2024 DCC40132 - Chapter 1 - Activity A

Total questions: 35

Worksheet time: 2hrs 45mins

Name
Class
Date
1.

Overview Of Project Management consisting of all the item shows, EXCEPT ______

a)

Quality

b)

Time

c)

Cost

d)

Materials

2.

Definition of Project Management is the application of knowledge, skills, tools, and techniques to   project activities to meet the project requirements

a)

True

b)

False

3.

Characteristic Of Civil Engineering Project as listed below, EXCEPT for _____

a)

Specified Target

b)

Flexible

c)

Uncertainty

d)

Unlimited Time

4.

Characteristic Of Civil Engineering Project as listed below, EXCEPT for _____

a)

No Risk

b)

Adapt to work

c)

Total cost fluctuate

d)

Satisfy Owners Requirement & Expectation

5.
The main reasons for projects failure are:
a)
Time management; Costs management; Scope Management and Quality Management
b)
Only Time and Cost Management
c)
Only Scope and Quality Management
d)
Generally Cost Management because you can never have enough money to complete most projects
6.
What are the four characteristics of a project?
a)
Concept, Development, Test and Development
b)
Temporary endeavor; Definite beginning and end; Several phases and Unique output
c)
Input; Process; Output and Feedback
d)
Define the problem; Brainstorm; Generate ideas and Select an approach
7.
The major differences between  projects and operations are:
a)
Projects are ongoing and operations are short
b)
Projects should always be done by engineers and operations may be performed by technicians
c)
Projects are temporary and operations are ongoing
d)
Projects and operations are the same thing but projects always costs more to implement
8.
Which of the following is an example of a project?
a)
Inventing a new prototype for a drone
b)
Assembling several complex drones in a production plants using robotics
c)
Manufacturing automobiles at the Kia plant
d)
Utilizing robotics to lift heavy packages at a UPS distribution plant during the busy holiday season 
9.
The five phases of project management are:
a)
Defining the problem; Brainstorming; Developing a solution; Designing a prototype and Closing the project 
b)
Inputting; Processing; Outputting; Closing and Giving Feedback 
c)
Initiating; Planning; Executing; Monitoring & Control and Closing
d)
Designing; Developing; Testing; Evaluating and Closing 
10.
Some of the skills of a good project manager are:
a)
Leadership; Communication; Information Technology; Accounting and Purchasing
b)
Dancing; Rapping; Singing; Acting and Purchasing
c)
Leadership and Information Technology only
d)
Communication and Accounting only
11.

Key discipline in Project Management _____ (can click more than one)

a)

Silo mentality

b)

Selfish

c)

Motivating

d)

Controlling

12.

Main reason for project failure _____ (can click more than one)

a)

Poor project administration

b)

Team members not perform

c)

Poor communication

d)

Lack of communication with sponsor

13.

Completion of task on time depends on ____(can click more than one)

a)

Number of people

b)

Skills

c)

Experience

d)

Equipments

14.

Any change in SCOPE will impact (can click more than one)

a)

Cost

b)

Quality

c)

Morale

d)

Time

15.

These are the advantages of design and build project EXCEPT :

a)

Single point of responsibility for the Employer

b)

Reduces conflicts between Contractor and Designer

c)

Allows for value engineering and presents opportunities

for the contractor to increase profit

d)

The client has less control and influence over design matters

16.

The following are the methods of procurement in construction industry except

a)

Traditional method

b)

Turnkey method

c)

Short slender method

d)

Design and build method

17.

What is the type of method so that it could be sold to any buyer as a complete product?

a)

Traditional method

b)

Design and build method

c)

Management method

d)

Turnkey method

18.

Which factors to be considered when deciding which type of contract?

a)

Period of performance

b)

Cost analysis

c)

Availability of supervision

d)

All above

19.

Match the word "lump sum" with its meaning:

a)

one payment

b)

money not spent

c)

an extra amount of money

d)

an agreed payment that does not change

e)

higher costs than originally forecast

20.

Match the word "cost overrun" with its meaning:

a)

one payment

b)

money not spent

c)

an extra amount of money

d)

an agreed payment that does not change

e)

higher costs than originally forecast

21.

Match this description to one of three types of contract:

"design and build"

a)

lump sum

b)

cost plus

c)

turnkey

22.

Match this description to one of three types of contract:

"fixed amount of money"

a)

lump sum

b)

cost plus

c)

turnkey

23.

Match this description to one of three types of contract:

"cost of materials and labour plus extra payment "

a)

lump sum

b)

cost plus

c)

turnkey

24.

Match the word "fixed fee" with its meaning:

a)

one payment

b)

money not spent

c)

an extra amount of money

d)

an agreed payment that does not change

e)

higher costs than originally forecast

25.

In traditional procument, A is

(a)  

26.

In traditional procument B is (a)  

27.

In traditional procument D is (a)  

28.

Traditional method sequence of work, A is

a)

Brief

b)

Design

c)

Competition

d)

Construction

29.

Traditional method sequence of work, B is

a)

Brief

b)

Design

c)

Competition

d)

Construction

30.

Traditional method sequence of work, C is

a)

Brief

b)

Design

c)

Competition

d)

Construction

31.

Traditional method sequence of work, D is

a)

Brief

b)

Design

c)

Competition

d)

Construction

32.

In design & build, A is __

a)

Employer

b)

Design & Build Contractor

c)

Contractor

d)

Sub-contractor

33.

In design & build procument, B is

(a)  

34.

In design & build procument, F is

(a)  

35.

A is_____

a)

Government or Client

b)

Contractor

c)

Project Infra

d)

Sub contractor