SPP Doc. 203 - 209

Total questions: 20

Worksheet time: 20mins

Name
Class
Date
1.

SPP Doc. 203 is defined as what?

a)

Comprehensive Architectural Services

b)

Regular Design Service

c)

Specialized Construction Services

d)

Specialized Architectural Services

2.

Involves the detailed planning and design of the indoor/enclosed areas of any proposed building/structure, including retrofit, renovation, rehabilitation, or expansion work which shall cover all architectural and utility aspects.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Building Systems Design

d)

Forensic Architecture

3.

Space planning, architectural lay-outing and utilization of spaces within and surrounding a specific building/structure in relation with the existing natural and/or built environments.

a)

Site and Physical Planning

b)

Site Development Planning

c)

Building Systems Design

d)

Comprehensive Development Planning

4.

RPF for Site development Planning Services

a)

10-15% of Cost of Work

b)

12-15% of Cost of Work

c)

10-12% of Cost of Work

d)

15-20% of Cost of Work

5.

Refers to the orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments and the likes are to be proposed.

a)

Site Development Planning

b)

Urban Design

c)

Physical Planning

d)

Site Planning

6.

Requires a composite arrangement of several buildings/ structures and their requisite amenities, facilities, services and utilities within a natural or built setting

a)

Site Development Planning

b)

Urban Design

c)

Physical Planning

d)

Site Planning

7.

Recommended professional fee for Site and Physical Planning

a)

P50,000/ha for the first 5 has.

b)

P25,000/ha for the first 10 has.

c)

P50,000/ha for the first 10 has.

d)

P75,000/ha for the first 5 has.

8.

Concerned with the management and use of land as well as the conservation, preservation and upgrading of the human environment

a)

Building Testing and Commissioning

b)

Heritage Conservation

c)

Comprehensive Development Planning

d)

Building Environment Certification

9.

Recommends the systematic process of ensuring that a building/structure's array of systems is planned, designed, installed and tested to perform according to the design intent and the building's operational needs

a)

Building Testing and Commissioning

b)

Facilities Maintenance and Support

c)

Comprehensive Development Planning

d)

Building Environment Certification

10.

Estimating and placing value on the building/structure condition and defects, and on its repair and maintenance, including the required improvements

a)

Building Appraisal

b)

Forensic Architecture

c)

Building Estimate

d)

Contract Documentation

11.

SPP Doc. 204 A is otherwise known as?

a)

Full Time Construction Service

b)

Full Time Supervision Service

c)

Construction Management Service

d)

Post Construction Service

12.

RPF for Full time construction services

a)

3-5% of PCC

b)

2-2.5% of PCC

c)

1-1.5% of PCC

d)

2.5-5% of PCC

13.

SPP Doc. 204-B is otherwise known as

a)

Construction Management Service

b)

Full-Time Construction Services

c)

Comprehensive Architectural Services

d)

Post Construction Services

14.

Which is not a function of a construction manager?

a)

Serves as contractor

b)

Coordination and supervision

c)

Cost and Time Control

d)

Keeping of Records

15.

Legal liability of a construction manager in case equipment fail to function or if a portion of a building collapses

a)

Legally liable as he/she is paid by the owner

b)

No Legal Liability

c)

Liable for the Contract Documents

d)

Liable due to the deficiencies in the manner of construction

16.

RPF of regular design service for Design-Build Service by administration shall be ___ (Exclusive of the Architect's Fee)

a)

5% of PCC

b)

10% of PCC

c)

7% of PCC

d)

2.5% of PCC

17.

RPF of regular design service for Design-Build Service on a guaranteed maximum cost shall be ___ (Exclusive of the Architect's Fee)

a)

5% of PCC

b)

10% of PCC

c)

7% of PCC

d)

2.5% of PCC

18.

Method of compensation involving intermittent personal service

a)

Per Diem or Hourly Basis

b)

Retainer

c)

MDPE

d)

Salary Cost x Multiplier

19.

Method of compensation used when the services of a PCA is expected to be required at intervals over a period of time

a)

Per Diem or Hourly Basis

b)

Retainer

c)

MDPE

d)

Salary Cost x Multiplier

20.

SPP Doc. 209 is also known as

a)

Professional Architectural Consulting Services

b)

Post Construction Services

c)

Professional Allied Services

d)

Comprehensive Architectural Services