wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Environmental Quality (Schedule Waste) for HSE Practitioners

Total questions: 12

Worksheet time: 6mins

Name
Class
Date
1.

Effect of mismanagement of hazardous waste?

a)

Human health become better

b)

Make the environment clean

c)

Pollution to environment

2.

What will happened if the toxic and hazardous substances are not properly managed? Tick 3 correct answers.

a)

Aquatic life will die

b)

Cause pollution to soil, river and sea

c)

Aquatic life become more healthy

d)

Consumption of harmful source of water

3.

What is definition of Schedule Waste?

a)

Non toxic and non hazardous waste

b)

Toxic and hazardous waste

4.

Waste generator means

a)

a. any waste listed in the Third schedule

b)

b. any person licensed by the Director General of Environmental Quality

c)

c. any person who generates scheduled waste

d)

d. scheduled waste specified in the 4th Scheduled

5.

Waste generator shall notify the DG of the new categories and quantities of scheduled waste within

a)

a. 60 days generated

b)

b. 90 days generated

c)

c. 120 days generated

d)

d. 30 days generated

6.

Where should the waste be treated

a)

a. Recycling centre

b)

b. At prescribed premises or at on-site treatment facilities only

c)

c. Indah Water plants

d)

d. At contractor facilities

7.

Choose the responsibilities of waste generator

a)

a. Choose the transportations routes

b)

b. Cleanse or abate the spill or accidental discharge

c)

c. Provide technical expertise in clean-up operation

d)

d. Ensure the scheduled waste to be packaged, labelled and transport accordance to the guidelines.

8.

Scheduled wastes cannot be

a)

a. stored for 200 days or less after its generations

b)

b. accumulated on site exceed 20 metric tones

c)

c. accumulated on site more than 20 metric tonnes without making application to the DG

9.

What is Scheduled Waste

a)

a. Recyclable waste such as paper. Box and plastic

b)

b. Domestic waste from food, consumable and plastic

c)

c. Any waste falling within the categories of waste listed in the 1st scheduled, EQ (scheduled wastes) Reg 2005

d)

d. Waste from construction activities such as debris

10.

Which act enacted to control scheduled waste?

a)

a. Solid waste and Public Cleaning Act 2007

b)

b. Environmental Quality Act 1974

c)

c. Occupational and Safety Act 1984

d)

d. Poisons Act 1952

11.

The 3 parties in Scheduled Waste Management are as follows, except

a)

a. Waste generator

b)

b. Waste transporter

c)

c. Waste receiver / recovery facility

d)

d. Paper mill

12.

Scheduled waste label consist of ..

a)

a. date and SW code

b)

b. Date, SW code, symbol, name, phone number and address

c)

c. Name, SW Code and name of competent person

d)

d. Quantity, warning sign, SW code, person in charge and phone number