Worksheetssoftware engineering
Total questions: 25
Worksheet time: 13mins
1. What is software?
a. Set of programs
b. Set of programs, documentation and configuration of data
c. Documentation and configuration of data
c. Set of commands
2. ______is the most important stakeholder.
a. Top level manager
b. Entry level persons
c. Users of the software
d. Mangers
3. When to proceed for white box testing?
a. After SRS
b. After designing phase
c. After coding phase
d. After installation phase
4. The system is developed in a series of ____releases using spiral model
a. Decremented
b. Enhanced
c. Incremental
d. Both incremental and decremented
5. ______is the process to gather the software requirements from client, analyse and document them.
a. Requirement gathering
b. Feasibility study
c. Documentation
b. Requirement engineering
6. _____are two dimensions in spiral model
a. Radial, angular
b. Diagonal, perpendicular
c. Diagonal, angular
d. Radial perpendicular
7. In the spiral model a risk analysis is performed at______
a. Second loop
b. First loop
c. Every loop
d. Third loop
8. Which is/are the developer specific requirements?
a. Maintainability
b. Portability
c. Availability
d. Portability and availability
9. The number of entities to which another entity can be related through a relationship set is called___
a. Entity
b. Cardinality
c. Schema
c. Attribute
10. In waterfall model problem identification is the ____step.
a.first
b. Second
b. Third
b. Fourth
11. ____is the process in which developers discuss with the client and end users and know their expectations.
a. Documentation
b. Organizing requirements
c. Requirement gathering
d. Negotiation and discussion
12. _____is a graphical representation of an information system.
a. Flowchart
b. Data Flow Diagram
c. Pictogram
d. Decision tree
13. In software engineering quality management is known as_____
a. SQM
b. SQA
c. SQI
d. SQA and SQM
14. Which represents the key objective of integration testing?
a. Procedure errors
b. Interface errors
c. Design errors
d. User errors
15. ________is incorrect testing technique
a. System testing
b. Unit testing
c. Collaboration testing
d. Integration testing
16. ______is the most important stakeholder.
a. Top level manager
b. Entry level persons
c. Users of the software
d. Mangers
17. HIPO means____
a. Hierarchical Input Process Output
b. Hierarchical Input Process
c. High Input Process Output
d. Hierarchical Input Program Output
18. Identify the term which is not related to testing?
a. Error
b. Failure
c. Test case
d. Test bot
19. _____identifies, verifies and documents that corrections have been made in software.
a. Project team
b. SQA group
c. Project manager
d. Developer
20. Decision table testing is a _______
a. White box testing
b. Unit testing
c. Black box testing
d. Integration testing
21. ___symbol represent relationship sets in an ER diagram.
a. Rectangle
b. Diamonds
c. Lines
d. Ellipse
22. A relational database system needs to maintain data about the relations, such as the schema of he relations called______
a. CatLog
b. Metadata
c. Log
d. Dictionary
23. In DFD circles are used for showing____
a. Data flow
b. Process
c. Connection
d. Storage
24. Which of the following is not suitable for accommodating any changes?
a. Waterfall model
b. Spiral model
c. Prototyping model
d. All of these
8. Which is the odd property corresponding to a good software requirements specification (SRS).
a. Complete
b. Traceable
c. Ambiguous
d. Verifiable