wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

POM Revision Lessons 1-4

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

_____ must check ALL sections of his area including elevated platforms, during the course of each shift for abnormality.

a)

Manager

b)

Engineer

c)

Management

d)

Operator

2.

Standard operating procedure describe both _____ and administrative operational elements of an organization

a)

managerial

b)

mandatory

c)

technical

d)

educational

3.

Operators must be able to communicate information clearly over the radio, give a concise verbal handover and capable of writing a ______.

a)

written log

b)

report

c)

story

d)

thesis

4.

An operator must check ALL sections of his area including elevated platforms, during the course of each shift for _____.

a)

his record

b)

inspection

c)

abnormality

d)

his supervisor

5.

A shutdown can occur in an _____ when an ESD is pressed.

a)

equipment

b)

emergency

c)

elements

d)

extinguisher

6.

Identify the missing type of shutdown:

_____

Maintenance

Unit

Total

Emergency

a)

Indicating

b)

Insulation

c)

Isolation

d)

Item

7.

Which of the following is wrong regarding what can be observed by using your hearing?

a)

leaks

b)

alarms

c)

housekeeping

d)

vibration

8.

Which of the following is the wrong precaution to be taken when using your sense of smell?

a)

Smell the inside of a confined space or unmarked drum

b)

Be aware of unusual smells from gas leaks

c)

Wear a breathing apparatus when taking hydrogen sulfide gas sample

d)

Be attentive of leaking oil drum

9.

Which of the following an emergency shutdown cannot be activated?

a)

Instrument air failure

b)

Power supply to the whole plant failure

c)

Small leak on a water pipeline

d)

Large leak on a steam pipeline

10.

Operators are not just the 'EYES' and 'EARS' of the plant. They must use all of their senses to maintain the Safety of those working in the Plant. Which of the following statement is not correct?

a)

Look at whether around the Plant is clean

b)

Look if the running equipment is operating normally

c)

Look for any potential safety hazards

d)

Look for any abnormalities and discuss with fellow operator and take no action

11.

Maintenance shutdown consists of shutting down, followed by fully isolating, _____ and purging an equipment or item to make it safe for maintenance work.

a)

pressuring

b)

draining

c)

increasing temperature

d)

increasing flow

12.

Which of the following is not the purpose for maintenance.

a)

Inspection

b)

Separating crude oil into petroleum components

c)

Upgrade system reliability

d)

Replacing a faulty equipment

13.

______ is normally shut down manually when it is no longer required for duty or during inspection or maintenance.

a)

ESD

b)

LOTO

c)

Double block and bleed

d)

Equipment

14.

______is a piece of metal installed between a pipeline flange for isolated fluids or for gases upstream and downstream.

a)

Gasket

b)

Blinding

c)

Mechanical seal

d)

Copper

15.

_____isolation must mean that equipment is isolated in such a way that there is no possible chance of recontamination.

a)

Positive

b)

Electrical

c)

Double block and bleed

d)

Vent

16.

A shutdown can occur in an emergency when an emergency shutdown button is _____.

a)

pulled

b)

pressed

c)

stopped

d)

isolated

17.

_________is two isolation valves with vent valve in between.

a)

Drain

b)

Single valve

c)

Spading

d)

Double block and bleed

18.

Operators must be able to communicate information clearly over the _____ , give a concise verbal handover and capable of writing a written log.

a)

walkie-talkie

b)

mobile phone

c)

shift handover

d)

platform

19.

__________ must be completely filled in, signed, dated and indicate why the plant must not be operated.

a)

Tags

b)

Danger locks

c)

Danger tags and locks

d)

Caution out of service tag

20.

An emergency shutdown occurs due to fire, major spills or gas release, will shutdown an equipment item as quickly as possible, then pressurize and drain equipment and lines to leave them in a safe condition.

a)

TRUE

b)

FALSE