FIDIC stands for
Federation Inspection De Ingenieurs Conseils
Federation Integration De Interioran Console
Federation Internationale Des Ingenieurs Conseils
Federation Internationale De Console
Which is the FIDIC book color for TURNKEY Projects
RED
YELLOW
SILVER
GOLD
FIDIC, JCT, NEC, AIA are examples of
Contract forms
Contract Types
As we move from (a) to (b) , The Client Design risk is moving from (c) to (d)
RED
DBB
YELLOW
DB
GOLD
BOT
SILVER
EPC
WHITE
CONSULTANCY
Reorder the following based on the TESTS during Construction (1 is High and 4 is lowest)
RED
YELLOW
SILVER
GOLD
How many clauses in FIDIC 1999 Yellow BOOK
21
20
18
10
How many clauses in FIDIC 2017 Yellow book
20
21
18
19
If we are not okay with the clauses given in FIDIC, we can modify and use them
Yes
No
The advantages of Traditional Method / Design-Bid-Build are
(Can tick more than 1 answer)
Come out with high quality works.
Client may obtain the best or lowest price
Easier to be adopted
Single - source management
Design and build method.......
Unique procurement route.
Common method that has been used in construction industry.
Requires constant involvement of the client.
Can be seen as giving a single point of responsibility for delivering the entire project.