AR414 - M - AT#02

Total questions: 15

Worksheet time: 10mins

Name
Class
Date
1.

Who manages a project construction team?

a)

Manager

b)

Contractor

c)

Site Engineer

d)

Foreman

2.

They look for new business opportunities, maintain a backlog of projects, cultivate client and partner relationships, and help manage the company’s finances. They are involved in bidding on new projects, big-picture budgeting, and executing favorable contracts.

a)

C-Level Executives

b)

Project Managers

c)

Construction Managers

d)

General Foreman

3.

They mostly receive regular updates on a project’s key metrics, most won’t spend more than 1-2 days per month on any particular project. Oversees the ongoing, upcoming, and prospective projects the company has. 

a)

C-Level Executives

b)

Project Managers

c)

Construction Managers

d)

General Foreman

4.

They typically have 15-20 years of experience working in that capacity before getting that title. They oversee two to three projects where they rely on the project managers to manage the day-to-day and instead, focus on making sure the higher-level stuff comes together, including a healthy client relationship.

a)

CEO, CFO, COO

b)

Project Managers

c)

Senior Project Managers

d)

Superintendent

5.

They are responsible for establishing protocols and communication streams, monitoring the execution of high0value items, tracking major schedule milestones, and complying with overall project requirements.

a)

CEO, CFO, COO

b)

Project Managers

c)

Senior Project Managers

d)

Superintendent

6.

They are in charge of making sure the day-to-day needs of a project are carried out correctly. They are responsible for maintaining the schedule and organizing resources, monitoring the budget, making purchasing, invoicing, design and drawing development, project documentation and file management, tracking approvals and authorizations, contracts and other legal matters, and coordination between parties.

a)

Project Managers

b)

Superintendents

c)

C-Level Executives

d)

Contractors

7.

All of the following are part of the scope of the full-time supervision service except for:

a)

Quality Control

b)

Evaluation of Construction work

c)

Cost and Time Control

d)

Filing of Documents

8.

SPP Document 205 contains the standards for:

a)

Specialized allied Services

b)

Regular Design Services

c)

Post-Design Services

d)

Post-Contruction Services

9.

SPP Document 203 contains the standards for:

a)

Specialized Architectural Services

b)

Specialized Allied Services

c)

Regular Design Services

d)

Post-Construction Services

10.

The construction management service is covered by which SPP Document?

a)

SPP 203

b)

SPP 204-a

c)

SPP 204-b

d)

SPP 205

11.

An architect who is also a landscape architect is especially suited for which specialized architectural service?

a)

Site Development Planning

b)

Site Selection and Analysis

c)

Comprehensive Development Planning

d)

Site Utilization and Land Use Studies

12.

Which is not a specialized architectural service?

a)

Preparation of the drawings and specifications for acoustic design and treatment, sound control and reinforcement, sound absorption, reflectance, insulation, etc.

b)

Preparation of framework and conceptual master development plans (FRDPs and CMDPs) and report/s from relevant information gathered by other disciplines.

c)

Formulation of methods of rating and ascertaining the value of structures or facilities which must be fully secured, kept safe, protected, assured, guaranteed and provided with sufficient safeguards for the conduct of any work or activity

d)

Producing and coordinating the additional activities necessary for promotional activities in order to develop and generate financial support for and acceptance of the project from governing agencies or from the general public

13.

The orderly arrangement within a piece of land on which vertical structures such as buildings, monuments and the like, as well as horizontal developments such as rights-of-way, open spaces, and activity spaces are to be proposed

a)

Site Planning

b)

Physical Planning

c)

Environmental Planning

d)

Comprehensive Planning

14.

The detailed planning and design of the indoor areas of any proposed building, including retrofit, renovation, rehabilitation or expansion work, including the architectural laying out of all building engineering systems

a)

Space Planning

b)

Architectural Interiors

c)

Space Management Studies

d)

Regular Design Service

15.

Design Build Services is in what SPP Document?

a)

205

b)

207

c)

206

d)

208