FIDIC Basics

Total questions: 11

Worksheet time: 8mins

Name
Class
Date
1.

FIDIC stands for

a)

Federation Inspection De Ingenieurs Conseils

b)

Federation Integration De Interioran Console

c)

Federation Internationale Des Ingenieurs Conseils

d)

Federation Internationale De Console

2.

Which is the FIDIC book color for TURNKEY Projects

a)

RED

b)

YELLOW

c)

SILVER

d)

GOLD

3.

FIDIC, JCT, NEC, AIA are examples of

a)

Contract forms

b)

Contract Types

4.

As we move from ​​ (a)   to ​ (b)   , The Client Design risk is ​moving from ​ (c)   to ​ (d)  

Choose from the below words
RED
YELLOW
HIGH
LOW
5.

Match the following

a)

RED

1.

DBB

b)

YELLOW

2.

DB

c)

GOLD

3.

BOT

d)

SILVER

4.

EPC

e)

WHITE

5.

CONSULTANCY

6.

Reorder the following based on the TESTS during Construction (1 is High and 4 is lowest)

a)

RED

b)

YELLOW

c)

SILVER

d)

GOLD

1)
2)
3)
4)
7.

How many clauses in FIDIC 1999 Yellow BOOK

a)

21

b)

20

c)

18

d)

10

8.

How many clauses in FIDIC 2017 Yellow book

a)

20

b)

21

c)

18

d)

19

9.

If we are not okay with the clauses given in FIDIC, we can modify and use them

a)

Yes

b)

No

10.

The advantages of Traditional Method / Design-Bid-Build are

(Can tick more than 1 answer)

a)

Come out with high quality works.

b)

Client may obtain the best or lowest price

c)

Easier to be adopted

d)

Single - source management

11.

Design and build method.......

a)

Unique procurement route.

b)

Common method that has been used in construction industry.

c)

Requires constant involvement of the client.

d)

Can be seen as giving a single point of responsibility for delivering the entire project.