Odoo 1 - MRP (1)

Total questions: 24

Worksheet time: 20mins

Name
Class
Date
1.
What does MRP stand for?
a)

Material Requirements Planning

b)

Mutual Recognition Procedure

c)

Manufacturing Ready Position

d)

Manufacturers' Recommended Price

e)

Material Resources Planning

2.
Does Odoo 16.0 allow to have different BoMs for different product variants?
a)
Yes
b)
No
3.
What methods are there to auto-create MOs upon SO confirmation?
a)
Sales setting: Immediate Production
b)
Manufacturing setting: Immediate Production
c)
MTO: Stock routes/rules
d)
Reordering rules
e)
Dropshiping
4.
Can by-products be manually modified or added in MO?
a)
Yes
b)
No
5.
How many manufacturing units will be in the auto-generated MO after a SO of 5 units of Large Table (Hard Wood) is confirmed?
a)

5.0

b)

20.0

c)

15.0

d)

10.0

e)

0.0

6.
Why the Component Status of this MO is yellow?
a)

The MO is not planned

b)

The hardware component is not reserved

c)

Components are not consumed

7.
Which of the following statement(s) are TRUE?
a)

If the Component Status field on MO is Available, its color can ONLY be green

b)

If the Component Status field on MO is Available, the MO's "Manufacturing Readiness" must be Ready

c)

If the Component Status field on MO is Not Available, its color can only be red

d)

If the Component Status field on MO is "Exp <date>", its color can ONLY be yellow and all materials are expected to be available on <date>

8.
In Odoo 16.0, if a workorder A is blocked by another workorder B, can the workorder A be started without finishing the workorder B?
a)
Yes, but it will show the scheduling information that B needs to be started prior to A
b)
No, and it will show the workorder sequence conflict
c)
Yes (without message)
9.
What is the Suggested Replenishment for Leg (Oak) in Jan 2023?
a)

10.0

b)

5.0

c)

15.0

d)

8.0

10.
What is the Suggested Replenishment for Leg (Oak) in Feb 2023?
a)

10.0

b)

5.0

c)

15.0

d)

8.0

11.
In Odoo 16.0, what happens to subcontracting BoMs after turning off the Subcontracting setting?
a)
Subcontracting BoMs are archived
b)
Subcontracting BoMs fall back to normal manufacturing BoMs ("Manufacture this product" BoM type)
c)
Subcontracting BoMs are deleted
d)
Not possible to turn off the setting while there are still subcontracting BoMs active
12.
Where can you specify that your product should be a subcontracted one?
a)
On the Bill of Materials
b)
On the Product Form
c)
On the Route
d)
On the Work Center
e)
On the Operation
13.

Which color will the cell turn into if you update the quantity from 20 to 12?

a)

Green

b)

Yellow

c)

Red

d)

Grey

14.
Which of the following statement(s) are TRUE?
a)

User CANNOT create an MO without BoM

b)

User CANNOT create an MO with subcontracting BoM or Kit BoM

c)

User can start a WO with status "Waiting for components"

d)

User can start a WO with status "Waiting for another WO"

15.
Which of the following statement(s) are TRUE about merging MOs?
a)
MOs must be DRAFT or CONFIRMED states and their states be the same
b)
MOs must have the same BoM
c)
MOs must have the same work orders
d)
MOs must have the same components
e)
Cannot merge if additional components or by-products were added manually to any of them.
16.
What statements are TRUE?
a)

Cannot create MO for a service product

b)

Cannot create BoM for service product

c)

Cannot add service products into components of BoM

d)

User can create a BoM including a component is the same Finished Goods

17.

Which items will be included in the Delivery Order when we confirm a SO with a Table Kit? (see the attached image to know the BoM Structure)

a)

Wood Panel, Bolt

b)

Wood Panel, Ply Layer, Wear Layer, Bolt

c)

Table Kit

d)

Ply Layer, Wear Layer, Bolt

18.

Which items will be included in the Delivery Order when confirming an SO with a Table Kit? (see the attached image to know the BoM Structure)

a)

Wood Panel, Bolt

b)

Wood Panel, Ply Layer, Wear Layer, Bolt

c)

Table Kit

d)

Ply Layer, Wear Layer, Bolt

19.
How to view the BoM cost structure of a BoM?
a)

Click on "Cost Analysis" smart button

b)

Click on "Manufacturing Cost" smart button

c)

Click on "Overview" smart button

d)

Click on "Structure & Cost" smart button

20.
Is it possible to handle several manufacturing orders at the same work center, even if I set up an alternative one?
a)
No, that is not possible
b)
Yes, you can do it as many times as you want
c)
Yes, but you need to change the capacity of the primary work center.
d)
Yes, but you need to change the capacity of the alternative work center.
21.
Which of the following statement(s) are TRUE?
a)

On MO form, "Unbuild" button is only showed when state is Done

b)

On MO form, "Scrap" button is invisible in Canceled and Draft state

c)

On MO form, users CANNOT scrap components after MO is done

d)

On MO form, "Scrap" button is ONLY showed when state is Done

22.
Which of the following statement(s) are TRUE?
a)
MOs that are created from reordering rules have more reservation flexibility
b)
MOs that are created from MTO have more reservation flexibility
c)
MOs that are created from reordering rules have cross-document traceability
d)
MOs that are created from MTO have cross-document traceability
23.

2 steps in 2-step Manufacturing process of Odoo OOTB are:

a)

Pick components and then manufacture

b)

Manufacture and then check quantity

c)

Pick components, manufacture and then store products

d)

Manufacture and then store products

24.

Which statement(s) are TRUE about subcontracting process?

a)

You need to activate "Resupply Subcontractor on Order" Route for component(s)

b)

You need to activate "Resupply Subcontractor on Order" Route for finished goods

c)

You can dropship component(s) directly from other partners to subcontractors

d)

You CANNOT validate Receipt until Resupply transfer is done