Cuestionario sap

Total questions: 80

Worksheet time: 3hrs 40mins

Name
Class
Date
1.

What release procedure can you use to process an approval of a purchase requisition in SAP Materials Management? Please choose the correct answer.

a)

Without class types

b)

Without plant

c)

Without conditions

d)

Without classification

2.

In which of the following business transactions will you get an error message if you have NOT set up automatic account determination? Note: There are 3 correct answers to this question. (3)

a)

Goods issue of valuated material

b)

Goods receipt of valuated material

c)

Goods recepit of consignment stock

d)

Material price changes

e)

Stock transfer from a storage location to another storage location

3.

Which of the following tasks does the system perform during reorder point planning? (3)

a)

Recalculate the replenishment lead time for materials with automatic reorder point planning

b)

Carry out a net requirement calculation for every material included in the planning run

c)

Carry out a lot-size calculation for every material with net requirements

d)

Check, in the planning file entries, whether a material must be included in the planning run

e)

Perform backward scheduling to determine the availability dates or purchase requisitions

4.

Goods from a supplier arrive at your warehouse. However, you do NOT want these goods to be part of your inventory yet. What is the procedure for recording the conditional goods receipt (GR)? (1)

a)

Make a note in the purchase order and wait until the conditions for accepting the delivery are met

b)

Post a goods receipt to non-valuated GR blocked stock

c)

Post a goods receipt to valuated GR blocked stock

d)

Select the blocked stock type when posting the goods receipt

5.

You would like to create purchasing info records for consumable materials without material master records.

How must you proceed? (1)

a)

You specify the relationship between a material type and a supplier

b)

You specify the relationship between a material group and a supplier

c)

You must first create material master records

d)

You specify a special info category

6.

During reorder point planning, which time elements does the forward scheduling procedure take into account  when calculating the availability date? (3)

a)

Planned delivery time

b)

Total shelf life

c)

Goods issue processing time

d)

Purchasing department processing time

e)

Goods receipt processing time

7.

You are entering a supplier invoice for a purchase order that has been delivered. What information can you use as a reference to post the invoice? (3)

a)

Purchase requisition number

b)

Deliver note number

c)

Purchase order number

d)

Bill of lading number

e)

Sales order number

8.

Which of the following CANNOT be created by MRP Live? (1)

a)

Planned order

b)

MRP list

c)

Purchase requisition

d)

Schedule line

9.

When the procurement process is without a material master in SAP Materials Management, which configuration element do you assign to the valuation class? (1)

a)

Material type

b)

Item category

c)

Valuation Area

d)

Material Group

10.

A certain field in the material master must be maintained as a mandatory entry during initial creation. Which of the following factors influence the field selection? (3)

a)

Purchasing group

b)

Material type

c)

Procurement type

d)

Company code

e)

Transaction code

11.

What are some options when working with scheduling agreements? (3)

a)

A scheduling agreement item is always plant-specific

b)

A scheduling agreement can be used for a consignment process

c)

Item category M (Material Unknown) can be used in a scheduling agreement

d)

A material master record is optional in a scheduling agreement item

e)

Scheduling agreement delivery schedule lines can only be created manually

12.

What controls which item categories you are allowed to use when creating new items in a purchasing document? (1)

a)

Document category

b)

User role

c)

Account assignment category

d)

Document type

13.

 You want to procure material from another plant What purchasing instrument would you use? (1)

a)

Standard purchase order

b)

Warehouse transfer order

c)

Stock transport order

d)

Warehouse transfer request

14.

 You want to implement split valuation functionality. What must you do? (2)

a)

Create additional material master accounting data

b)

Customize valuation categories and valuation type

c)

Assign valuation types to stock types

d)

Add valuation types to all open purchase order items

15.

You are entering a supplier invoice with reference to a purchase order. After verifying that the balance is zero, you decide to post the invoice. The system detects quantity differences that exceed the upper tolerance limit specified in Customizing.

How does the system react? (1)

a)

A message is issued. You can post the invice and it is automatically released for payment

b)

NO message is issued. You can post the invoice and it is automatically blocked for payment

c)

A message is issued. You can only park the invoice

d)

A message is issued. You can post the invoice and it is automatically blocked for payment

16.

Your company will procure finished goods from a supplier. The supplier will manufacture the product using components shipped from your company. Which process would you use for this scenario? (1)

a)

External processing

b)

Third-party procurement

c)

Subcontracting

d)

Standard procurement

17.

Certain materials for external procurement are NO longer valid. What mechanism can you use to prevent the purchase Of those materials? (1)

a)

Set procurement type to inhouse

b)

Set a material status

c)

Set a vendor block

d)

Set the material inactive

18.

 What are some key features of the goods-receipt-based (GR-based) invoice verification? (3)

a)

The system generates an invoice item for each purchase order item

b)

Each invoice items is assigned to a goods receipt item

c)

After posting, you can reassign invoices from one goods receipt to another

d)

As a prerequisite, the indicator for GR-based invoice verification is set in the purchase order item

e)

A goods receipt must be posted prior to the invoice

19.

You have several company codes and plants in your project. You are setting the plant as valuation area. How can you minimize the effort involved in account determination? (1)

a)

You can group plant assigned to different charts of accounts by using the account grouping code

b)

You can group plants assigned to a diffeerent charts of accounts by using the valuation grouping code

c)

You can group plant assigned to the same chart of accounts by using the valuation grouping code

d)

You can group plants assigned to the same chart of accounts by using the account grouping code

20.

You are creating a purchase order for procurement of a material. Which of the following fields should you use to control the procurement process? (1)

a)

Material type

b)

Account assignment

c)

Valuation class

d)

Item category

21.

Which of the following activities is a prerequisite to enable partner roles determination in purchasing documents? (1)

a)

Assign a partner schema to relevant account groups

b)

Assign a partner schema to relevant purchasing document types

c)

Assign a partner role to relevant purchasing document types

d)

Assign a partner schema to relevant arrangement types

22.

Your company the classic procedure for purchase orders. Which of the following activities can you perform when you release a purchase order? (2)

a)

Delete the purchase order completely

b)

Enter the release code assigned to your user

c)

Reverse an already implemented release or rejection

d)

Change the value of the purchase order item

23.

Your purchasing department wants to monitor overdue purchase orders. What are the prerequisites for issuing delivery reminders for a purchase order? (3)

a)

Maintain reminder periods in the purchase order item

b)

Maintain a confirmation control key tin the supplier master

c)

Maintain purchasing value keys in the purchase order item

d)

Set message determination in Customizing and maintain message records

e)

Output the purchase order

24.

You want to collectively convert assigned purchase requisitions into purchase orders. What functions can you use? (3)

a)

Use the source list

b)

Run the automatic generation of purchase orders

c)

Use the document overview in the Create purchase order app (ME21N)

d)

Run material requirements planning (MRP)

e)

Use the assignment list

25.

How does SAP Fiori achieve the role-based design principle? (2)

a)

End users get all the information and functions they need for their daily work, but nothing more

b)

Navigation, personalization, and application configuration are limited to ensure consistency across userroles

c)

The application interace adapts to the size and device used by the user

d)

Single complex transactions are decomposed into several discrete apps suited to the user role

26.

Which of the following business partner roles are required to execute a procurement process? (2)

a)

Contact person on purchasing organization level

b)

FI Vendor on company code level

c)

Supplier on purchasing organization level

d)

Supplier on purchasing group level

27.

How can you personalize the Procurement Overview app? (3)

a)

Extend the set with a new card

b)

Change the set of cards

c)

Filter the content of the cards

d)

Change the position of the cards

e)

Hide an existing card

28.

Which of the following are features of the Delivery Completed indicator in a purchase order (PO) item? (2)

a)

If you set the indicator, NO further goods receipt may be posted for the PO item

b)

You can set the indicator manually when entering a goods receipt for you PO item

c)

The indicator is always set automatically if the quantity received is within the underdelivery tolerance

d)

If you set the indicator, the PO item is NO longer relevant for material requirements planning

29.

Which of the following parameters should you consider when calculating the re-order point for a material? (3)

a)

Lot-sizing procedure

b)

Expected daily requirements

c)

Safety stock

d)

Replenishment lead time

e)

Cheking group for availability check

30.

Your MRP planning run detects a shortage of 2000 pieces of a certain material for which a quota arrangement is active. Each of your two vendors can supply only 1000 pieces at once. What must you maintain to get a procurement proposal for 1000 pieces for each supplier? (2)

a)

Assign a rounding profile in the material master record

b)

Set a maximum lot size in the quota item and activate the 1x indicator checkbox

c)

Set a maximum quota quantity in the quota item

d)

Assign the indicator for the splitting quota to the used lot-sizing procedure

31.

Where do posting with automatic account determination occur in SAP Materials Management? (1)

a)

Requisition creation

b)

Material requirements planning

c)

Material valuation

d)

Invoice verification

e)

Inventory managment

32.

Supplier A should automatically be proposed as primary source for a specific material. What options do you have? (2)

a)

Set the Regular Supplier indicator in the business partner master record

b)

Use the Regular Supplier indicator in the material master record

c)

Use the Regular Supplier indicator in the info record

d)

Use the source list and mark the vendor as fixed

33.

In the standard system, a controllable system message is shown when a user creates a purchase order with a delivery date in the past. What must you configure to allow such purchase orders to only be issued by authorized users? (1)

a)

Copy the system message to a new version, set it as an error message, and assign the version with user parameter MSV to the authorized users

b)

Copy the system message to a new version, set it as an warning message, and assign the version with user parameter MSV to the non-authorized users

c)

Copy the sistem message to a new version, set it as an error message, and assign the version with user parameter MSV to non-authorized users

d)

Copy the system message to a new version, set it as a warning message, and assign the version with user parameter MSV to the authorized users

34.

In the company, the invoice verification clerks working with the Release Blocked Invoices App, for which kind of blcked invoices can the use the automatic release function? (1)

a)

Invoices blocked because of an excessive amount

b)

Invoices blocked Stochastically

c)

Invoices blocked due to variances

d)

Invoices blocked manually

35.

Which lot-sizing procedures are suitable for reorder point planning? (3)

a)

Replenishment to maximum stock level

b)

Daily lot size

c)

Lot-for-lot order quantity

d)

Monthly lot size

e)

Fixed order quantity

36.

What do you need to do if you want MRP live to create planned orders for externally procured materials? (1)

a)

Set the appropriate plant-specific material status

b)

Implement BADI PPH_MRP_SOURCING_BADI => SOS_DET ADJUST

c)

Change the procurement type of the material

d)

Set the MRP indicator in the source list of the material to "Not relevant for planning"

37.

What are some functions supported by the Create Supplier Invoice SAP Fiori app? (3)

a)

Process evaluated receipt settlement (ERS)

b)

Enter unplanned delivery costs

c)

Display the purchase order history

d)

Create an invoice for multiple purchase order references

e)

Start the automatic payment run

38.

Your purchasing department is working with scheduling agreements. What can you do using release creation profiles? (3)

a)

You can entenr a release creation profile in the vendor master data

b)

You can create plant-specific release creation profiles in customizing

c)

You can enter a release creation profile in the material master data

d)

You can assign a specific confirmation control key to a release creation profile

39.

You want to set up an account determination that groups several material types on the same accounts. What must you do? (1)

a)

Assign the same account modification to the material types

b)

Assign the same valuation class to the material types

c)

Assign the same account category reference to the material types

d)

Assign the same valuation grouping code to the material types

40.

How does the system derive the company code when you post a goods movement in a plant? (1)

a)

Each plant is assigned to a purchasing organization, which it self belongs to one company code

b)

A plant can occur several times in a client, but can only belong to one company code

c)

A plant is unique in a client, and can only belong to one company code

d)

The company code is derive from you default settings

41.

Which of the following are possible personalization's of the SAP Fiori launchpad? (2)

a)

Selection of SAP Fiori version

b)

Selection of the design theme

c)

Selection of tile size

d)

Settings for language and region

42.

What are some key features of the SAP Smart Business key performance indicators (KPIs) tiles used for purchasing analytics? (2)

a)

Each tile represents a set of actionable cards

b)

Chart snippets on a tile are updated after each start of the evaluation

c)

The tiles show key information that is updated in real time

d)

Numbers on the tiles can have different colours to represent different thresholds of alert

43.

You regularly purchase non-stock materials. What must you set up to allow the system to automatically propose specific accounts? (1)

a)

Assign transaction keys to the material groups

b)

Assign valuation clasess to the material groups

c)

Assign valuation classes to the account assginment categories

d)

Assign transaction keys to the account assignment categories

44.

Prerequisites for Shelf Life expiration date check.

Which of the following prerequisites must be met for the system to check the shelf life of materials at goods receipt? (3)

a)

The shelf life expiration date check is activated for the movement type in customizing

b)

The shelf life expiration date check is activated for the plant in customizing

c)

The purchase order item contains the remaining shelf life

d)

The material is managed in batches in the plant

e)

The shelf life expiration date check is activated for the material type in customizing

45.

What can you control with the confirmation control key? (2)

a)

The document type for inboud deliveries

b)

The confirmation sequence

c)

Default reminder levels

d)

Whether a confirmation is a prerequiosite for a goods receipt

46.

In your company, invoice verification clerks post a cash discount amount using the posting net method. How do they trigger the posting method? (1)

a)

By chossing an appropriate payment method

b)

By changing the payment terms

c)

By creating an extra invoice item for the cash discount amount

d)

By using an appropriate document type

47.

In your proejct, you need to make sure that consignment purchase orders utilize a different number range tha other purchase orders. What must you do? (1)

a)

Customize a new document type and assign only consignment vendors to it

b)

Customize a new item category for this purpose and assign a new number range to it

c)

Customize a new item category for this purpose and deactivate the standard one

d)

Customize a new document type and assign the item category for consignment only to this type

48.

Which of the following are prerequisites for flexible workflows for purchase order approval? (3)

a)

Define the recipients for the flexible workflow in the Manage Workflows for Purchase Orders SAP Friori App

b)

Activate the flexible workflow for purchase orders in customizing

c)

Create a class with flexible workflow characteristics for purchase orders

d)

Deactivate the classic release procedure for pruchase orders in customizing

e)

Set up the preconditions for the flexible workflow in the Manage Workflows for Purchase Orders SAP Fiori App.

49.

When using a classic release procedure, for which of the following documents must you use classification? (2)

a)

Purchase orders

b)

Purchase requisitions

c)

JIT delivery schedules

d)

Requests for quotation

50.

Which of the following occurs when you park a supplier invoice related to a purchase order? (2)

a)

The purchase order history is updated

b)

An MM invoice document is created

c)

G/L accounts are updated

d)

A FI invoice is posted and blocked for payment

51.

You want to manually post an initial entry of stock for a material in SAPS/4HANA. You should be able to enter both a quantity and an amount. How do you proceed? (2)

a)

On the SAP Frio Launchpad, use the Post Goods Receipt without Reference App

b)

On the SAP Fiori Launchpad, use the Stock Single Material App

c)

On the SAP Fiori Launchpad, use the Post Goods Movements app

d)

In the SAP GUI, use transaction MIGO

52.

What are some available SAP Smart Business key performance indicators (KPls)for contracts? (3)

a)

Contract leakage

b)

Conditions by contract

c)

Unused contracts

d)

Value contrac consumption

e)

Contract release orders

53.

You test the various options that SAP S/4HANA offers for stock transfers between two different plants within the same company code. Which special features do stock transport orders have? (2)

a)

The material on the road is managed in the stock in transit of the receiving plant

b)

The material on the road is part of the valuated stock of the shipping plant

c)

If necessary, you can post the goods receipt to blocked stock in the receiving plant

d)

You can optionally post the goods issue from inspection sotck in the supplying plant

54.

You send newly created purchase orders to a supplier via email, whereas quantity or price changes are to be transmitted by fax. What prerequisites must be met? (3)

a)

The New Message Determination Process for Change Messages indicator is flagged in customizing

b)

You use different message types for the print operations New and Change

c)

The Exclusive indicator is flagged in the access sequence

d)

The condition record contains the Price and Quantity fields

e)

The Price and Quantity fields are relevant for printout changes

55.

Your company uses the classic release procedure for purchasing documents. For which configuration object must approvers have the appropriate authorization? (1)

a)

Release strategy

b)

Release code

c)

Release group

d)

Release indicator

56.

For which of the following scenarios could you implement a stock determination strategy for a material in inventory management? (3)

a)

You have both vendor consignment stock and own stock for the material. You want to withdraw your own stock first

b)

Your material is stored in different plants. You want to withdraw from the plant with the lowest stock first

c)

Your material is stored at various storage locations in your plant. You want to withdraw from the storage location with th highest stock first

d)

You have bouth quality inspection sotck and unrestricted-use sotck for the material. You want to withdraw unrestricted-use stock first

e)

You use split valuation to separate internally produced and externally procured quantities. Internally produced quantities should be withdrawn first

57.

How can you prevent a release order in excess of the target quantity? (1)

a)

If the order quantity exceeds the target quantity, a warning message is issued. You can set this as an error message in customizing to prevent releases

b)

If the order quantity exceeds the target quantity, a dialog box opens. You can use a special authorization to control whether the user may order the excess quantitiy

c)

The system prevents exceeding the target quantity in a release order. No additional action is required from you

d)

You must implement a BADI to check the target quantity in the contract release order and prevent release if the quantity exceeds it

58.

Your project uses product costing and production planning functionality. Which valuation area must be used? (1)

a)

Business Area

b)

Company Code

c)

Plant

d)

Controlling Area

59.

What information can the analytical Purchasing Group Activity SAP Fiori app provide? (2)

a)

The number of contracts created by a purchasing group since the beginning of the current year

b)

The net purchased value per purchasing group and month for the current year

c)

The number of purchase orders created by a user since the beginning of the current year

d)

The number of inspection lots per purchasing group and month for the current year

60.

At which of the following organizational levels must you maintain a business partner master record for a supplier? (3)

a)

Purchasing group

b)

Company code

c)

Plant

d)

Purchasing organization

e)

Client

61.

You procure some materials exclusively by consignment. You want material requirements planning (MRP) to create consignment purchase requisitions assigned to a vendor, instead of normal purchase requisitions for these materials. What must you do for each of these materials? (2)

a)

Maintain a default storage location for external procurement in the material master record

b)

Set a special MRP group for consignment in the material master record

c)

Set a special procurement key/type for consignment in the material master record

d)

Create at least one source of supply for consignment

62.

With which field do you control the creation of a scheduling agreement with release documentation? (1)

a)

Document type

b)

Item category

c)

JIT indicator

d)

Release creation profile

63.

In a multinational corporation there could be several company codes with several purchasing organizations. How can you minimize the effort for price condition maintenance within such a group? (1)

a)

Use a reference info record

b)

Use a reference comapny code

c)

Use a reference purchasing group

d)

Use a reference purchasing organization

64.

An incoming invoice shows a variance when compared to the expected quantity or amount. How can you create this invoice? (2)

a)

Enter the actual invoice values, use the reduction function, and post. The system creates a credit memo in addition to the actual invoice

b)

Enter the actual invoice values. You must then park the invoice because posting is NOT allowed

c)

Enter the actual invoice values and post. The system creates an invoice with the actual values and possibly blocks it for payment

d)

Enter the actual invoice values, use the reduction function, and post. The system creates an invoice with the reduced values

65.

You are posting a goods receipt without a corresponding purchase order (PO) in the system. Which of the following are prerequisites for automatic generation of the PO at the time of goods receipt? (2)

a)

Automatic purchase order generation is activated for the movement type in customizing

b)

The goods receipt to be posted is intended for consumption

c)

A central purchasing organization is assigned to the plant in customizing

d)

The delivered material is a valuated stock material

66.

At what level do you maintain the purchasing group in the material master? (1)

a)

Client

b)

Company code

c)

Plant

d)

Purchasing organization

67.

Goods from a supplier arrive at your warehouse. However, you do NOT want these goods to be part of your inventory yet. What is the procedure for recording the conditional goods receipt (GR)? (1)

a)

Make a note in the purchase order and wait until the conditions for accepting the deliver are met

b)

Post a goods receipt to non-valuated GR blocked stock

c)

Post a goods receipt to valuated GR blocked stock

d)

Select the blocked stock type when posting the goods receipt

68.

You want to set up an account determination that groups several material types on the same accounts. What must you do? (1)

a)

Assign the same account category reference to the material types

b)

Assign the same valuation grouping code to the material types

c)

Assign the same account modification to the material types

d)

Assign the same valuation class to the material types

69.

You have to post scrap expenses to a special account. Based on which characteristics can you influence the behaviour of the account determination? (2)

a)

Stock type

b)

Storage location

c)

Plant

d)

Movement type

70.

You would like to create purchasing info records for consumable materials without material master records. How must you proceed? (1)

a)

You must first create material master records

b)

You specifi a special info category

c)

You specify the relationship between a material group and a supplier

d)

You specify the relationship between a material type and a supplier

71.

Confirmed quantities and dates must be recorded in the purchase order item. Your purchasing department expects suppliers to send purchase order confirmations and shipping notifications. What do you need to configure in Customizing? (1)

a)

A confirmation control key relevant fot the proof of delivery

b)

A purchasing value key with the order acknowledgment indicator preset

c)

A confirmation control key with a sequence of two confirmation types

d)

A confirmation control key with at least one confirmation type marked as relevant for planning

72.

You have several valid purchasing info records for one specific material available in your system. Which info record will the system assign when you manually create a purchase requisition? (1)

a)

The system will choose the most recent info record

b)

The system will choose the info record from the last purchase order

c)

The system will choose the info record with the lowest price

d)

The system will show all valid records in a list and the user needs to manually select one

73.

You want to prevent a specific material from being ordered from a specific vendor. What must you do? (1)

a)

Crate an entry in the source list with a blocking indicator

b)

Create a quota arrangement entry with zero quantity

c)

Create a blocking entry in the purchasing info record

d)

Create a blocking entry in the vendor master data

74.

Which options are available for the automatic posting of unplanned delivery costs when creating an invoice with purchase order reference? (2)

a)

The costs are posted automatically in a separate invoice

b)

The costs are distributed among the invoice items

c)

The system determines a freight clearing account for posting the cost

d)

The costs are posted to a separate account, which is defined in the account determination table

75.

What happens when you post a logistics invoice for a purchase order that you have received in the system? (2)

a)

The Payment is posted against open liabilities

b)

The accounting documents are created

c)

The purchase order history is updated

d)

Open liabilities are evaluated

76.

For which of the following characteristics can you set up the flexible workflow for purchase order approva? (3)

a)

Material group

b)

Currency

c)

Plant

d)

Document type

e)

Supplier

77.

What can you specify in an output condition record? (3)

a)

Partner function

b)

Output time

c)

Validity period

d)

Output medium

e)

E-mail adress

78.

Which of the following elements influence the G/L account determination? (2)

a)

Chart of accounts

b)

Valuation area

c)

Business area

d)

Controlling area

79.

In which sequence does the system search for a valid source of supply when you manually create a purchase requisition with automatic source determination?

a)

1. info record; 2. Source list; 3. Outline agreement item; 4. Quota arrangement

b)

1. Info record; 2. Outline agreement; 3. Source list; 4. Quota arrangement

c)

1. Quota arrangement; 2. Source list; 3. Outline agreement item; 4. Info record

d)

1. Source list; 2. Outline agreement item; 3. Info record; 4. Quota arrangement

80.

Which of the following assignments are possible for a purchasing organization? (3)

a)

Several plants from the same company code to one purchasing organization

b)

One purchasing organization to multiple company codes

c)

One purchasing organization to one company code

d)

Several plants from different company codes to one purchasing organization

e)

Multiple purchasing groups to one purchasing organization