wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

ETHICS & CE FUNDAMENTAL CANONS

Total questions: 42

Worksheet time: 1hrs 17mins

Name
Class
Date
1.

It is sufficient that Engineers, in the fulfillment of their professional duties, carefully consider the safety, health, and welfare of the public.

a)

TRUE

b)

FALSE

2.

Engineers may perform services outside of their areas of competence as long as they inform their employers or clients.

a)

TRUE

b)

FALSE

3.

Engineers may issue subjective and partial statements if such statements are in writing and consistent with the best interests of their employers, clients, or the public.

a)

TRUE

b)

FALSE

4.

Engineers shall act for each employer or client as faithful agents or trustees.

a)

TRUE

b)

FALSE

5.

Engineers shall not be required to engage in truthful acts when required to protect the public health, safety, and welfare.

a)

TRUE

b)

FALSE

6.

Engineers may not be required to follow the provisions of state or federal law when such actions could endanger or compromise their employer or their clients' interests.

a)

TRUE

b)

FALSE

7.

If engineers' judgment is overruled under circumstances that endanger life or property, they shall notify their employers or clients and such other authority as may be appropriate.

a)

TRUE

b)

FALSE

8.

Engineers may review but shall not approve those engineering documents that are in conformity with applicable standards.

a)

TRUE

b)

FALSE

9.

Engineers shall not reveal facts, data...information without the prior consent of the client or employer except as authorized or required by law or this Code.

a)

TRUE

b)

FALSE

10.

Engineers shall not permit the use of their names or associates in business ventures with any person or firm that they believe is engaged in fraudulent or dishonest enterprise, unless such enterprise or activity is deemed consistent with applicable state or federal law.

a)

TRUE

b)

FALSE

11.

Engineers having knowledge of any alleged violation of this Code, following a period of 30 days during which the violation is not corrected, shall report thereon to appropriate professional bodies and, when relevant, also to public authorities, and cooperate with the proper authorities in furnishing such information or assistance as may be required.

a)

TRUE

b)

FALSE

12.

Engineers shall undertake assignments only when qualified by education or experience in the specific technical fields involved.

a)

TRUE

b)

FALSE

13.

Engineers shall not affix their signatures to plans or documents dealing with subject matter in which they lack competence, but may affix their signatures to plans or documents not prepared under their direction and control where they have a good faith belief that such plans or documents were competently prepared by another designated party.

a)

TRUE

b)

FALSE

14.

Engineers may accept assignments and assume responsibility for coordination of an entire project and shall sign and seal the engineering documents for the entire project, including each technical segment of the plans and documents.

a)

TRUE

b)

FALSE

15.

Engineers shall strive to be objective and truthful in professional reports, statements or testimony, with primary consideration for the best interests of the engineers' clients or employers. The engineers' reports shall include all relevant and pertinent information in such reports, statements, or testimony, which shall bear the date on which the engineers were retained by the clients to prepare the reports.

a)

TRUE

b)

FALSE

16.

ngineers may express publicly technical opinions that are founded upon knowledge of the facts and competence in the subject matter.

a)

TRUE

b)

FALSE

17.

Engineers shall not issue statements, criticisms, or arguments on technical matters that are inspired or paid for by interested parties, unless they have prefaced their comments by explicitly identifying the interested parties on whose behalf they are speaking and revealing the existence of any interest the engineers may have in the matters.

a)

TRUE

b)

FALSE

18.

Engineers may not participate in any matter involving a conflict of interest if it could influence or appear to influence their judgment or the quality of their services.

a)

TRUE

b)

FALSE

19.

Engineers shall not accept compensation, financial or otherwise, from more than one party for services on the same project, or for services pertaining to the same project, unless the circumstances are fully disclosed and agreed to by all interested parties.

a)

TRUE

b)

FALSE

20.

Engineers shall not solicit but may accept financial or other valuable consideration, directly or indirectly, from outside agents in connection with the work for which they are responsible, if such compensation is fully disclosed.

a)

TRUE

b)

FALSE

21.

Engineers in public service as members, advisors, or employees of a governmental or quasi-governmental body or department may participate in decisions with respect to services solicited or provided by them or their organizations in private or public engineering practice as long as such decisions do not involve technical engineering matters for which they do not possess professional competence.

a)

TRUE

b)

FALSE

22.

Engineers shall not solicit nor accept a contract from a governmental body on which a principal or officer of their organization serves as a member.

a)

TRUE

b)

FALSE

23.

Engineers shall not intentionally falsify their qualifications nor actively permit written misrepresentation of their or their associate's qualifications. Engineers may accept credit for previous work performed where the work was performed during the period the engineers were employed by the previous employer. Brochures or other presentations incident to the solicitation of employment shall specifically indicate the work performed and the dates the engineers were employed by the firms.

a)

TRUE

b)

FALSE

24.

Engineers shall not offer, give, solicit, nor receive, either directly or indirectly, any contribution to influence the award of a contract by a public authority, or which may be reasonably construed by the public as having the effect or intent of influencing the award of a contract unless such contribution is made in accordance with applicable federal or state election campaign finance laws and regulations.

a)

TRUE

b)

FALSE

25.

Engineers shall acknowledge their errors after consulting with their employers or clients

a)

TRUE

b)

FALSE

26.

CANON 1

4 lines
27.

CANON 2

4 lines
28.

CANON 3

4 lines
29.

CANON 4

4 lines
30.

CANON 5

4 lines
31.

CANON 6

4 lines
32.

CANON 7

4 lines
33.

FOUR FUNDAMENTAL PRINCIPLES

4 lines
34.

A set of standards by which a particular group decides to regulate its behavior. It is a system of moral principles by which human actions and proposals may be judged as good or bad. As a science, is to investigate the nature of the human act or human conduct.

a)

Morality

b)

Ethics

c)

Code of Ethics

d)

Business Ethics

35.

As a set of principles that serve to guide the professionals in their daily work. It serves to maintain the integrity of the profession so that its members serve “society’s best interests.”

a)

Morality

b)

Ethics

c)

Code of Ethics

d)

Business Ethics

36.

Refers to the quality of goodness or badness in a human act.

a)

Morality

b)

Ethics

c)

Code of Ethics

d)

Business Ethics

37.

These are situations where professionals have an interest that, if pursued, might keep them from meeting their obligations to their employers or clients.

a)

Professional Conflict of Interest

b)

Conflicting Interest

38.

It means that a person has two or more desires that cannot all be satisfied given the circumstances.

a)

Professional Conflict of Interest

b)

Conflicting Interest

39.

A traditional construction project delivery method that involves the completion of three distinct phases in sequence.

a)

Design-Build

b)

Design-Bid-Build

c)

Construction Manager at Risk

d)

Job Order Contracting

40.

It includes creating a strategic plan for the project, creating a design, securing permits or entitlements, and gathering the labor and resources required for construction.

a)

Pre-Construction Phase

b)

Construction Phase

c)

Post-Construction Phase

d)

Procurement Phase

41.

The period of time spanning from when physical construction ends until project turnover to the owner takes place.

a)

Pre-Construction Phase

b)

Construction Phase

c)

Post-Construction Phase

d)

Procurement Phase

42.

Period that most people associate with construction projects, partially due to its visibility.

a)

Pre-Construction Phase

b)

Construction Phase

c)

Post-Construction Phase

d)

Procurement Phase