Government agency for “street dwellers”
NHA
HUDCC
LGU
DSWD
Government agency liable for the lack of public transport
LTO
DPWH
LTFRB
DOTr
Government agency for “slum dwellers”
NHA
HUDCC
DSWD
LGU
Government agency tasked to build Jails
LGU
BuCor
BJMP
DPWH
Where will you have a Subdivision Plan approved?
HUDCC
HLURB
NHA
Local Government Unit
What plan is approved by HLURB after such is adopted by the Sangguniang Bayan/ Panlungsod?
Subdivision Plan
Site Development Plan
Comprehensive Land Use Plan
It is the lead agency in the provision of technical assistance to local government units in the preparation of comprehensive land use plans; regulation of housing, land development and homeowners association; and adjudications of disputes related thereto. It is run by a 9-man Board headed by an ex-official Chairman of whoever is the Chairman of the HUDCC.
NHA
HLURB
NHMFC
HGC
It is tasked to formulate national objectives for housing and urban development and to design broad strategies for the accomplishment of these objectives; to determine the participation and coordinate the activities of the key government housing agencies in the national housing program; to monitor, review and evaluate the effective exercise by these agencies of their assigned functions; to assist in the maximum participation of the private sector in all aspects of housing and urban development and to recommend new legislation and amendments to existing laws as may be necessary for the attainment of government’s objectives in housing.
NHA
HUDCC
NEDA
HLURB
It is charged with the main function of coordinating government housing agencies to ensure the accomplishment of the National Shelter Program.
NHA
HUDCC
NEDA
HLURB
A government agency that ensures food security
NFA
Dept of Agriculture
NEDA
IFO
Group A Dwellings under PD 1096 on an inside lot should occupy no more than how many percent of the lot?
90%
80%
70%
60%
For Group A Dwellings, the minimum design load for the Floor at the First Floor shall be
100 kg/sqm
150 kg/sqm
200 kg/sqm
250 kg/sqm
For Group A Dwellings, the minimum design load for the Floor at the First Floor shall be
a. 100 kg/sqm.
150 kg/sqm
200 kg/sqm
250 kg/sqm
For Group A Dwellings, the minimum design Wind Load for the Roofs shall be
1
2
3
4
21. Under PD 1096, the following belongs to Group E except
Open Parking Garage
Gasoline Station
Police Station
Ice Plant
Under the NBC, what is the minimum dimension of a kitchen?
1.5m
2m
1.20m
0.90m
Under the NBC, what is the minimum area of a kitchen?
6 sqm
3 sqm
1.20 sqm
8 sqm
Under the NBC, what is the minimum area of a room for Human Habitation?
6 sqm
3 sqm
1.20 sqm
8 sqm
Under the NBC, what is the minimum area for a T & B?
6 sqm
3 sqm
1.20 sqm
8 sqm
Under the NBC, what is the minimum dimension of a room for Human Habitation?
6 sqm
2 m
1.20 m
0.60 m
What is the minimum headroom when a duct crosses the hallway?
2.36 m
2.10 m
2.63 m
2.21 m
What is the minimum dimension of a PWD toilet?
1.70 m
1.80 m
1.50 m
1.60 m
The minimum size of a PWD toilet?
1.50 x 1.70
1.60 x 1.80
1.60 x 1.70
1.70 x 1.80
Ideal height drop (depression) for floor of shower area?
½”
1”
75 mm
10 mm
Under PD 957 and BP 220, how many units shall be the maximum number for row houses per block/ cluster?
15
20
10
30
Under BP 220, the maximum length of a Block is 400 meters. However, Block lengths exceeding 250 meters should be provided with an Alley approximately at midlength. How wide is this alley?
1.50 m
2.00 m
3.00 m
5.00 m
Under BP 220, it shall have a width of 3.00m intended only to provide pedestrian access to property for socialized housing projects. It shall have a maximum length of 60 meters.
Alley
Pathwalk
Sidewalk
Collector
A public way with a width of 2.0m intended to break a block and to serve both pedestrian and emergency vehicles, both ends connecting always to streets. It shall not be used as an access to property.
Pathwalk
Street
Sidewalk
Alley
Under PD 957, what is the minimum lot frontage for Row Houses?
8m
3.5m
4m
6m
What is the minimum RROW for access to Interior Lots?
3m
4m
6m
5m
The minimum width of the sidewalk for a RROW width of 9.00 meters or more shall be_____ on each side of the RROW.
0.50m
0.60m
1.00m
1.20m
Which of the following is not part of RROW?
Curb
Sidewalk
Yard
Carriageway
Space left in a lot between the building and the property line
Court
Building Line
Yard
Dispersal Area
Motor Courts shall have a right-of-way of not less than ____ in width with provision for sufficient space for vehicular turn around, e.g., cul-de-sac, loop, branch, etc.
5m
6m
9m
10m
Major roads for projects 2.5 hectares and below shall have a ROW of
8m
9m
10m
12m
Minor roads for projects 5-10 hectares shall have a ROW of
8m
9m
10m
12m
Major roads for projects 5-10 hectares shall have a ROW of
8m
9m
10m
12m
Collector roads for projects above 30 hectares shall have a ROW of
8m
9m
10m
12m
For services involving creative work, which method of compensation is appropriate?
MDPE
Percentage of PCC
Percentage of PDC
Fixed hourly fee
For a renovation project, the architect was hired to produce a furniture layout and new floor, wall, and ceiling finishes. What service did the architect render?
Architectural Interiors
Interior Design
Architectural Fit-out
Interior Decoration
In project renovation, how is the architect supposed to be compensated?
Multiple of Direct Personnel Expense
Percentage of Cost of Work
Professional Fee + Expenses
Fee shall be built into the construction cost
The architect has completed the contract documents and the contractor is now ready to begin construction. To ensure that the construction of the house will proceed smoothly, the client asked the architect to supervise the construction full-time, at a minimum of 8 hours per day, 5 days per week. Should the architect charge an additional fee for this?
No, because the architect is not allowed to perform supervision work. The supervisor must be a civil engineer.
No, because periodic site supervision is already part of the architect’s regular design service.
Yes, because full-time supervision work is not part of the regular design service.
Both A and B
How should the architect charge for the service if the client asked the architect to supervise the construction in full time?
No additional fee should be collected other than the fee for regular design services
1.0-1.5% of the PCC
1.5-3.0% of the PCC
MDPE
Lupita is a licensed architect whose clients are often repeat customers due to how diligently she adheres to deadlines and her consistently good work. One of her very satisfied clients is another licensed architect who regularly outsources to her drafting projects where Lupita performs drafting/CAD work, with the client providing all the creative input. What is the recommended method of compensation for this ?
6% of PCC if the PCC is 50M or less
Professional Fee + Expenses
Honorarium
Unit Cost
Roof covering for all buildings shall be either fire-retardant or ordinary depending upon the fire-resistive requirements of the particular type of construction. Is the use of Combustible Roof Insulation allowed?
No under NBCP
Yes if covered with approved roof covering applied directly thereto
No under FCP