1.

If an architect is hired to design a supermarket with construction cost of 40M pesos, how much should he/she charge as Recommended Professional Fee under a DAEDS (Detailed Architectural and Engineering Design Services) arrangement? 

a)

5%

b)

6%

c)

7%

d)

8%

2.

Why does an Architect need an Accountant?

a)

To know if he/she is financially stable

b)

To keep his books and accounts in order

c)

To hide his income

d)

8%To prepare his/her SALN

3.

If the owner requests additional work (e.g. revisions in construction drawings) from the architect due to change orders, what method of compensation should the Architect employ?

a)

Cost Method

b)

Lump Sum

c)

Percentage of Construction Cost

d)

Time-based method like MDPE

4.

The material specified in the contract is not readily available in the market and waiting for it will incur a substantial delay and consequently losses. Who can have it replaced by a suitable material?

a)

Contractor

b)

Architect-In-Charge of Construction

c)

Architect-of-Record

d)

Owner

5.

An Architect makes a miniature model of the project for his own design study.  Who should pay for it?

a)

Architect

b)

Project Manager

c)

Contractor

d)

Owner

6.

According to the compensation guidelines, how much of the architect’s fee is for the civil liability for the design mandated by Article 1723 of the Civil Code?

a)

15%

b)

10%

c)

5%

d)

NOT SPECIFIED IN THE GUIDELINES

7.

What is the standard progress of payment for an Architect’s fee based on project phase?

a)

 5%-10%-35%-85%-95%-100%

b)

5%-15%-35%-85%-95%-100%

c)

5%-20%-40%-9-%-100%

d)

5%-15%-35%-85%-100%

8.

Which is NOT a standard method of payment for Pre-Design Services?

a)

ultiple of Direct Personnel Expenses 

b)

Professional Fee Plus Expenses

c)

Percentage of Project Construction Cost

d)

Lump Sum or Fixed Fee

9.

After the initial meeting/conversation/correspondence with the Client, the Architect must now submit his proposal for pre-design services which does not include:

a)

Scope of Works

b)

Manner of Payment

c)

Owner's Responsibility

d)

Project Construction Cost

10.

A Client hires an Architect to prepare the Plans and corresponding Documents for his project. However, after the completion of all Plans and Documents and eventual submission/acceptance, the Client changes his mind and decided not to implement the Plans for construction. How much is the Architect compensated?

a)

85%

b)

60%

c)

75%

d)

90%

11.

A Client is very happy with the Plans his Architect made for his house. He decided that he will use the same Design/Plans for his son’s house. How much will the Client pay the Architect for this 2nd house.

a)

85%

b)

60%

c)

75%

d)

90%

12.

Who is responsible for the fee of an additional Full-time Supervisor at the Project?

a)

Architect

b)

80% of RPF

c)

70% of RPF

d)

50% of RPF

13.

Who is responsible for the compensation of specialized architectural services (e.g. architectural interiors, acoustic design, etc.)?

a)

Architect

b)

Owner

c)

Contractor

d)

Sub-Contractor

14.

Who is responsible for the fee of an additional Full-time Supervisor at the Project?

a)

Architect

b)

Owner

c)

Contractor

d)

Sub-contractor

15.

A full-time supervisor hired by the Owner should report technical matters to the

a)

Architect

b)

Owner

c)

Contractor

d)

No one. He is the supervisor.

16.

A full-time supervisor hired by the Owner on behalf of the Architect-of-Record is called

a)

Site Architect

b)

Site Inspector

c)

Project Representative

d)

Project Engineer

17.

If an Architect is hired as a Facilities Manager, how is he compensated?

a)

Lump Sum

b)

Salary

c)

Gross Rental %

d)

Project Engineer

18.

When the architect’s fee is a percentage of the construction cost, the fee should ultimately be a percentage of which?

a)

Probable Project Construction Cost

b)

Awarded Project Construction Cost

c)

. Final Project Construction Cost

d)

 Estimated Project Construction Cost

19.

When the architect is hired to prepare a physical plan for a project 5 hectares in area, how much is the Recommended Professional Fee?

a)

PHP 120K

b)

PHP 150K

c)

PHP 180K

d)

PHP 250K

20.

In a design-build arrangement, who pays for the cost of permits and required licenses for construction?

a)

The architect

b)

The owner

c)

The excavation contractor

d)

The project manager

21.

Which is NOT part of Pre-Design Services (SPP Doc 201)?

a)

Feasibility Studies

b)

Equipment Evaluation

c)

Consultation

d)

Site Selection and Analysis

22.

Which is NOT part of Pre-Design Services (SPP Doc 201)?

a)

Space Planning

b)

Space Management

c)

Architectural Research

d)

Schematic Design

23.

Architectural Programming, Research, Site Selection and Analysis, Feasibility Studies, Space Planning, Space Management and Value Management, etc are part of what services?

a)

Specialized Architectural Services

b)

Pre-Design Services

c)

Comprehensive Arch’l Services

d)

Fulltime Services

24.

Which is NOT part of Pre-Design Services (SPP Doc. 201)?

a)

Site Selection and Analysis

b)

Site Utilization and Land-use Studies

c)

Urban Planning

d)

 Space Management Studies

25.

The detailed analysis of the site that involves the identification of a site’s development potentials through the proper utilization of land. It covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs.

a)

Feasibility Study

b)

Site Selection and Analysis

c)

Environmental Impact Study

d)

Site Utilization & Land-Use Study

26.

What type of architectural service is provided for site utilization and feasibility studies? 

a)

Regular Design Services

b)

Pre-Design Services

c)

 Specialized Architectural Service

d)

Pre-Construction Services

27.

Which is NOT part of Specialized Architectural Services (SPP Doc. 203)?

a)

 Architectural Interiors

b)

Acoustic Design

c)

Site Development Planning

d)

Site Utilization

28.

Under Regular Design Services (SPP Doc 202), what comes next after Design Development Phase?

a)

 Contract Document Phase

b)

 Bidding Negotiation Phase

c)

Construction Phase

d)

 Project Definition Phase

29.

Which is NOT part of Regular Design Services (SPP Doc 202)?

a)

Design Development 

b)

Architectural Programming

c)

Contract Document

d)

Schematic Design

30.

When must the Architect properly locate/ site a building with respect to natural and man-made hazards that may be found or proximate to the site and like consideration?

a)

Answer not among the choices

b)

During Contract Documentation

c)

Sometime during Design Development

d)

At the Schematic Design Phase of the work