WorksheetsTransportation Engineering Definition (Page 2)
Total questions: 22
Worksheet time: 11mins
a segment of a circle (an arc) usually laid out in a field by the tangent to a curve.
curing
Circular curves
compound curve
clapotis
the pressure against a vertical wall due to the waves.
clapotis
concrete
cut or excavation
delay
refers to any material that consists of aggregate, such as sand, gravel and stones.
cross slope
cement
concrete
construction joint
these result when two curves of differing radius join one another.
compound curve
crossing conflict
construction joint
cost of borrow
joints provided in concrete cement like a separation to allow building components to move with respect to one another.
block cracking
continuously reinforced concrete pavement
cross slope
construction joint
a rigid pavement which has no traverse joint, except construction joint and expansion joint. (Note: Traverse - across or through)
continuously reinforced concrete pavement
contraction joint
expansion joint
crossing conflict
this is the cost of any material that has to be obtained in order to make a fill.
cross slope
clapotis
circular curve
cost of borrow
this traffic conflict occurs when they cross paths directly.
cross slope
curing
design speed
crossing conflict
is a safety factor that provides a drainage gradient so that the water will run off the surface.
cross slope
curing
cut or excavation
delay
the process of getting the required water and temperature after placing the cement.
deep water waves
delineator
density
curing
the operator moves a material where the existing ground is above the construction section.
cut or excavation
design speed
circular curves
concrete
primary consideration in designing geometric cross section for highways.
deep water waves
diagonal marking
drainage
diffraction
waves that is greater than 0.5
wave length
high waves
super waves
deep water waves
difference between the actual travel time.
late
delay
delineator
speed
reflecting device on the road to indicate alignment.
delineator
cross slope
construction joint
compound curve
is defined as the number of vehicle occupying a road usually measured in per mile or per km.
density
diffraction
distance separation
diurnal tides
define as the maximum safe speed that can be maintained over a section of highway.
drainage
density
delineator
design speed
markings which are placed on sealed portion in a road where traffic is not desired.
chevron marking
safety mark
design speed
diagonal markings
the speed of energy along the wave crest.
diffraction
drainage
distance gap
distance separation
a fraction of time a vehicle is present in a given time.
design speed
distance separation
distance gap
diffraction
reciprocal of density and also measured in per mile and per km.
distance separation
compound curve
linear curve
clapotis
tides which occurs only one high tide a day.
clapotis
diurnal tides
delineator
cross slope