WorksheetsCMA 385 - Estimating I Chapters 1-3
Total questions: 84
Worksheet time: 42mins
___ estimates are prepared as the design process proceeds towards completion.
Rough
Interim
Preliminary
Simple
The levels of ___ estimates include detail takeoff and crew-based estimates.
final
closing
concluding
finished
The ___ used depend on company practice, the project being estimated, and/or estimator preference.
pricing parameters
costing calculations
financial prodedures
estimating practices
___ estimates are used to develop various basic project budgets based on a variety of project options and require the least amount of construction documentation to complete.
Coneptual
Order of magnitude
Detail takeoff
Construction document
___ estimates, also referred to as schematic or model estimates, are based on the building function or the functional area of the building.
Design development
Conceptual
Detail takeoff
Construction document
___ estimates require completion of the majority of the construction documents and confirm the overall project costs as the design nears completion.
Construction document
Detail takeoff
Order of magnitude
Design development
At the ___ estimate level, owners commonly compare the costs determined at this level of estimating with bids received from various contractors and subcontractors.
construction document
detail takeoff
design development
crew-based
A(n) ___ estimate is an estimate in which each individual construction component is accounted for.
order of magnitude
detail takeoff
design development
conceptual
For ___ estimates, material quantities, equipment, and labor costs are included in a single calculation.
design takeoff
design development
crew-based
construction document
___ estimates can be developed with various options and pricing to allow the owner to make realistic determinations about options, such as sustainable roofing materials or reuse of surface water, in the context of available financing.
Order of mangnitude
Design takeoff
Conceptual
Design development
Prior to entering into the estimating and bidding process, the owner of a contracting, subcontracting, or material-supply firm must consider several factors including type of construction, company capacity, and ___.
AHJ recommendations
state and/or local ordinances
current job operations
market conditions
The ___, project manager, engineers, contractors, and architect or owner are typically in attendance at a prebid meeting.
planning consultant
building control officer
estimator
quantity surveyor
A(n) ___ includes pricing, performance criteria, and scheduling and staffing information as needed by the owner for selection of the contractor or contracting team.
estimate
bid proposal
costing proposition
preliminary submission
The scope of the work to be bid and performed by a(n) ___ must be clearly defined.
subcontractor
general contractor
engineer
project manager
While procedures used by individuals vary, ___ or procedures are followed for reviewing plans and specifications and developing each bid.
standard takeoffs
prebid agreements
proper backlogs
standard steps
A(n) ___ estimating process requires that the most current construction documents, including the detail drawings and specifications, are used for the bidding process.
final
complete
timely
quick
The ___ begins with a review of all construction contract documents, including detail drawings, and specification books, including the general specifications, addenda, and agreement forms.
financial evaluation
estimating process
appraisal procedure
costing process
Maintaining the proper ___ plays a role in the number of projects bid and the profit margins that management may apply to a particular project.
bid documentation
project records
contact information
backlog
A ___ is the practice of reviewing construction contract documents to determine the quantities of materials to be included in a bid.
quantity takeoff
materials review
bid evaluation
detail takeoff
The ___ are involved in almost every phase of the planning and construction process.
general contractors
suppliers
estimators
subcontractors
___ expenses include all costs associated with a specific project but cannot be assigned to a specific item in the project.
Operating
Running
Overhead
Fixed
___ costs include items such as the installation of temporary electrical service, job-site office and storage trailer transportation and rental, and the creation and removal of temporary access roads if required.
Transit
Job-site establishment
Collective resource
Mobilization
The ___ monitors federally funded projects to ensure that civil rights laws are being followed.
Department of Labor
Occupational Safety and Health Administration (OSHA)
Office of Federal Contract Compliance Programs (OFCCP)
Department of Health and Human Services (DHS)
___ is the process whereby the owner and contractor agree on changes to the original design documents that will result in a comparable finished construction project with some substitutions and cost savings.
Cooperative construction
Design improvement
Productive alterations
Value engineering
One of the highest risk variables in construction project estimating is the cost of construction ___.
labor
materials
permits
insurance
For established companies, the ___ are the most reliable source of labor cost data.
trade unions
Department of Labor's records
company historical records
country labor trends
___ are penalties assessed against a contractor or subcontractor for failure to complete work within a specified period of time.
Liquidated damages
Building permit late fees
Overtime tax
AHJ fault fees
Even though standard building codes exist, local building and zoning commissions may ___ codes to address the needs of their residents.
not follow
adopt and modify
create
enforce
When contemplating ___, estimators should consider the employment and unemployment levels in a construction market and assess the impact those levels may have on labor resources.
subcontractor arrangements
overhead expenses
governmental factors
labor availability
Estimators must take material and product availability into account when developing an estimate because availability affects price and ___.
labor productivity
job-site scheduling
subcontractor arrangements
building codes
Associations such as the ___ and the Construction Specifications Institute (CSI) provide a variety of reference materials for building standards and specifications.
American Institute of Architects (AIA)
Construction Management Association of America (CMAA)
National Construction Industry (NCA)
National Institute of Building Sciences (NIBS)
Estimators consult ___ to obtain information related to current prices and potential changes in construction-cost items.
price categories
cost indexes
market trends
material databases
A(n) ___ is the price of a number of common construction materials combined into a unit assembly, such as a wall constructed of studs, top and bottom plates, headers, and strap bracing.
combined cost
integrated price
complete construction expense
assembly cost
___ are available for a variety of materials such as doors, windows, special fixtures, louvers, and other individual items that are shown on a drawing.
Material prices
Item expenses
Cost specifications
Component costs
___ is the calculation of material, equipment, and labor prices in a single step based on a specific quantity of construction put in place.
Unit pricing
Combined expenses
Assembly cost
Packaged pricing
Equipment rates vary according to equipment availability, ___, and the equipment required.
calculated labor costs
equipment insurance fees
the volume of construction work in an area
equipment condition
___ are calculated based on standard material quantities.
Equipment fees
Unit prices
Component costs
Labor rates
After an estimator has determined the number of work hours required for a particular unit price of material from reference tables, ___ can be added to the calculations to determine total labor costs.
wage rates
equipment fees
scheduling costs
building permit rates
Printed and digital references are organized to allow an estimator to quickly determine material, equipment, and labor costs in relation to the ___.
assembly cost
costing index
quantity takeoff
unit price
When estimating with a computerized system, digital information concerning unit pricing may be calculated automatically by entering the type of material and the ___ of the material to be bid.
weight
dimensions
composition
durability rating
The ___ are reviewed to determine the types and amounts of work contained in a particular construction project.
general conditions
addenda
specifications
detailed drawings
___ are written agreements describing building components and various construction procedures included in the specifications for a construction project.
Specifications
General conditions
Addenda
Bidding requirements
An estimating ___ is an approach used by an estimator to perform project analysis, quantity takeoff, and pricing in a consistent and organized manner.
practice
procedure
plan
method
Items in the specifications related to an estimate include materials, equipment, labor, overhead, and ___.
profit
sustainability cost
bonding and insurance
building permit fees
Estimators must take all portions of the ___ and specifications into account when calculating overall job costs.
bid proposal
general conditions
detail drawing
contract documents
___ costs are expenses that are not attributable to any one specific operation.
Running
Operating
Fixed
Overhead
___ is the monetary benefit realized by a construction firm at the completion of a building process.
Return
Yield
Profit
Surplus
A decision is made by a contractor to bid on a project if the project includes the correct ___.
profit margin
timeline for work completion
equipment for the job
type of work
The ___ estimating method is an estimating method in which material quantities are calculated and entered onto ledger sheets for pricing.
top-down
traditional
bottom-up
parametric model
When using unit labor costs to calculate total labor costs, the ___ may also be used as the multiplier.
equipment rates
material quantities
insurance fees
profit margin
Using ___, an estimator studies and reviews the plans and uses several colored markers to indicate each type of material as it is taken off of the plans.
detail takeoff
material accountability
quantity takeoff
plan markup
A ___ is a grid consisting of rows and columns on a sheet of paper into which item descriptions, locations, code numbers, quantities, and costs are entered.
cost index
costing calculation chart
ledger sheet
quantities and cost documentation
The ___ is a uniform system of numbers and titles used for organizing information about construction requirements, products, and activities into a standard sequence.
Construction-Standard
PricingProcedure
MasterFormat
CostingCode
The general conditions section in the specifications for a project commonly contains a list of the ___ categories.
materials
bid
equipment
bonding
In the MasterFormat, a(n) ___ is given to each item.
abbreviation
symbol
letter/number
numerical code
For building construction, item codes used in a bid are commonly based on the numbered divisions of the MasterFormat, which is published by the ___.
Construction Specifications Institute (CSI)
National Institute of Building Sciences (NIBS)
Construction Management Association of America (CMAA)
Associated Builders & Contractors, Inc. (ABC)
Estimators should use ___ categories on ledger sheets to ensure consistency and to present the information in a format familiar to others involved in the construction process.
specific
standard
their own
previous job
An estimator must have ___ skills in order to mark and take off the portions of the plans that pertain to the work being bid.
construction management
architectural drawing
print reading
design development
Advantages of ___ estimating methods include faster estimates, the ease with which last-minute changes can be incorporated into a bid, the ability to share estimating components for a large structure with a team of estimators, and assistance in reducing mathematical errors or missed bid items.
analogous
traditional
three-point
digital
Care must be taken by an estimator to verify that the ___ is performing the proper mathematical calculation for the proper range of cells.
computer algebra system
spreadsheet
intern
database
One of the most time-saving features of sophisticated estimating programs using ___ is their ability to correlate quantity takeoff amounts with material and labor unit pricing information to quickly calculate costs.
BIM
database transfer
CAD
spreadsheets
Standard construction ___ are entered into a database as a standard material, equipment, and labor quantity and cost per standard unit of measure.
groupings
units
assemblies
combinations
A ___ is used with an estimating program to input drawing coordinates directly into the program, reducing the need to enter quantities and dimensions using a computer keyboard.
scientific calculator
digitizer
graphic translator
digital drawing adapter
Use of ___ creates a design and construction process where owners, architects, engineers, estimators, contractors, subcontractors, and suppliers utilize digital information in a consistent format to identify the best construction practices and avoid costly oversights.
CAD
spreadsheets
digitizers
BIM
___ allows estimating programs to automatically develop quantity takeoffs based on intelligent object codes embedded in digital plan documents.
CAD
CAD and BIM compatibility
BIM
A digitizer
___ includes the compilation of all the various information required for members of a construction team.
Closing documentation
Final reporting
Concluded costing
Ending compilation
BIM models may also provide fourth and fifth "dimensions," with the fourth dimension being quantity takeoff and estimating, and the fifth dimension being ___.
possible insurance risks
project scheduling and planning
outstanding overhead costs
potential job-site labor problems
Integrating estimating programs with ___ programs can indicate areas where savings or cost overruns may have occurred.
cost index
cost calculation
historical job recording
job cost analysis
___ provide details that cannot be shown on drawings.
Addenda
Specifications
Change orders
RFIs
The specifications are the most important document for the ___ at the beginning of the estimating and bidding process.
owner
architect
contractor
structural engineer
The ___ state the method used for bidding and the selection process for awarding the project.
bid analysis sheets
addenda
bidding forms
general conditions
A(n) ___ is typically responsible for the detailed design and coordination of a construction project.
structural engineer
owner
architect
project manager
The ___ is a uniform system of numbers and titles used for organizing information about construction requirements, products, and activities into a standard sequence.
Construction-Standard
PricingProcedure
MasterFormat
CostingCode
The current edition of the MasterFormat, initiated in 2004, contains ___ divisions that define broad areas of construction.
16
25
50
75
Division ___ of the specifications includes information concerning existing items, such as underground storage tanks, concrete foundations and piers, and any existing thermal or moisture protection.
01
02
04
06
Division ___ of the specifications provides information concerning highly specialized construction projects including swimming pools, amusement park equipment, controlled environment rooms, and building automation systems.
03
05
10
13
The specifications for Division ___ provide information regarding equipment used for control of air pollution, noise pollution, water pollution, and solid waste materials.
44
46
47
48
Division ___ of the specifications provides information regarding rough carpentry, finish carpentry, architectural woodwork, structural plastics and plastic fabrications, and structural composite materials.
02
04
06
08
One of the most necessary and difficult skills to use when creating an estimate from a large set of prints is the ability to ___ an entire project.
calculate the cost of
visualize
understand individual component function in
coordinate labor for
The ability to efficiently obtain and locate information from a variety of sources and interpret it in such a way that everyone can understand it is the most important requirement of the ___ process for a large building project.
bid proposal
design detailing
costing calculation
quantity takeoff
Print divisions are denoted by a ___ shown in the title block.
number
lowercase letter
number and letter
capital letter
___ prints include general building information, floor plans, elevation views, section drawings, and detail drawings.
Structural
Architectural
Civil
Design
___ prints provide information about sizes, styles, and placement for foundations, beams, columns, joists, braces, and other framing and load-bearing members.
Architectural
Civil
Construction
Structural
___ prints include overall site layout, grading, elevations, and topographical information.
Civil
Topographical
Job-site
Ground