not make a payment within 30 days of receipt of billing

d)

If the client does not make a payment within 3 months of receipt of billing

27.

After the Owner and Architect agree on the Plans and other Drawings, what is next?

a)

Collect 5% Proposal Fee

b)

Service Agreement

c)

Memorandum of Understanding

d)

Memorandum of Agreement

28.

It is a group creativity technique by which efforts are made to find a solution for a specific problems through the exchange of ideas spontaneously contributed by its participants.

a)

Discussion

b)

Conceptualization

c)

Meeting

d)

Brainstorming

29.

An architect needs to show his client the entirety of the project in full 3D and realistic form, what is the best way to do this?

a)

Animation

b)

Scale Model

c)

Perspective

d)

SketcheS

30.

A low-budget presentation

a)

Animation

b)

Scale Mode

c)

Sketches

d)

Blueprints

31.

If the Project’s budget is constrained, what means should be used to achieve 3D understanding of the project?

a)

Manual Sketch

b)

Scale Model

c)

Animation

d)

Blueprints

32.

Which is NOT part of Pre-Design Services (SPP Doc 201)?

a)

Feasibility Studies

b)

Equipment Evaluation

c)

Consultation

d)

Site Selection and Analysis

33.

Which is NOT part of Pre-Design Services (SPP Doc 201)?

a)

Space Planning

b)

Space Management

c)

Architectural Research

d)

Schematic Design

34.

Architectural Programming, Research, Site Selection and Analysis, Feasibility Studies, Space Planning, Space Management and Value Management, etc are part of what services?

a)

Specialized Architectural Services

b)

Pre-Design Services

c)

Comprehensive Arch’l Services

d)

Fulltime Services

35.

Which is NOT part of Pre-Design Services (SPP Doc. 201)?

a)

Site Selection and Analysis

b)

Site Utilization and Land-use Studies

c)

Urban Planning

d)

Space Management Studies

36.

The detailed analysis of the site that involves the identification of a site’s development potentials through the proper utilization of land. It covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs.

a)

Feasibility Study

b)

Site Selection and Analysis

c)

Environmental Impact Study

d)

Site Utilization & Land-Use Study

37.

What type of architectural service is provided for site utilization and feasibility studies?       

a)

 Regular Design Services

b)

Pre-Design Services

c)

Specialized Architectural Service

d)

Pre-Construction Services

38.

Which is NOT part of Specialized Architectural Services (SPP Doc. 203)?

a)

Architectural Interiors

b)

Acoustic Design

c)

Site Development Planning

d)

Site Utilization

39.

Under Regular Design Services (SPP Doc 202), what comes next after Design Development Phase?

a)

Contract Document Phase

b)

Bidding Negotiation Phase

c)

Construction Phase

d)

Project Definition Phase

40.

Which is NOT part of Regular Design Services (SPP Doc 202)?

a)

Design Development

b)

Architectural Programming

c)

Contract Document

d)

Schematic Design

41.

When must the Architect  properly locate/site a building with respect to the Road Right-of-Way (RROW), legal easement and the like?

a)

Answer not among the choices

b)

At the Schematic Design Phases of the work

c)

During Contract Documentation

d)

Sometime during Design Development

42.

When must the Architect apply the pertinent principles and techniques of orienting a building in the Philippine setting?

a)

During Contract Documentation

b)

Sometime during Design Development

c)

At the Schematic Design Phase of the work

d)

Answer not among the choices

43.

When must the Architect properly locate/ site a building with respect to natural and man-made hazards that may be found or proximate to the site and like consideration?

a)

Answer not among the choices

b)

During Contract Documentation

c)

Sometime during Design Development

d)

At the Schematic Design Phase of the work

44.

When must the Architect properly apply the pertinent principles and techniques of Tropical Design to match the hot-humid tropical environment in the Philippines?

a)

Sometime during Design Development

b)

During Contract Documentation

c)

 At the Schematic Design phases of the work

d)

Answer not among the choices

45.

When must the Architect properly locate/site a building with respect to the topography of a site, natural drainage characteristics of a site and the like?

a)

Answer not among the choices

b)

During Contract Documentation

c)

At the Schematic phase of the work

d)

Sometime during Design Development

46.

At what stage does the provisions for the Fire Code Requirement adopted?

a)

Schematic

b)

Project Definition

c)

Design Development

d)

Contract Document

47.

During what stage are the provisions of BP 344 adopted?

a)

Schematic

b)

Project Definition

c)

Design Development

d)

Contract Document

48.

During which stage are the provisions of the National Building Code incorporated into the design?

a)

Schematic

b)

Project Definition

c)

Design Development

d)

Contract Document

49.

Where does Planning Services fall?

a)

Regular Services

b)

Special (Allied) Services

c)

Specialized Architectural Services

d)

Design and Planning Services

50.

What Architectural Service/Phase is the part where the Architect and Client are choosing the Contractor?

a)

Contract Document Phase

b)

Construction Phase

c)

Design Development Phase

d)

Bidding or Negotiation Phase