wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

استعني علي الشقا بالله

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

In Case Ticket BLQ have Update ( Main wire changed ) and Customer still have the same problem so the right action is :

a)

Re-Run the appropriate mode of Clear View

b)

Re-Escalate the Ticket Direct to IU

c)

Re-Troubleshoot as BLQ

2.

while troubleshooting physical instability , Clear View Result After Search "No DSL Physical Layer is detected " ,next action is :

a)

Check last fix date according to TTS and customer input at same time 

b)

Check connection type

3.

 In case CCA follow WCAP case and Cst is Line Status is Down and Matrix No have Logs , So CCA right action : 

a)

Should reset & configure

b)

 Escalate to IU

c)

Direct the customer to CSO to check the CPE

4.

In cst cst Refused Concession Result CCA Action Will create TT and should Mention 

a)

Ticket ID 

b)

secondary mobile & TT serial number

5.

If CST has Power Failure which of the following you will do with CST:

a)

Change the power led in CPE

b)

Check with another CPE with it's original adapter

c)

Check with another CPE and not necessary it's original adapter

6.

CST Follow voice down ticket after 25 hour from escalating it and ticket still on IU CCA action will be …?

a)

Re-escalate Ticket + create SR ​​FBB Tech Problem---​Voice Down​---​Re-Escalation

b)

Inform CST 1 D SLA +create SR ​​FBB Tech Problem---​Voice Down​---Follow Up

c)

Inform CST 1 D SLA + Create IR +create SR ​​FBB Tech Problem---​Voice Down​---Follow Up after SLA

7.

Line Problem SLA Is …. ?

a)

15 WD

b)

2 WD

c)

7 WD

8.

Our customers can not submit any tkt from WE APP:

a)

TRUE

b)

FALSE

9.

Which of the below devices is responsible for assigning WAN IPs to CPEs : 

a)

RADIUS

b)

BRAS

c)

DSLAM

10.

All Branches have same Working Hours and Days off  :

a)

TRUE

b)

FALSE