wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Woodworking Exam Prep

Total questions: 49

Worksheet time: 25mins

Name
Class
Date
1.

When using pneumatics what is compressed in order to operate?

a)

Oil

b)

Water

c)

Air

d)

Hydraulics

2.

What organization create the code that must be followed when installing electrical components like motors and wiring?

a)

OSHA

b)

NEC

c)

OSHA

d)

IEEE

3.

What document provides information on how to handle and store chemicals, paint, and other hazardous materials?

a)

Safety Data Sheet (SDS)

b)

Emergency Evacuation Plan

c)

GANNT Chart

d)

Lock-Out Tag-Out Procedure Manaul

4.

Which type of battery is designed for frequent recharging and has a longest lifespan between charges? (Is often used in technology based devices and cordless power tools)

a)

Alkaline

b)

NiCad

c)

Lead Acid

d)

Lithium Ion

5.

What purpose does a relief valve serve?

a)

Maintains Flow

b)

Stops Excessive Flow

c)

Maintains adequate Pressure

d)

Cools the Liquid

6.

What view in 3D modeling shows a parts inside detail?

a)

Section

b)

Top

c)

Side

d)

Front

7.

Which of the following is a fixed cost?

a)

Lumber for Building

b)

Rent

c)

Shingles for Roofing

d)

Nails

8.

Which of the following is a variable cost?

a)

Materials for manufacturing

b)

Utilities

c)

Employee Salary

d)

Rent

9.

When converting from AC to DC electric what device is necessary in order to maintain DC voltage?

a)

Service Access Panel

b)

Circuit Breaker

c)

Grounding Rod

d)

Power Supply Regulator

10.

In 3D Modeling what type of view shows the inside of a part in software like inventor?

a)

Top

b)

Side

c)

Section

d)

Right Side

11.

If there is a water spill on the floor what type of surface concern is it?

a)

Load

b)

Confinement

c)

Hazardous waste

d)

Slip and Fall

12.

If there is a moisture concern in with a product, what can you measure to assure that you are within acceptable levels?

a)

Temperature

b)

Wind Speed

c)

Friction

d)

Humidity

13.

When applying a sealer to a project what step would it be completed of the process would it be completed in?

a)

Planing Joinery

b)

Sanding to a finish

c)

Finishing

d)

Assembly

14.

In redesigning a project what if you are starting with a completed project and have to disassemble it to complete the redesign. What type of engineering is this?

a)

Electrical Engineering

b)

Reverse Engineering

c)

Deconstructive Engineering

d)

Architectural Engineering

15.

Which of the following would be considered a variable cost?

a)

Rent

b)

Electric

c)

Materials

d)

Employee Salary

16.

If you are drilling a hole repeatedly in order to create multiple of the same product, and you notice after drilling many holes that the hole is getting smaller what may be occurring?

a)

You are using the wrong machine

b)

You are using the

c)

You put the drill bit in wrong

d)

Your drill but is showing sign of wear

17.

What type of manufacturing allows a 3-D casting of a part?

a)

Melting

b)

Conditioning

c)

Molding

d)

Printing

18.

In the 3D modeling program Inventor what would the easiest way to add a part to an existing project?

a)

Create an additional model

b)

Import a picture

c)

Import from a parts library

d)

Use another part

19.

What type of power system would you use in a heavy lifting application?

a)

Electric

b)

Pneumatic

c)

Hydraulic

d)

Mechanical

20.

What should you refer to if you need to repair a piece of equipment?

a)

A Friend

b)

Looking at the manufactures specifications

c)

Looking at the NEC handbook

d)

Looking at the materials being used

21.

If we needed to convert to 24 Volts Direct Current from 120 Volts Alternating Current what would be needed

a)

Step Up transformer

b)

Step Down transformer

c)

Capacitor

d)

Service Entrance Panel

22.
Id this hand signal.
a)
Slow down
b)
Come to me
c)
Move toward me
d)
Raise Equipment
e)
Lower Equipment
23.
Id this hand signal.
a)
Start engine
b)
Come to me
c)
Move toward me
d)
Raise Equipment
e)
Lower Equipment
24.
Id this hand signal.
a)
Move toward me
b)
Come to me
c)
Raise Equipment
d)
Lower Equipment
e)
Slow down
25.
Id this hand signal.
a)
Stop
b)
Come to me
c)
Move toward me
d)
Raise Equipment
e)
Lower Equipment
26.
Id this hand signal.
a)
Raise Equipment
b)
Come to me
c)
Move toward me
d)
Lower Equipment
e)
Slow down
27.
Id this hand signal.
a)
Move out
b)
Come to me
c)
Move toward me
d)
Raise Equipment
e)
Lower Equipment
28.
Id this hand signal.
a)
This far to go
b)
Come to me
c)
Move toward me
d)
Raise Equipment
e)
Lower Equipment
29.
Id this hand signal.
a)
Stop Engine
b)
Come to me
c)
Move toward me
d)
Raise Equipment
e)
Lower Equipment
30.
Id this hand signal.
a)
Lower Equipment
b)
Come to me
c)
Move toward me
d)
Raise Equipment
e)
Slow down
31.
Id this hand signal.
a)
Come to me
b)
Move toward me
c)
Raise Equipment
d)
Lower Equipment
e)
Slow down
32.
Id this hand signal.
a)
Speed up
b)
Come to me
c)
Move toward me
d)
Raise Equipment
e)
Lower Equipment
33.
ID this safety symbol
a)
Corrosive
b)
Slippery
c)
Poison
d)
Pinch Point
e)
Electric
34.
ID this safety symbol
a)
Corrosive
b)
Slippery
c)
Poison
d)
Pinch Point
e)
Electric
35.
ID this safety symbol
a)
Corrosive
b)
Slippery
c)
Poison
d)
Pinch Point
e)
Electric
36.
ID this safety symbol
a)
Corrosive
b)
Slippery
c)
Poison
d)
Pinch Point
e)
Electric
37.
ID this safety symbol
a)
Corrosive
b)
Slippery
c)
Poison
d)
Pinch Point
e)
Electric
38.
What is the overall length and width of this part?
a)
3mmx4mm
b)
3inx4in
c)
1.5mmx2mm
d)
1.5inx2in
39.
What is the minimum diameter dimension that the drilled hole can be?
a)
1.230"
b)
1.248"
c)
1.252"
d)
1.270"
40.
Which surface is on the front view?
a)
C
b)
D
c)
E
d)
B
41.
What is the surface finish specified on the print by the customer?
a)
1.2?
b)
1.4?
c)
1.6?
d)
1.8?
42.
When drawing a design, which should you use?
a)
Benchmark Standards
b)
Hippa Regulations
c)
ANSI Standards
d)
OSHA Standards
43.
Compiling all parts of a design into one complete design is known as?
a)
A part model
b)
An assembly model
c)
A prototype
d)
An isometric view
44.
In a sketch, a dash line represents
a)
An object line
b)
A section line
c)
A hidden line
d)
A dimension line
45.
Once a final solution has been determined for your product design, what should you do?
a)
Go on to the next project
b)
Inform your supervisor
c)
Ship it to the client
d)
Begin Production
46.
You are a design engineer whose firm is about to launch its newest product, the Wonder Widget. Which view should your marketing department use in the magazine advertisements?
a)
Isometric
b)
Top
c)
Front
d)
Side
47.
Which view of a drawing should show the most detail?
a)
Front
b)
Right
c)
Left
d)
Top
48.
Which view has the true height, width, and depth with the depth drawn at a 45 degree angle?
a)
Front
b)
Oblique
c)
Elevation
d)
Section
49.
Which describes the evaluation of another manufacturer's product to develop a similar product for your company?
a)
Modeling
b)
Plagarism
c)
Strategic Marketing
d)
Reverse Engineering