Pole Line Design

Total questions: 10

Worksheet time: 4mins

Name
Class
Date
1.

This is the study and planning of pole setting and configuration, its accessories and supports for the construction of overhead line structures in the most economic and least hazardous measures.

a)

Pole Setting

b)

Pole Line Design

c)

Pole Construction

d)

Pole Guying

2.

This deals with the selection of poles and accessories for different setting based on types of soil.

a)

Pole Setting

b)

Pole Line Design

c)

Pole Guying

d)

Pole Construction

3.

This is the vertical measurement from guy ground line to the point where the guy is attached to the pole.

a)

LEAD

b)

PULL

c)

HEIGHT

d)

GUY

4.

A special type of overhead structure where there is an absence of tensile stress on messenger wire between two poles.

a)

Leaning Pole Construction

b)

Caternary Construction

c)

Pull-off Construction

d)

Slack Span Construction

5.

A kind of guying where the guy wire is installed at an angle with the direction of the pole line.

a)

SIDEWALK GUY

b)

SIDE GUY

c)

DOWN GUY

d)

HEAD GUY

6.

Deals with the counteracting and balancing of forces that affects the structural stability of poles on curves, corner, and dead ends.

a)

GUYING

b)

TENSIONING

c)

POLE SETTING

d)

DOWN GUY

7.

This is the horizontal measurement from ground line to the point where the guy is attached to the pole.

a)

HEIGHT

b)

PULL

c)

LEAD

d)

None of the choices

8.

In practice the objective is to have a lead/ height ratio of 1.5.

a)

True

b)

False

c)

Trulse

d)

Maybe

9.

This is a side guy using __________________, as obstruction cannot allow the required lead.

a)

44.5 extension arm

b)

sidewalk extension arm

c)

sidewalk fixture

d)

ten-pin alley arm

10.

What is J in JPA?

(a)