wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

BLQ Case

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

 ASSIA clear view result is, No immediate action is recommended, your action is?

a)

Escalate to IU

b)

Inform customer to wait 3 days until tests done on the line ( Inform customer to leave CPE on during the 3 days )

c)

Connect from main

2.

We should inform CST to leave CPE turned on while escalating BLQ case?

a)

TRUE

b)

FALSE

3.

line code is must set to adsl2+ or vdsl according to cst port 

a)

TRUE

b)

FALSE

4.

Line code for ADSL2+ is :

a)

G-992-5

b)

G-992-2

c)

G-992-3

5.

cst has Ticket in IU pool and passed SLA so you will:

a)

Create delay ticket and inform cst sla with 2 day 

b)

Create delay ticket and inform cst sla with 1 day 

c)

inform cst wait follow up call

6.

CST has ticket Need Optimization escalated in 10.00 PM and CST calling at 11.30 pm in same day so you will :

a)

Create delay ticket and inform cst 1 hour 

b)

Inform cst waiting follow up call 

c)

Inform cst waiting SLA

7.

CST has BLQ ticket with update ( working from exchange ) without a visit update , right action is : 

a)

Re-Troubleshoot BLQ

b)

inform CST that the problem solved

c)

Re-escalate case to IU pool

8.

In BLQ case Clear View Result After Search is ( Technical dispatch is recommended ) , and after running the appropriate mode of Clear View result became ( No DSL Physical Layer is detected ) right action is :

a)

Escalate to IU

b)

Inform CST check with another CPE

c)

Check Diagnostic Tab In Line Details

9.

 Second time Escalation SLA in BLQ case is :

a)

2 Day

b)

1 Day

c)

2 Hour

10.

If customer has ADSL package, VDSL CPE and Port is ADSl , CCA should follow change offering process to change port from ADSL to VDSL in addition to handling the main case “ BLQ”

a)

TRUE

b)

FALSE