Worksheetspre-historic times
Total questions: 10
Worksheet time: 5mins
The Construction Drawings is step number (a) in the design process.
The Pre-Design Process is step number (a) in the design process.
Construction the building happens in phase ____ of the design process.
Design Development process
Construction Drawings process
Pre-Design Process process
Bringing the Vision to Life process
Schematic Design process
Which of the following shows BRITAIN architecture?
Basilica di San Zeno Maggiore; Leaning Tower of Pisa
Notre Dame Cathedral; Canterbury Cathedral
Westminster New Palace; Crystal Palace
Riccardi Medici Palace; St. Peter's Square
Rough sketches of the building for the client to review happens in phase ____ of the design process.
Design Development process
Construction Drawings process
Pre-Design Process process
Bringing the Vision to Life process
Schematic Design process
Which of the following shows EARLY CHRISTIAN architecture?
St. Sophia, Constantinople; St. Mark, Venice
Pantheon; Forums; Bsilicas
Ziggurat of Ur; Persepolis; Hall of the Hundred Columns
Basilican Church; Baptiseries
Which of the following shows ROMANESQUE architecture?
Riccardi Medici Palace; St. Peter's Square
Basilica di San Zeno Maggiore; Leaning Tower of Pisa
Notre Dame Cathedral; Canterbury Cathedral
Westminster New Palace; Crystal Palace
SPP DOC 201
PRE-DESIGN SERVICES
(12)
REGULAR DESIGN SERVICES
(RDS) (6)
SPECIALIZED ARCHITECTURAL SERVICES
(23)
FULL-TIME SUPERVISION SERVICES
SPP DOC 208
COMPREHENSIVE ARCHITECTURAL SERVICES (5)
DESIGN-BUILD SERVICES (DBS) (2)
ARCHITECTURAL DESIGN COMPETITION (ADC)
PROFESSIONAL ARCHITECTURAL CONSULTING SERVICES (PACS)
SPP DOC 204 - A
PRE-DESIGN SERVICES (12)
REGULAR DESIGN SERVICES (RDS) (6)
SPECIALIZED ARCHITECTURAL SERVICES (23)
FULL-TIME SUPERVISION SERVICES
