wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Read and Interpret plans

Total questions: 20

Worksheet time: 13mins

Name
Class
Date
1.

What type of drawing is this known as?

a)

Elevation

b)

Pictorial

c)

Section

d)

Floor plan

2.

Which of the following can be found on a site plan?

a)

Footing sizes

b)

Floor surfaces and coverings

c)

Roof shapes and overhangs

d)

Block dimension and contour lines

3.

What does this drawing symbol represent?

a)

Ground Level

b)

Clean Fill

c)

Earth

d)

Brickwork

4.

Which of the following is not a construction drawing?

a)

Site plan

b)

Floor plan

c)

Conservation

d)

Elevation

5.

Why does an engineer carry out soil tests on a block of land before completing the construction drawings?

4 lines
6.

Which type of construction drawing gives a vertical cut-away view of the building through the footings, floor, walls, ceiling and roof structure?

a)

Pictorial

b)

Section

c)

Engineers detail

d)

Elevation

7.

Who approves drawing and specifications before building commences?

a)

Engineers

b)

Builder

c)

Council

d)

The client

8.

What information can be found on a floor plan?

a)

Door and window placements

b)

Boundary set-backs

c)

Lot number

d)

Roof coverings and slope

9.

What does this symbol represent?

a)

Steel

b)

Concrete

c)

Land fill

d)

Sand

10.

What does this symbol represent?

a)

Single skin brickwork

b)

Cladding

c)

Trimmer stud

d)

Blockwork

11.

What does this symbol represent on a plan?

a)

Vanity

b)

Water closet

c)

Bath

d)

Shower

12.

What does this symbol represnt on a plan?

a)

Flooring joists

b)

Shed rafters

c)

Insulation

d)

Roof trusses

13.

What does this symbol represent on a plan?

a)

Fill

b)

Ground level

c)

Earth

d)

Gravel

14.

What type of drawing is this?

a)

Engineers detail

b)

Elevation

c)

Floor plan

d)

Section

15.

What type of roof can be identified from the picture?

a)

Skillion

b)

Hip

c)

Gable

d)

Dutch gable

16.

A soffit is...

a)

External ceilings on the underside of rafters.

b)

Skirting and architraves

c)

Plumbing fit off

d)

External wall cladding

17.

What is the metal covering on top of the brick wall known as?

a)

Ant Capping

b)

Flashing

c)

Termite barrier

d)

DPC

18.

What is the main purpose of a cavity in construction?

a)

Provides much needed air flow

b)

Allows room for insulation

c)

Helps drain excess water

d)

Allows bricks to expand and contract

19.

Why do we use scale in plan drawings?

a)

To make builders feel important

b)

Architects prefer it

c)

Bricklayers need scales to weigh their money.

d)

Assists trades with measurement, producing accuracy and perspective.

20.

What environmental factors are included in a set of plans?

a)

Usage of powertools and equipment

b)

Clean up and waste management

c)

Tip fees

d)

Battery and solar power tools only