wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Discover the Unknown in Automation

Total questions: 10

Worksheet time: 4mins

Name
Class
Date
1.

Which industry Greatech is in?

a)

Manufacturing

b)

Semiconductor

c)

Automation

d)

IoT & Industry 4.0

2.

Which of the following is Greatech's core values?

I. Innovation

II. Integrity

III. Fairness

IV. Performance

V. Care & Respect

a)

I, II, & III Only

b)

I, II, IV & V Only

c)

II, III, IV & V Only

d)

I, III & IV Only

3.

Which of the below is Greatech's Slogan?

a)

Accelerate the Future

b)

Accelerate in Automation

c)

Together We Create Possibilities

d)

Discover the World of Automation

4.

Which markets Greatech served?

I. Life Science

II. Solar

III. Electronic Device

IV. Semiconductor

V. Agriculture

a)

II, III, IV & V Only

b)

I, II, III, IV Only

c)

I, II & V only

d)

All of the above

5.

Which program below is open for Degree Fresh Graduates?

a)

Young Apprenticeship Program

b)

Fresh Engineer Program

c)

Entry-Level Training Program

d)

Young Engineer Program

6.

Which positions are under Young Engineer Program (YEP)?

I. Mechanical Design Engineer

II. Electrical Design Engineer

III. Vision Engineer

IV. Validation Engineer

V. Software Engineer

a)

I, II, III, & IV Only

b)

I, II & IV Only

c)

I, II, III & V Only

d)

All of the above

7.

Which benefits are NOT offered by Greatech to employees?

I. Performance Bonus & Contractual Bonus

II. Group Insurance Scheme & Outpatient

III. Optical, Dental & Health Screening

IV. Annual Increment

a)

I only

b)

II & III only

c)

I & IV Only

d)

None of the Above

8.

What are the considerations taken during designing?

I.Functionality & Practicality

II. Accessibility & Ergonomics

III. Maintenance & Robustness

IV. Manufacturability

V. Cost

a)

I Only

b)

I & IV Only

c)

IV & V Only

d)

All of the Above

9.

What is the correct answer to be inserted for no.4, for project sequence?

1. RFP/ RFQ

2. Conceptual Design

3. Budgetary

4. _____

5. Internal / External Review

6. Fabrication / Procurement

7. Assembly / Wiring

8. Test & Debug

9. Buy-off, Pack & Ship, On-site Installation

a)

Detailed Design

b)

Costing for Quotation

c)

Develop software system

d)

Testing of Machine

10.

Which are not the benefits of Automation?

I. Productivity

II. Quality & Consistency

III. Cost & ROI

IV. Safety

a)

I Only

b)

I & II Only

c)

None of the Above

d)

All of the Above