WorksheetsISTQB Foundation 10
Total questions: 40
Worksheet time: 10hrs 0mins
Given the following test activities and tasks. Which of the following BEST matches the activities with the tasks?
<br>
A. Test design B. Test implementation C. Test execution D. Test completion
<br>
1. Entering change requests for open defect reports
2. Identifying test data to support the test cases
3. Prioritizing test procedures and creating test data
4. Analyzing discrepancies to determine their cause
A-2, B-3, C-4, D-1
A-2, B-1, C-3, D-4
A-3, B-2, C-4, D-1
A-3, B-2, C-1, D-4
Given the following statements about the relationships between software development activities and test activities in the software development lifecycle:
<br>
1. Each development activity should have a corresponding testing activity
2. Reviewing should start as soon as final versions of documents become available
3. The design and implementation of tests should start during the corresponding development activity
4. Testing activities should start in the early stages of the software development lifecycle
<br>
Which of the following CORRECTLY shows which are true and false?
True – 1, 2; False – 3, 4
True – 2, 3; False – 1, 4
True – 1, 2, 4; False – 3
True – 1, 4; False – 2, 3
Given that the testing being performed has the following attributes:
<br>
• Based on interface specifications
• Focused on finding failures in communication
• The test approach uses both functional and structural test types
<br>
Which of the following test levels is MOST likely being performed?
Integration testing
Acceptance testing
System testing
Component testing
The reviews being used in your organization have the following attributes:
<br>
• There is a role of a scribe
• The purpose is to detect potential defects
• The review meeting is led by the author
• Reviewers find potential defects by individual review
• A review report is produced
<br>
Which of the following review types is MOST likely being used?
Informal Review
Walkthrough
Technical Review
Inspection
6-10, 6-15, 7-12
6-15, 9-11
6-10, 6-15, 9-11
6-15, 7-12
Which of the following BEST matches the descriptions with the different categories of test techniques?
<br>
1. Coverage is measured based on a selected structure of the test object
2. The processing within the test object is checked
3. Tests are based on defects’ likelihood and their distribution
4. Deviations from the requirements are checked
5. User stories are used as the test basis
<br>
Using notation for the following 4 options:
Black - Black-box test techniques
White - White-box test techniques
Experience - Experience-based test techniques
Black – 4, 5 White – 1, 2; Experience – 3
Black – 3 White – 1, 2; Experience – 4, 5
Black – 4 White – 1, 2; Experience – 3, 5
Black – 1, 3, 5 White – 2; Experience – 4
A fitness app measures the number of steps that are walked each day and provides feedback to encourage the user to keep fit. The feedback for different numbers of steps should be:
<br>
Up to 1000 - Couch Potato!
Above 1000, up to 2000 - Lazy Bones!
Above 2000, up to 4000 - Getting There!
Above 4000, up to 6000 - Not Bad! Above 6000 - Way to Go!
<br>
Which of the following sets of test inputs would achieve the BEST equivalence partition coverage?
0, 1000, 2000, 3000, 4000
1000, 2001, 4000, 4001, 6000
123, 2345, 3456, 4567, 5678
666, 999, 2222, 5555, 6666
1
2
3
4
A smart home app measures the average temperature in the house over the previous week and provides feedback to the occupants on their environmental friendliness based on this temperature. The feedback for different average temperature ranges (to the nearest °C) should be:
<br>
Up to 10°C - Icy Cool!
11°C to 15°C - Chilled Out!
16°C to 19°C - Cool Man!
20°C to 22°C - Too Warm!
Above 22°C - Hot & Sweaty!
<br>
Using BVA (only Min- and Max values), which of the following sets of test inputs provides the highest level of boundary coverage?
0°C, 11°C, 20°C, 22°C, 23°C
9°C, 15°C, 19°C, 23°C, 100°C
10°C, 16°C, 19°C, 22°C, 23°C
14°C, 15°C, 18°C, 19°C, 21°C, 22°C
DT1, DT2
DT2, DT3
DT2, DT4
DT3, DT4
OFF → WAIT → OFF → WAIT → TRICKLE → CHARGE → HIGH → CHARGE → LOW
WAIT → TRICKLE → WAIT → OFF → WAIT → TRICKLE → CHARGE → LOW → CHARGE
HIGH → CHARGE → LOW → CHARGE → TRICKLE → WAIT → TRICKLE → WAIT → TRICKLE
WAIT → TRICKLE → CHARGE → HIGH → CHARGE → TRICKLE → WAIT → OFF → WAIT
Write test summary reports based on the information gathered during testing
Review tests developed by others
Prepare and acquire test data
Analyze, review, and assess requirements, specifications and models for testability
Given the following examples of entry and exit criteria:
<br>
1. The original testing budget of $30,000 plus contingency of $7,000 has been spent
2. 96% of planned tests for the drawing package have been executed and the remaining tests are now out of scope
3. The trading performance test environment has been designed, set-up and verified
4. Current status is no outstanding critical defects and two high-priority ones
5. The autopilot design specifications have been reviewed and reworked
6. The tax rate calculation component has passed unit testing.
<br>
Which of the following BEST categorizes them as entry and exit criteria:
Entry criteria – 5, 6; Exit criteria – 1, 2, 3, 4
Entry criteria – 2, 3, 6; Exit criteria – 1, 4, 5
Entry criteria – 1, 3; Exit criteria – 2, 4, 5, 6
Entry criteria – 3, 5, 6; Exit criteria – 1, 2, 4
TC1 – TC3 – TC4 – TC6 – TC2 – TC5
TC4 – TC3 – TC1 – TC2 – TC5 – TC6
TC4 – TC1 – TC3 – TC5 – TC6 – TC2
TC4 – TC2 – TC5 – TC1 – TC3 – TC6
You are performing system testing of a train reservation system. Based on the test cases performed, you have noticed that the system occasionally reports that no trains are available, although this should actually be the case. You have provided the developers with a summary of the defect and the version of the tested system. They recognize the urgency of the defect and are now waiting for you to provide further details. In addition to the information already provided, the following additional information is given:
<br>
1. Degree of impact (severity) of the defect
2. Identification of the test item
3. Details of the test environment
4. Urgency/priority to fix
5. Actual results
6. Reference to test case specification
<br>
Which of this information is most useful to include in the defect report?
1, 2, 6
1, 4, 5, 6
2, 3, 4, 5
3, 5, 6
Given the following test activities and test tools:
<br>
1. Performance measurement and dynamic analysis
2. Test execution and logging
3. Management of testing and testware
4. Test design
<br>
A. Requirements coverage tools
B. Dynamic analysis tools
C. Test data preparation tools
D. Defect management tools
<br>
Which of the following BEST matches the activities and tools?
1 – B, 2 – C, 3 – D, 4 – A
1 – B, 2 – A, 3 – C, 4 – D
1 – B, 2 – A, 3 – D, 4 – C
1 – A, 2 – B, 3 – D, 4 – C
