Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

T1 Week 2 Review

Total questions: 24

Worksheet time: 13mins

Name
Class
Date
1.

When troubleshooting a panel which step is not in the flow?

a)

Power Cycle

b)

Ship Panel

c)

Reboot

d)

Ensure Wiring

2.

Which sensor is this?

a)

DW11

b)

SMKT3

c)

GB2

d)

PIR2

3.

Which device is this?

a)

Takeover Module

b)

GE Translator

c)

Airbridge

d)

PLC/POE

4.

Speaking to the next Rep before transferring?

a)

Cold or Blind

b)

Hot or Confirm

c)

Dark or Miss

d)

Warm or Consult

5.

When do we escalate a WO to P0?

a)

No appointments over 4 weeks

b)

FSP No Show

c)

Reapeat Visit Issue

d)

No appointments over 2 weeks

6.

What does ACT stands for?

a)

Acknowledge Care Turn

b)

Assess Collaborate Turn

c)

Assess Care Think

d)

Acknowledge Control Think

7.

Do we troubleshoot Panel alerts first, before Sensors?

a)

True

b)

False

8.

Steps to place the Panel on Test?

a)

Service Card>Open Central Station>Place Panel on Test>Submit to Central Station

b)

Panel Card>Panel on Test

c)

Equipment Lookup>Panel

d)

Service Card>Service Details.

9.

Standard Co-Pay for a Work Order?

a)

$49

b)

$35

c)

Waived

d)

$4.95

10.

When the Panel has red alerts and shows Expired is it connected to Vivint?

a)

Yes

b)

No

11.

Which are the only instructions the Smart Home Pros Receive?

a)

Case Notes

b)

Credit Notes

c)

Work Order Notes

d)

Case Status

12.

Which of the following departments do we ALWAYS warm transfer to?

a)

Account Creations and Services

b)

Advanced Technical Support

c)

Advanced Issue Resolution: Questions

d)

Advanced Issue Resolution: Escalation

13.

Can you use the mute button instead of Hold for support?

a)

True

b)

False

c)

Sometimes

14.

What are some things we should NEVER state to a customer about a WO?

a)

Specific time of arrival

b)

Someone 18+ must be during the appointment

c)

Weekend or night appointment

d)

Technician will call ahead

15.

Where can we see the tracking info for a shipment?

a)

Service Card

b)

Transfer

c)

Work Orders Card

d)

Shipments Card

16.

Which components do you include in your greeting?

a)

Your Name

b)

Customer's Name

c)

Vivint

d)

Recorded Line

17.

Do we transfer calls to Advanced Issue Resolutions Questions Line?

a)

Yes

b)

No

18.

When the cover is loose or not well placed in a sensor is called?

a)

LoS

b)

Low Battery

c)

Tamper

d)

Fault Open

19.

When scheduling a tech, what should be the Case Status?

a)

Closed

b)

New

c)

Pending FSP Action

d)

In Progress

20.

Where do we go in Platinum Toolbox to get the app and dealer site reflect the same information?

a)

Push OpenVPN Config

b)

Sync System

c)

Update Panel Software

d)

Ping Panel

21.

Which of the following are parts of the hold process:

a)

Apologize the time in hold

b)

Thank the customer for the hold

c)

Ask permission to place them on hold

d)

Check every 2 minutes

22.

If the customer wants to cancel the service in the first 29 days, which department would we transfer them to?

a)

Moves

b)

ROR

c)

EOT

d)

Billing

23.

When should we schedule a WO?

a)

At the beginning of the call

b)

When CG flow guides it

c)

Anytime when leadership approves

d)

We never schedule WO

24.

What do we troubleshoot as T1 Specialists?

a)

Cameras

b)

Networking

c)

Panels and Sensors

d)

Doorlocks and Zwave