MOC PRAC REFRESHER P2

Total questions: 50

Worksheet time: 25mins

Name
Class
Date
1.

If an Architect assumes the function of going to the project site for monitoring and supervision, what services is being provided?

a)

 Full-time project supervision

b)

Project supervision

c)

Construction Management

2.

At what stage are specifications done?

a)

 Design Development Phase

b)

Contract Document Phase

c)

 Schematic Design Phase

d)

Project Definition Phase

3.

At what phase will the Architect prepare the Architectural layout for Electrical, Mechanical and Plumbing Systems?

a)

 Project Definition Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Contract Document Phase

4.

After completion of contract drawings, specifications and other documents upon submission to a client, what stage did you just complete?

a)

 Contract Document Phase

b)

Construction Phase

c)

 Bidding or Negotiation Phase

d)

Design Development Phase

5.

You just submitted to the client the complete set of plans and specifications. Upon his acceptance, what is the next step?

a)

Bidding/Selection of Contractor

b)

Negotiate amount of your fee

c)

Present Scope of Works

d)

Construction

6.

Who can sign as the Professional In-charge of Construction?

a)

Master Plumber

b)

Architect

c)

Environmental Planner

d)

Mechanical Engineer

7.

A large project sometimes requires different phases involving different architects/consultants per phase. A Concept Architect does the overall concept of the project. What is his liability?

a)

Same as the Architect-of-Record

b)

 He has no liability

c)

He has civil/administrative liability

d)

They all share the same liability

8.

Who has a Civil Liability under Article 1723 of the Civil Code for the Architectural documents of a project?

a)

Architect-of-Record

b)

 Consulting Architect

c)

 Architect-in-Charge of Construction

d)

Civil Engineer

9.

Who is NOT liable under Article 1723 of the Civil Code?

a)

Architect-of-Record

b)

Consulting Architect

c)

Architect-in-Charge of Construction

d)

 Contractor

10.

For how many years is the Civil Liability under Article 1723 of the Civil Code?

a)

10

b)

15

c)

20

d)

25

11.

Under Article 1723 of the Civil Code, what is the prescription period for filing of cases if a building collapses?

a)

1 year

b)

5 years

c)

10 years

d)

15 years

12.

A Registered and Licensed Architect permitted to practice under RA 9266 who is Professionally and Academically qualified and WITH exceptional or recognized expertise or specialization in any branch of architecture.

a)

Architect-of-Record

b)

Architect-in-Charge of Construction

c)

Consulting Architect

d)

Contractor

13.

A registered and licensed architect who is directly and professionally responsible for the total design of the project for the client and assumes the civil liability for the plans, specifications and contract documents he/she has signed and sealed.

a)

Principal Architect

b)

Managing Architect

c)

 Architect-Of-Record

d)

Project Architect

14.

Who is responsible for the Site Development Plan?

a)

Architect

b)

Civil Engineer

c)

Environmental Planner

d)

 Landscape Architect

15.

When an Architect-in-charge of construction does not directly supervise, he

a)

Fined

b)

Penalized

c)

 can Delegate

16.

Who gives the directive to start the project?

a)

 Architect

b)

Owner

c)

 Project Manager

d)

Contractor

17.

The following needs to be signed and sealed by the architect except

a)

Reflected Ceiling Plan

b)

Foundation Plan

c)

Site Development Plan

d)

Technical Specifications

18.

Who is responsible for preparing the Bill of Materials?

a)

Contractor

b)

 Architect

c)

Owner

d)

Project Manager

19.

Who “locates” the points

a)

 Architect

b)

Geodetic Engineer

c)

Civil Engineer

d)

Geotechnical Engineer

20.

After initial inspection of the jobsite, you discovered that the Owner of the adjacent property seems to be encroaching on your client’s property. It was agreed upon that in order to correctly determine the boundaries, your client will hire and pay for the services of a Geodetic Engineer to do a survey for the lot. How much should your client pay for the survey?

a)

PHP 2000-5000

b)

PHP 6000-9000

c)

PHP 7000-10000

d)

PHP 12000-15000

21.

Who determines time and cost of the project?

a)

Project manager

b)

General contractor

c)

 Owner

d)

 Architect

22.

Who is responsible for shortening the time and lessening the cost of the project

a)

 Architect

b)

 Project Manager

c)

Contractor

d)

 Client

23.

Who owns the Plans?

a)

Engineer

b)

 Architect

c)

 Owner

d)

 Contractor

24.

A Plan is drawn by a company Draftsman under the supervision of a Registered and Licensed Architect (RLA). Who owns the said document?

a)

 Draftsman

b)

 RLA

c)

Company

d)

Client

25.

Who keeps the record on site?

a)

Owner

b)

 Architect

c)

 Supervisor

d)

Contractor

26.

Who prepares As-Built plans?

a)

 Contractor

b)

Architect

c)

 Engineer

27.

 Who prepares the Shop drawings?

a)

 Contractor

b)

 Architect

c)

Engineer

d)

Supplier

28.

Who checks the Shop Drawings?

a)

Contractor

b)

Architect

c)

 Engineer

d)

Supplier

29.

Who performs Soil Investigation on site?

a)

 Contractor

b)

 Architect

c)

Geodetic Engineer

d)

Civil Engineer

30.

Who usually secures the Building Permit and pays for it?

a)

 Architect

b)

Contractor

c)

Engineer

d)

Owner

31.

Who is the applicant of a Building Permit?

a)

Architect

b)

Contractor

c)

Engineer

d)

Owner

32.

Approval of Samples of Finishing Materials is the sole function of the

a)

 Architect

b)

 Contractor

c)

Engineer

d)

 Owner

33.

Who is responsible for shortening the time of construction?

a)

 Architect

b)

Construction Manager

c)

 Construction Supervisor

d)

 Foreman

34.

Who is the RLP (Registered and Licensed Professional) required to sign the Architectural Drawings of the house?

a)

Project Manager

b)

Structural Engineer

c)

Registered and Licensed Architect

d)

Registered and Licensed Civil Engineer

35.

Who is the RLP (Registered and Licensed Professional) required to sign the Specification Documents of the house?

a)

 Draftsman

b)

Structural Engineer

c)

Registered and Licensed Architect

d)

Registered and Licensed Civil Engineer

36.

Who is the RLP (Registered and Licensed Professional) required to sign the Electrical Plans of the house?

a)

Master Electrician

b)

Electrician

c)

 Registered and Licensed Electrical Engr.

d)

None of the above

37.

Who is the RLP (Registered and Licensed Professional) required to sign the Structural Plans of the house?

a)

 Civil Engineer

b)

Architect

c)

 Registered and Licensed Architect

d)

Registered and Licensed Civil Engineer

38.

Who is the RLP responsible to design the T&B Layout Plans of the house?

a)

Registered and Licensed Architect

b)

Registered Master Plumber

c)

Registered and Licensed Sanitary Engineer

d)

None of the above

39.

Who is the RLP responsible to design the Kitchen Layout Plans of the house?

a)

Registered and Licensed Architect

b)

Registered Master Plumber

c)

Sanitary Engineer

d)

None of the above

40.

Who is the RLP responsible for the Architectural Design of a 3-Storey Residence?

a)

Registered and Licensed Architect

b)

Civil Engineer

c)

Registered and Licensed Structural Engineer

d)

Registered and Licensed Civil Engineer

41.

Which section in RA 9266 is about the Continuing Professional Development?

a)

Art. IV Sec. 25

b)

Art. IV Sec. 26

c)

Art. IV Sec. 27

d)

 Art. IV Sec. 28

42.

Which among the choices is automatically a CPD Provider as shown in RA 9266?

a)

UAP

b)

PRBoA

c)

IAPOA

d)

 PIA

43.

Which Section in RA 9266 provides that a foreign citizen may take the Philippine Licensure Examination for Architect.

a)

 Sec. 26

b)

 Sec. 27

c)

Sec. 28

d)

Sec. 29

44.

Under RA 9266, an architect duly registered with the Board shall automatically become a member of the integrated and accredited professional organization of architects upon payment of the required fees and dues. In which Section of RA 9266 will you find this provision?

a)

 Sec. 38

b)

 Sec. 39

c)

Sec. 39

d)

 Sec. 40

45.

The “Prohibition in the Practice of Architecture” in under which section in RA 9266?

a)

Sec. 23

b)

Sec. 30

c)

Sec. 33

d)

Sec. 40

46.

Which section in RA 9266 refers to “Ownership of Plans, Specifications and other Contract Documents?”

a)

Sec. 13

b)

Sec. 23

c)

Sec. 33

d)

Sec. 43

47.

An agency attached to the Department of Labor and Employment, the PRC is mandated to regulate and supervise the practice of the professionals. The PRC stands for?

a)

Peoples Republic of China  

b)

Professional Regulatory Commission

c)

Professional Regulation Commission

d)

Professional Regulations Commission

48.

An agency attached with the Department of Justice mandated to issue decrees of registration and certificates of titles and register documents, patents and other land transactions for the benefit of landowners, beneficiaries and registering public in general.

a)

Registry of Deeds

b)

DAR

c)

Civil Registrar

d)

Land Registration Authority

49.

When there is a transaction involving the sale, mortgage or any transaction that requires the annotation of a Land Title, this office is required to find the title to ascertain that it still exists. It keeps records of all instruments affecting registered and unregistered land as well as chattel mortgages affecting movable properties.

a)

Registry of Deeds

b)

HLURB

c)

LTO

d)

DENR

50.

Which government agency will oppose conversion of agricultural land to commercial land?

a)

Local Planning Authority

b)

Local Government Unit

c)

HLURB

d)

DAR and DA