Hoop and Meridional forces are associated with,
A) Dome
B) Truss
C) Folded Plates
D) Space Frame
A
B
C
D
A
B
C
D
A
B
C
D
Which of the fallowing statement regarding PERT is not true,
A) Each activity of PERT network has three different time estimates.
B) Expected activity time is estimated based on β-distribution.
C) PERT is a deterministic model.
D) PERT network may have more than one critical path
A "Demolition contract" of a building is awarded to the
A) Lowest Bidder
B) Highest bidder
C) Second Lowest Bidder
D) Second Highest bidder
A
B
C
D
The command DVIEW in AutoCad permits to view
A) A selected portion of drawing in detail
B) the entire screen on the monitor
C) a perspective view of the drawing
D) a damaged part of the drawing
A
B
C
D
A
B
C
D
A
B
C
D
saturation level of a colour represents
A) distribution
B) brilliance
C) darkness
D) warmth